Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME
    Evaluation of Whole Body Vibration (WBV) of Dumper Operators Based on Job Cycle Mining, Metallurgy and Exploration (4615660d-b95c-47f0-b07e-3e2b55f50187)

    By Sandeep Kumar Jeripotula, Govinda Raj Mandela, Aruna Manglapady

    Dumper operators are frequently exposed to whole body vibration (WBV) in surface mines. Surface mining activities involve the amalgamation of comparatively high intensity of vibration and extended exp

  • SME
    Final Tunnel Liner at Mill Creek 3 Project - Case Study

    By M. Schafer

    The 20 foot diameter cast-in-place tunnel lining for Phase 3 of the Mill Creek Tunnel (MCT-3) has been completed. This paper will summarize aspects of liner design and address the construction approac

    Jan 1, 2008

  • SME
    Ground Freezing Under the Most Adverse Conditions: Moving Groundwater

    By Paul C. Schmall, Lucian P. Spiteri, Arthur B. Corwin

    Moving groundwater is generally recognized as the most adversarial condition for ground freezing. Moving groundwater can occur due to natural or man-induced groundwater flow, but either way may result

    Jan 1, 2007

  • SME
    Adventures in Microtunneling

    By Joseph Clare, Elizabeth Anderson, Mike McGinley, Ron Hines, Judy Cochran

    The South Lake Union Pipelines contract for King County Wastewater Treatment Division and Seattle Public Utilities in Seattle, Washington included three 1.8 m (72-in)inside diameter microtunneled pipe

    Jan 1, 2005

  • SME
    Improved Leaching Performance Of Chalcopyrite By Microbial Cultures Subjected To Mutation

    By J. Kang

    To obtain microbial cultures with the ability to efficiently leach copper ion from chalcopyrite, microbial samples from acid mine drainage sites were mixed and then subjected to mutation using sodium

    Jan 1, 2008

  • SME
    Optimization of Tellurium and Antimony Extraction from Residue Generated in Alkaline Sulfide Leaching of Tellurium-Bearing Alkaline Skimming Slag Using Central Composite Design Mining, Metallurgy and Exploration (e0c562d4-30bd-4458-b8cb-8e6a1cd409aa)

    By Qinghua Tian, Zhipeng Xu, Dong Li, Xueyi Guo, Liu Zhu

    A possible process for extracting tellurium and antimony from a residue generated in alkaline sulfide leaching of telluriumbearing alkaline skimming slag was proposed. The central composite design was

  • SME
    Rehabilitation of New Croton Aqueduct Shafts

    By W. James Marold

    The New Croton Aqueduct (NCA) was the first major water supply tunnel for New York City. The 50-km (31-mi) long tunnel has 33 open shafts 6 m (20 ft) to 121 m (397 ft) deep. The tunnel and shafts are

    Jan 1, 2008

  • SME
    Current Gold Rush in Madre de Dios Department, Peru

    By J. D. Bliss

    The discovery that triggered the current gold rush in southeastern Peru was made in about 1975 along the Rio Madre de Dios in Madre de Dios Department (Fig. 1). About 5000 to 10,000 miners (called chi

    Jan 1, 1992

  • SME
    Rehabilitation Risk Mapping System: Case Studies at the Turquoise Ridge Joint Venture, Nevada

    By L. Sandbak

    The TRJV Mine is located approximately 43 miles northeast of Winnemucca, along the east flank of the Osgood Mountains in the Potosi Mining District, Humboldt County, Northwest Nevada (see Figure 1).

    Feb 23, 2014

  • SME
    North Carolina Famous For North America?s Largest Emeralds

    By Wade Edward Speer

    The Hiddenite District of Alexander County, NC has produced some of the world?s finest large emeralds since the first one was discovered 134 years ago. In fact, North America?s largest emeralds come

    Jan 1, 2009

  • SME
    Creation Of An Underground Mine Development Sequencing Optimizer

    By M. J. Blattman

    Upon completion of an underground mine design, the planning engineer is faced with a surprisingly complex problem, “What development and mining sequence should be implemented so as to maximize the ret

    Jan 1, 2003

  • SME
    The Influence of Polysaccharides on Film Stability and Bubble Attachment at the Talc Surface Mining, Metallurgy and Exploration

    By Lei Pan, Venkata Atluri, Xuming Wang, Yuesheng Gao, Jan D. Miller

    The wetting characteristics and water film stability at the talc surface have been studied, particularly the effect of polysaccharides such as guar gum, starch, and dextrin. Talc is a gangue mineral i

  • SME
    International Project Management: Challenges For a Junior Mining Company

    By Andrew Kaczmarek

    The mining industry is enjoying a much needed and long awaited increase in demand for natural resources. However, consolidations in the mining and mining service industries, along with a generational

    Jan 1, 2006

  • SME
    Northeast Interceptor Sewer Case History

    By Brett Zernich, Michael Krulc, Brett Robinson

    This paper provides an account of the efforts undertaken to construct the Northeast Interceptor Sewer (NEIS) project, which is a portion of a much larger program in Los Angeles, California to upgrade

    Jan 1, 2005

  • SME
    What Will Halt The Worldwide Decline In Mine Equipment Performance?

    By R. Adsero

    The analysis of equipment trends in AUSIMM?s Revision of Monograph 19; Australasian Mining and Metallurgy Operating Practices (AMMOP) in the paper by Dight et al (in press) raised some interesting and

    Feb 27, 2013

  • SME
    MINExpo International 2000 and World Mining Congress Will Meet in Las Vegas

    The more than 40,000 mining industry professionals that are expected to attend the National Mining Association’s(NMA) MINExpo International2000 trade show and conference will be treated to the exhibit

    Jan 1, 2000

  • SME
    Owner Procured Tunnel Boring Machines––A Discussion

    By A. R. Biggart, A. Walters, G. J. E. Kramer

    The Owner Procurement Process or OPP is a proven, viable alternative contract delivery method that is potentially applicable to many tunnel projects. Using the OPP, the owner specifies and procures ma

    Jan 1, 2005

  • SME
    Planning to meet the required DPM concentration levels in underground mines ? a calibration model

    By k. Osei-Boakye

    This paper presents the calibration of a real-time aerosol monitor, the TSI DustTrak?, to the NIOSH 5040 method being used by the Mine Safety and Health Administration (MSHA) for compliance enforcemen

    Jan 1, 2009

  • SME
    High Performance Tunnel Boring Machine for Kárahnjúkar Headrace Tunnel, KAR-14—A Design and Case History

    By Brian Khalighi, Massimo Franceschi, Giovanni Giacomin, Gianni Porta

    Headrace Tunnels and parts of the Access Adit Tunnels of Kárahnjúkar Hydropower project, KAR-14, in Iceland will be excavated using three full-face Robbins Tunnel Boring Machines (TBM). TBM sizes rang

    Jan 1, 2005

  • SME
    Extraction Metallurgy Of Copper From Chalcopyrite Concentrates Without Sulfuric Acid Generation Via Chlorination III. Integration Of Gaseous Chlorination And Selective Oxidation

    By T. Tamagawa, N. S. Fu, I. Iwasaki, M. Kobayashi

    A 3-stage fluidizing bed process of chlorination, selective oxidation and sulfur chloride conversion was tested for processing of a chalcopyrite concentrate. It was found that the use of excess oxygen

    Jan 1, 2000