Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Experience Gained At The Application Of Atlas Piles In Poland
By Kazimierz Gwizdala
In recent years, in Poland the ATLAS piles have been successfully applied for some constructions near Gdansk. The piles have been used as foundations for housing and another areas of civil engineering
Jan 1, 2006
-
Charles Grimes Bridge Foundations, Melbourne, Australia - Synopsis
By Charles Pol Vuillier
Piling work for modification to the Charles Grimes Bridge in Melbourne, Australia required piles to be installed through 15 to 20 m thickness of very soft to soft silty clay overlying 10 m of stiff cl
Jan 1, 2000
-
List Of Delegates
AUSTRALIA CHAPMAN Gary JOHN WAGSTAFF CONTSRUCTIONS PTY. LTD. 1 Ashgrove Crescent 4060 ASHGROVE BRISBANE HILLAR Jaaes Director J.A. HILLAR & ASSOCIATES 99 Woolwich Road WOOLWICH,
Jan 1, 1994
-
The Spadina Pier Cofferdam - Design, Installation & Performance
By Jan A. Nilsen
This paper describes a key element in the construction of a major project undertaken by Harbourfront Corporation in its efforts to rejuvenate the central Toronto waterfront. The Spadina Pier forms one
Jan 1, 1987
-
Micropiles in an Urban Setting – TBTA Verrazano Narrows Bridge HOV/BUS Ramps, Brooklyn, NY and Nysdot Kosciuszko Bridge Replacement, Brooklyn, NY
By M. D. Riegel, Brian T. Felber
"Construction of foundation elements in an urban environment is often complicated by multiple constraints such as existing foundations, utility conflicts, maintenance and protection of traffic on high
Jan 1, 2016
-
Site Solutions For The Pisa Tower Remediation - 1 - Introduction
By Paolo Heiniger
The aim of this paper is to present the operative solutions devised and then adopted to implement the underexcavation (soil extraction) of the Tower of Pisa, by means of soil extraction. The inter
Jan 1, 2000
-
General Reports - Session 1 - General Report- Deep Excavations "He Who Pays The Piper Calls The Tune"
By Tim Chapman
This general report considers what promoters of deep basement projects want from their teams and whether they get it often enough. Most large projects are based on complex financial models where the f
Jan 1, 2006
-
The Use Of Stone Columns On Settlement And Liquefaction Susceptible Soils
By Ivan Jackson Madura
The new Paradisus Coco Beach Resort in Rio Grande (PR) is located on an old swamp area, which has been filled with relatively clean to silty sands. The swampy deposits consists of organic silts, peat
Jan 1, 2002
-
Challenge From Foundation Engineering To China ? Synopsis
By R. L. Xu
In this paper, the author would like to point out with figures that the building industry is one of the key industrial sectors of the national economy in China. And in the coming 15 years, the output
Jan 1, 2010
-
Pile Installation Overcomes Numerous Problems At Rocket Motor Component Manufacturing Facility - Introduction
By Jon H. Gould
This paper describes the following at the new Advanced Solid Rocket Motor (ASRM) nozzle manufacturing facility, which is being constructed inside an existing manufacturing facility: 1) generalized sub
Jan 1, 1992
-
Efficacy and Execution of Floating Lattice-Shaped Cement Treatment against Liquefaction
By Sachihiko Tokunaga, Hirofumi Taguchi, Kenji Maruyama, Hidenori Takahashi, Yoshiyuki Morikawa
"Abstract The present study proposed a new liquefaction countermeasure to improve sandy ground and conducted a trial execution. The new method is a floating-type and lattice-shaped cement treatment me
Jan 1, 2014
-
Case Study: The Use Of Post Tensioned Piles For Wind Turbine Foundations
By Amr Sallam, Ahmad Mohamed, Mohamed Alrowaimi
Renewable energy, in the form of wind and solar, has emerged as main source of energy in the modern society. The wind industry has substantially grown over the last two decades to become a key player
-
Case History - Augered Cast-In-Place Piling Installed Into Weathered Sandstone
By Edwin W. Meyer
The augered cast-in-place piling technique was used to install deep foundations 20 feet into weathered sandstone. The project involved the upgrading of the Air Quality Control System (AQCS) for a 560
Jan 1, 2006
-
Continuous Grouting In Embedding Of Sheet Piles
By Jouko L. Lehtonen
Sheet pile walls can be sealed watertightly using various methods. The objective of this paper is to introduce a new innovation comprising the use of continuous cement grouting during embedding. The m
Jan 1, 2006
-
Drilled Shaft Difficulties and a Micropile Solution
By Jeff Jackson, Paul Axtell, David Graham
The Montana Department of Transportation recently awarded a contract to construct a replacement bridge across the Clark Fork River in Heron, MT. Both abutments and both intermediate bridge bents were
Jan 1, 2018
-
Special Foundation Technique For The Intersection Of Two Canals Near Magdeburg, Germany - Summary:
By Wolfgang G. Brunner
The closing of the gap in the European waterway- net is one of the big and challenging traffic projects following the German reunification. The water canals in the North German plain connect the Rhine
Jan 1, 2000
-
Underpinning The Existing No. 1 Subway Line At The World Trade Center
By Richard Crockford
The World Trade Center (WTC) is located on the west side of Manhattan in New York City, approximately 0.5 miles north of Wall Street, and is owned and operated by the Port Authority of New York and Ne
Jan 1, 2008
-
Ground Water Control In The Urban Environment - Introduction
By Robert G. Lenz
Control of ground water for construction purposes is an everyday occurrence in the U.S. Thousands of pumps are in service at any given time. Most of these applications simply consist of pumping water
Jan 1, 1988
-
Application Of, And Experience With, An Electronically-Controlled Hydraulic Piling Hammer ? 1 ? Introduction
By D. Arentsen
Changing environmental laws, new operating requirements and the increasing accuracy with which the bearing capacity of driven piles can be calculated have all led to the development of hydraulic pilin
Jan 1, 1987
-
Deep Bored Piling in Soft Soil and High Lateral Loads
By W. Sondermann
"AbstractThe construction of a distribution centre of minerals for a global mining and resources cooperation demanded the control of deformations and displacement of the stack reclaimer facilities on
Jan 1, 2014