Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Direct Pressure Alkaline Leaching of Scheelite Ores and Concentrates Mining, Metallurgy and Exploration (Springer)By António Fiúza, Anthony Danko, Patrícia Leitão, Aurora Futuro, Cristina Vila, Lurdes Dinis
The average global recovery rates for processing scheelite ores by physical methods are normally in the range 50 to 70%, and it is problematic to attain a minimum grade of 60% WO3 in the concentrates
-
Evolving Soft-Ground Tunneling in SeattleBy Leon Maday, Robert Robinson, Judy Cochran, Don Davis
Over the past 20 years, several soft-ground tunnels have been successfully completed in the Seattle area. These tunnels were built using design-bid-build contracting methods, and have benefited from a
Jan 1, 2005
-
Assessing The Uncertainty Due To Grades And Grade Shell Limits For The West Leeville Underground DepositBy C. Deutsch
Resource estimation for the West Leeville deposit is prepared using a conventional explicit approach. The geologic model is developed using interpretive methods based on visual logging. Grade shells
Jan 1, 2007
-
Chambers Creek Interceptor Sewer TunnelBy J. Jeffrey Wagner, Michael J. Bailey, Peter M. Douglass
The Chambers Creek Interceptor Sewer Tunnel project consisted of 2-1/2 miles (4 kilometres) of nominal 9-foot (2.7-metre) O.D. tunnel driven through predominantly glacially overridden soils. Mole-Coll
Jan 1, 1985
-
Calcium Ion Activation Of Silica Surfaces With Sodium Oleate CollectorBy Y. I. Rabinovich, S. C. Brown
In the Florida phosphate industry, fatty acid collectors are used to separate phosphate ore from silica during the rougher flotation stage. However, the presence of multivalent ions (in particular Ca+
Jan 1, 2004
-
Key Regulatory Issues Planned And Controlled SubsidenceBy Gary E. Slagel
The year was 1974. The event - the United States Congress was embroiled over what issues should be included in the proposed national surface mining law. The question - what should be done with undergr
Jan 1, 1986
-
GIBE II Tunnel Project?Ethiopia: 40 Bars Of Mud Acting On The TBM ?Special Designs And Measures Implemented To Face One Of The Most Difficult Events In The History Of Tunneling?By Antonio De Biase
In October 2006, a 7m Double Shield TBM, boring through very poor volcanic formations, was pushed back by fluid mud, which presence had not been detected during previous field investigations, due to t
-
Invensys Showcase Highlights Process Control TechnologiesBy Steve Kral
In a lagging economy where profits are tight, businesses cut costs. No revelation there. The mining industry, though, has always looked for ways to reduce production costs — no matter the state of t
Jan 1, 2002
-
Conformation Of Chemisorbed Oleate At A Calcite SurfaceBy C. A. Young, J. D. Miller
The surface chemistry of the calcite/oleate flotation system was examined by in-situ FT-NIR/IRS. Spectra of combination and overtone bands of aliphatic stretching vibrations revealed gauche/trans con
Jan 1, 2002
-
Closure Concerns at Sonora Mining’s Jamestown MineBy Alan Dahlstrand
The Jamestown Mine is a 6.3-kt/d (7000-stpd) open-pit gold mining operation located in the central portion of California's historic Mother Lode district. Most early production from the Jamestown
Jan 1, 1995
-
The OCC Process: A New Method for Near Net and Net Shape CastingBy Hiroshi Soda, Atsumi Ohno, Hiroyuki Yamazaki, Alexander McLean
INTRODUCTION The method of heat removal during a casting process strongly influences the crystal morphology of the cast product and hence the metallurgical and mechanical properties of the solidif
Jan 1, 1990
-
Technical Innovations And Advances Make Wirtgen Surface Miner A Viable Alternative To Traditional Drill And Blast / Ripping OperationsBy R. Bauer
Adaptations and redesign of the existing already very successful and proven road milling machine concept and technical innovations such as an optimized, specifically for mining application developed c
Jan 1, 2007
-
Construction of the C710 Beacon Hill Station Using SEM in Seattle— “Every Chapter in the Book…”By Zephaniah Varley, Satoshi Akai, Richard Sage, Steve Redmond, Mike Murray, Rohit Shetty, Gerald Skalla
One would be hard pressed to find another project as complex as this one given its configuration, the variety of issues to address and the required construction techniques. Contract C710 is currently
Jan 1, 2007
-
Brightwater Conveyance System Will Expand Seattle?s Wastewater TreatmentBy John E. Newby
Washington?s King County is constructing a new regional wastewater treatment facility, called Brightwater, in response to growth in the greater Seattle region. Planning conducted in the late 1950s ide
Jan 1, 2007
-
Treating Refractory Gold OresBy Lane White
Refractory gold ores are those from which a significant percentage of the gold cannot be recovered by conventional cyanidation. Historically, roasting has been the primary method for rendering such or
Jan 1, 1990
-
A simplified approach to coal mine seal designBy M. M. Gadde
Recent regulatory changes in the United States make it mandatory to conduct structural analysis of coal mine seals used to isolate abandoned workings from active mining areas. Different loading criter
Jan 1, 2009
-
Lineament Analysis: Identification Of Structural Controls On Ground Instability In Surface And Underground Mines (b5ba2cd3-4de8-4cb0-9e01-83ff5030f620)By S. E. Phillipson, P. L. Tyrna
Lineament analysis, a remote sensing application for geological structures, has been criticized for reliance on subjective interpretations. The Mine Safety & Health Administration’s Roof Control Divi
Jan 1, 2002
-
BWARI Tunneling UnderwayBy Thomas L. Richardson, David R. Chapman, Gary W. Gilbert
The two contracts of the Big Walnut Augmentation/Rickenbacker Interceptor(BWARI) sewer project for the City of Columbus, Ohio total nearly 35,000 feet of 14and 12-foot diameter tunnel. EPB TBMs will i
Jan 1, 2005
-
How To Deliver Your Project On Time: An Owners? Procurement StrategyBy Wayne Green
The Regional Municipality of York, located north of the City of Toronto in Ontario, Canada, has experienced unprecedented growth during the past decade, with new home construction averaging 15,000 uni
Jan 1, 2010
-
Liberation Limited Dolomite Rejection from Pebble Phosphate in Gravity Concentration Mining, Metallurgy and ExplorationBy Chen-Luh Lin, Jan D. Miller, Sindhoora Puvvada
The depletion of good-quality phosphate resources, coupled by a need to supply acceptable products at a rapid rate, while meeting the specifications of fertilizer chemical plants, is of significant co