Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
New Ideas on Gippsland Basin Regional TectonicsBy Colwell J. B, Constantine A. E
A unique, regional grid of deep (12 - 14 second record length), seismic reflection and refraction data has been recorded by the Australian Bureau of Mineral Resources (BMR) across the offshore Gipps
Jan 1, 1992
-
Analysis of the Uncertainty by the Random Finite Elements Method of a Vertical Load Test of a Piled Raft Founded in Tropical SoilBy Cristhian C. Mendoza, Renato da Cunha, Bernardo Caicedo, Max Barbosa
"Abstract This paper shows that a raft alone is not sufficiently appropriate to address the uncertainty of underlying soil variability; therefore, a piled raft system is a better option for mitigating
Jan 1, 2014
-
A Novel Approach to Recover Precious Values from Low-Grade Canadian OresBy V. I. Lakshmanan, D. A. Mackie
"1. INTRODUCTIONIn the past two decades, low-grade gold and silver ore bodies in the United States have been exploited by heap leaching, primarily with sodium cyanide solutions. This method has proven
Jan 1, 1989
-
BLASTCAD Three Dimensional Underground Blast Design SoftwareBy David Sprott, Patrick Andrieux
In 1990 the Noranda Technology Centre commenced a project to develop an interactive three-dimensional blast design system using a commercial computer-aided drafting and design package (CADD). The obje
Jan 1, 1991
-
Ross Goldfield - A VisionThe Ross Goldfield is a unique gold resource. From its discovery in 1865 there was a growing understanding of the geology of the deposit as mining moved from the surface at Jones Flat in the south to
Jan 1, 1993
-
Purification of solid from secondary aluminum smelting drossBy J. C. Escobedo, J. M. Almanza, A. Flores, Cortés. D. A.
Secondary aluminum dross, which has been exposed for several years to atmospheric conditions, was characterized using chemical analysis, X-ray diffraction, optical and scanning electronic microscopy,
Jan 1, 2005
-
OFR-35-88 Prediction Of Incipient Electrical-Component FailuresBy Jeffery L. Kohler
This final report on Bureau of Mines Contract J0338028 presents the results of a research effort to predict incipient failure in electric-power-system components. The development of continuous monitor
Jan 1, 1987
-
The Use Of Commercial Oxygen Probes During The Production Of High Titania SlagsBy J. M. A. Geldenhuis
This work is concerned with studying possible reactions in the ilmenite furnace which may control the product quality of both slag and metal. Two different approaches were followed: comparing actual f
Jan 1, 1999
-
Reservoir Engineering Equipment - A New System of Tools for Better Control and Interpretation of Drill-Stem TestsBy B. P. Nutter, M. Lebourg, J. A. McAlister
The Multi-Flow Evaluator (MFE) is a new system of tools providing an original approach in drill-stem testing. It improves control during the testing operation and gives a more accurate evaluation of t
Jan 1, 1966
-
RI 4164 Experiment in Underground Gasificaition of Coal, Gorpas, AlaBy James L. Elder, J. P. Capp, James J. Dowd
The Bureau of Mines and the Alabama Power Co., jointly, conducted the first experiment undertaken in the United States in underground gasification of coal in place, at Gorgas, Ala. Milton H. Fies, man
Aug 1, 1947
-
The Purification of Low-Grade Quartz Ore by Flotation and its MechanismThe Purification of Low-Grade Quartz Ore by Flotation and its Mechanism
Sep 13, 2010
-
Q-coda estimation in the Kaapvaal CratonBy D. Grobbelaar, A. Cichowicz, D. J. Birch
The Q-coda method for estimating the quality factor Q(f)= Qo(f)n was used to characterize seismic wave attenuation in a region of the Kaapvaal Craton that includes the mining areas of the Bushveld Com
Jan 1, 2015
-
The borehole monitoring experiment: field measurements of reservoir conditions and responses in longwall panel overburden during active miningBy S. J. Schatzel
In order to better understand the effects of longwall mining on the methane reservoir overlying the panel, the National Institute for Occupational Safety and Health/Pittsburgh Research Laboratory (NIO
Jan 1, 2009
-
New Application of Geophysics: Reduce Uncertainty in Subsurface Investigation for Deep Transmission Line Structure FoundationsBy Ralphie Adams, Tiana Rasmussen, Ashley E. Shirer
Transmission line foundation designers must rely on limited subsurface information, from easily accessible locations, resulting in subsurface uncertainty, increased design risk and increased construct
Sep 8, 2021
-
Design, Implementation, and Commissioning of the Gibraltar Development Plan 3By S. A. H Tyrrell, R. Rotzinger
"Taseko Mines Limited recommenced operation of the Gibraltar copper-molybdenum mine in 2004 and embarked on series of development projects to modernize the mine and increase throughput capacity. The G
Jan 1, 2014
-
Design, Construction And Start-Up Of The Ilo Smelter Modernization ProjectBy H. Walqui, C. Noriega
Southern Copper Corporation (SCC) is one of the world’s largest copper companies and is finishing the modernization of the Ilo copper smelter. A single ISASMELTTM furnace will start smelting 1,200,000
Jan 1, 2007
-
Copper Prices Help Arizona’s Mining IndustryBy William R. Yernberg
SME’s Arizona Conference was held at the Doubletree Hotel at Reid Park in Tucson on Dec. 5and 6, 2004. The annual conference is organized by the Arizona Conference Board of Directors, which represent
Jan 1, 2005
-
Design and Construction Performance of a Large Diameter Tunnel Constructed in Soft-Ground by the Stacked Drift MethodBy Paul H. Madsen, Victor S. Romero
The Tren Urbano project in Puerto Rico includes a 19 m diameter tunnel constructed by the stacked drift method, which involves installation of a pre-supported concrete arch using multiple tunnels. Geo
Jan 1, 2001
-
Statistical Evaluation Of The Effect Of Conditioning Time And Slurry Concentration On The Flotation Performance Of Siliceous PhosphateBy S. Al-Thyabat
Conditioning of flotation feed is an important prerequisite for efficient flotation. This process depends on parameters such as conditioning time, slurry concentration and slurry pH. The objective of
Jan 1, 2008
-
RI 4518 Examination, Mapping, And Sampling Of Mine Shafts And Underground Workings Leadville, Lake County, Colo.By Jr .. Ebbley
The investigation of mine shafts and underground workings at Leadville, Colo., was started in May 1946 and recessed in November 3, 1946. Thirty-eight shafts and connecting accessible underground worki
Jan 1, 1949