Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
World's Longest Highway-Tunnel Tests 'Site Sensitized Emulsion'By Bjoern R. Petterson, Lars Haakon Siem
The world's longest highway-tunnel -- the Aurland Tunnel in western Norway -- is scheduled to be opened in the year 2000. A project to build a main highway between Oslo and Bergen with no ferry connec
Jan 1, 1996
-
The Development of a UN/DOT and ATF Compliant Special Effects Explosives Transportation Packaging/Storage Magazine SystemBy Tassilo Baur
In the motion picture/television industry and to some extent in the entertainment industries in general, there is often a need to use energetic materials to create special effects as part of a product
Jan 1, 2009
-
Implementation of a Remote Blasting Engineering Center in PeruBy Jorge Cárdenas, Luis Huaroc, Máximo Cari, Nestor Delgado
In Peru, after four years of pandemic, some mining companies have chosen to install integrated operating centers in central offices where through network technology and video surveillance it allows th
Jan 21, 2025
-
Journal: Safety Talk / Safety Shortcuts -- The Longest Distance Between Two PointsBy Steven D. Sandbrook
A man by the name of Louis Binstock once said, “Too often the shortcut, the line of least resistance, is responsible for evanescent and unsatisfactory success.”
Jan 1, 2015
-
Explosives Cost Reduction and Fragmentation Improvement at Inco's McCreedy West MineBy Steven Townend, Don Wadden
In today's global economy the need to stay competitive is essential for commercial survival and growth. To this end Inco is committed to continuous improvement in its operations. Various aspects of th
Jan 1, 1994
-
Tennessee's Largest Pipe InstallationBy James R. Houston, Wendel Clay Chaffin, John Loviza
During the spring and summer of 1993 the largest pipeline in Tennessee was installed as part of the upgrading of Nashville's sewage needs through the year 2035. This new 3.3 million dollar outfall pro
Jan 1, 1995
-
Implementation of the QA/QC program at the Carajás Iron Ore mine using Blastscout Probe TechnologyBy Kahmmelly Mathildes Pimenta Coelho, Felipe Dantas, Jaine Ribeiro de Souza, Augusto Ferraz, Carlos Roberto Campos Junior, Davi Bastos Martins de Oliveira
The Carajás Iron Mine, recognized as the largest iron ore province in the world, is notable for its continuous efforts to improve operational efficiency and safety. In response to these objectives, a
Jan 26, 2026
-
Worsey-Silva Equation for Modeling Fragmentation Caused by Row TimingBy J. Silva, T. Worsey
The Worsey-Silva equation determines the optimal row timing for the smallest fragmentation and allows fragmentation models to be adjusted due to row timing. The equation utilizes the concept of dynami
Jan 1, 2024
-
Rapid Advances in Electronic Initiating SystemsBy Andre Koekemoer, Gys Landman
At the moment, electronic initiation is migrating from a position of a specialist niche to that of a more widely applied technology. Ease of use and deployment rate are becoming aspects of greater con
Jan 1, 2011
-
Use of Electric Field Measurement and a Weather Data Service for Lightning Warning at the US Bureau of Mines' Pittsburgh Research CenterBy Lon D. Santis
This paper describes a lightning warning system (LWS) in operation at the U.S. Bureau of Mines' (USBM) Pittsburgh Research Center (PRC) from December, 1989 to April, 1991. An electric field mill measu
Jan 1, 1993
-
A Holistic Approach to the Drill and Blast ProcessBy Tom BoBo, Seth Gering, Jeff Loeb
Presenting a D&B feedback loop built on a well-designed blast, proven fragmentation analysis and blast monitoring solutions, underpinned by technology that not only increases profit from every blast,
Feb 1, 2020
-
Vibration Control In Open Cut Mine Through Pre-Loading Applying Wireless DetonatorsBy C. Feliciano, M. Cavalcante
A large iron ore open pit mine in Brazil operates with reduced blast sizes, due to the imminence of red alerts in the rainy season and the proximity of plant and dam structures that demand control of
Jan 1, 2024
-
Theory of Dynamic ConfinementBy Dr. Tristan Worsey, Dr. Jhon Silva-Castro
Confinement is an important aspect of blasting. Reducing and increasing confinement can determine whether a blast design performs properly. Over-confined shots usually have poor fragmentation, higher
Jan 21, 2025
-
Summer Internship Project at an Underground Gold MineBy Tristan Worsey
This work was performed during the summer of 2008 during the junior year of a BS in Mining Engineering. It was observed that the mine was having a problem with back break during the blasting of develo
Jan 1, 2010
-
Sustainable productivity in the exploitation processes of a mining site adjacent to communitiesBy J. Aravena, S. Gajardo, M. Ayala, P. Salinas
Both, Teck Carmen de Andacollo (Teck CDA) and Orica, work hard in the implementation of new technologies available in the explosives industry and drilling and blasting techniques, with the objective o
Jan 1, 2024
-
Polyurethane Foam and Sand Barriers Expand Explosive Storage CapacityBy Theodore C. Hile, Floyd P. Henry, Ken Gragg
"Conventional explosive-storage methods usually rely on combinations of earth and concrete barriers, along with sufficient distance between limited explosive loads, to avoid accidental conflagration.
Jan 1, 1999
-
Austin's New Delay Primper RelayBy Roger N. Prescott
This report presents a new process in delay blasting with the use of ANFO and slurry explosives.
Jan 1, 1977
-
Application of Underground Pre-Splitting in Butte, MTBy M. Gebhardt, J. Johnson, S. Rosenthal
The use of presplitting applications in an underground mine setting is a method of reducing overbreak in the rib and back when blasting occurs. Presplitting performed at the Underground Mine Education
Jan 1, 2024
-
S-Load CartridgeBy Marco Larghi, Jurg Knobel, Braden Schmidt
Remote Avalanche Control Systems (RACS) which uses solid explosives has been used in Europe since 1996 and North America since 1999. With large destructive avalanches in transportation corridors, vari
Feb 1, 2020
-
A Case Study - Interpretation of Fragmentation Analysis Results to Improve Blast Performance and Realize Significant Cost SavingsBy Charles Clark, Mark Mukhija, Jaime Klein
Comminution – the reduction in size of solid materials – is the most energy intensive component of the mining process (Bauer, 2015). It is estimated that comminution consumes around three percent of a
Jan 1, 2018