Search Documents

  • DFI
    Design Parameter For Jacked Pile

    By Sugie Prawono

    Jacked pile is the only piling system in which the load capacity of the pile, at any penetration depth, could be monitored directly during its installation process. Each installed pile could have a gr

    Jan 1, 1999

  • SAIMM
    Split Shell Open Pit Design Concept Applied At De Beers Venetia Mine South Africa Using The Whittle And Gemcom Software

    In today?s high tech world, systems are getting bigger, faster, better. To remain at the leading edge, in any business, depends on accurate but flexible design thereby allowing operational managers

    Jan 1, 2001

  • CIM
    How the Mining Industry is Responding to Pressures for Change in the Management of Mine Waste

    By Don Welch

    Pressures for change ?Land use constraints ?Project financing ?Local communities ?Environmental issues ?Sustainability requirements ?Stricter regulatory procedures ?Technical excellence ?Reduc

    May 1, 2010

  • CIM
    Complex Networks on a Rock Joint

    By H. O. Ghaffari

    A complex network approach on a rough fracture is developed. In this manner, some hidden metric spaces (similarity measurements) between apertures profiles are set up and a general evolutionary networ

    May 1, 2009

  • AUSIMM
    Green Policies at Home and Abroad

    Green policies have gained momentum since the 1972 Stockholm, Environment Conference. The environmental movement has influenced political initiatives both in New Zealand and abroad. Governments and in

    Jan 1, 1990

  • SME
    Simulation Of Water Seepage Through And Stability Of Coal Mine Barrier Pillars (cd82e376-55f5-444d-97a9-eac4b7728369)

    By Y. Q. Zhang, Y. Luo, S. S. Peng, C. T. Holland

    Barrier pillars in underground coal mines could eventually be subjected to a hydraulic pressure head due to the build-up of mine water in the old workings. The pressure head could not only act as a fo

    Jan 1, 2001

  • SME
    Secondary Grouting at the Chattahoochee Tunnel

    By Judy B. Jones, Bradley A. Crenshaw, Theodore DePooter

    This paper reviews groundwater issues leading to a secondary grouting program at the Chattahoochee Tunnel that was implemented subsequent to the contact grouting program. The secondary grouting progra

    Jan 1, 2005

  • AUSIMM
    Accidents in the Broken Hill Mines

    The importance of the Broken Hill mining field may be gauged from the fact that since the discovery of the ore-body in 1883, till the end of 1931, approximately 43,000,000 tons of ore have been raised

    Jan 1, 1932

  • TMS
    The Direct Test Of Swell Stress For Geosynthetic Clay Liners

    By Junfeng Shen

    Geosynthetic clay liner (GCL) is a kind of waterproofing material used widely in engineering. The waterproof mechanism is understood in terms of bentonite particles becoming a water-obstructcolloid la

    Jan 1, 2006

  • ISEE
    600 000 M.T to move, a High Risk Operation

    By Jean-Sébastien Lambert, Serge Roberge

    "At the end of 2014, Holcim Canada (Demix Aggregates Division) considered the possibility of drillingand blasting a big volume of rock in order to expose a high-quality limestone bench in one of their

    Jan 1, 2016

  • CIM
    Spodumene Processing at TANCO

    By J. Flemming, R. O. Burt

    "The Tanco pegmatite is located in the Bird River greenstone belt of southeastern Manitoba approximately 160 km northeast of Winnipeg (Figure 1). This pegmatite body was discovered in 1929 and subsequ

    Jan 1, 1986

  • AUSIMM
    Hydrothermal Eruptions in Ore Forming Reservoirs: Analogues and Models

    By D O. Hayba

    Metal-rich slurries discharged from excess-enthalpy geothermal wells at Kawerau (NZ) indicate that an efficient ore precipitation mechanism operates in some feedzones. In our conceptual model, which t

    Jan 1, 1995

  • SME
    Rock Mechanics Of The Davis Detector Cavern ? Introduction

    By W. G. Pariseau

    This contribution describes rock mechanics features of the Davis Cavern at the former Homestake Mine in Lead, South Dakota, U.S.A. The mine is located in the northern Black Hills of South Dakota. In

    Jan 1, 2012

  • ISEE
    Journal: Musings of a Safety Philosopher Relating to Blasting Safety

    By Ralph Dawson

    The following additions to SLP-4 “ALWAYS AND NEVERS” have been approved by the Board of Governors since the last printing 6/97 and will be included in the next printing soon. They are also included in

    Jan 1, 2001

  • AUSIMM
    Performance of Electrodes Containing Brown Coal Char in Alumina Reduction (76ee41ec-7c9b-4d9b-9404-4c3cd7756bf3)

    A predicted increase in aluminium production and the possibility of a diminishing supply of petroleum coke for anode electrodes in alumina reduction cells makes it desirable to find alternative electr

    Jan 1, 1971

  • SME
    Geology Of The Biwabik Iron Formation And Duluth Complex

    By Mark A. Jirsa

    The Biwabik Iron Formation is a ~1.9 billion year-old sequence of iron-rich sedimentary rocks that was metamorphosed at its eastern- most extent by ~1.1 billion year-old intrusions of the Duluth Comp

    Jan 1, 2007

  • SME
    An Approach To Successful Development Of International Mineral Projects

    By T. L. Owen

    Since 1993 Cyprus Amax has brought $2.5 billion dollars of greenfield and expansion projects into production, taking it from a mid-sized domestic minerals company into a major international minerals o

    Jan 1, 2000

  • NIOSH
    OFR-18-90 Back Injuries In Underground Coal Mining

    By Terrence J. Stobbe

    The authors investigated the nature, cause and treatment of 234 back injuries which occurred in 156 different situations in underground coal mines. A detailed interview was conducted with each injured

    Jan 1, 1989

  • NIOSH
    Reservoir Simulation-Based Modeling for Characterizing Longwall Methane Emissions and Gob Gas Venthole Production

    By S. J. Schatzel, W. P. Diamond

    Longwall mining alters the fluid-flow-related reservoir properties of the rocks overlying and underlying an extracted panel due to fracturing and relaxation of the strata. These mining-related disturb

  • SME
    Construction Of The Pacheco Pumping Chamber And Shafts

    By Russell Clough

    The Pacheco Pumping Plant is situated on the west end of San Luis Reservoir in western Merced County, California. It is designed to draw water from the reservoir and pump it into a 3,500,000 gallon re

    Jan 1, 1985