Innovative Use Of Ground ImprovementBy Mark Koelling
This paper presents a case history of a ground improvement program conducted in a soft soil environment and seismically active region in the northwest corner of Washington State near the Canadian bord
Jan 1, 2010
-
Diaphragm Walls for Infrastructure Projects how to Deal with Complex Demands?By Franz-Werner Gerressen, Manfred Schoepf
"Diaphragm walls are known as underground structural elements commonly used as retention systems for excavation pits and shafts and permanent foundation walls or elements. It can be anticipated that,
Jan 1, 2015
-
Physical Modeling and Development of Design Criteria for Maintainable Drains for Earth Retention SystemsBy J. Erik Loehr, Andrew Z. Boeckmann
"Poor drainage is a common cause of poor performance of earth retention systems, resulting in burdensome serviceability problems that can progress to outright failure of the retention system if not ad
Jan 1, 2016
-
An Alternative Pile TechnologyBy Rimas Veitas, James Panton, Erich Steinlechner
"Ductile Iron Piles (DIPs) are a proven, viable alternative to conventional piles, and for the past five years have been successfully used throughout New England. The installation process of DIPs lend
Jan 1, 2017
-
Route 9A Pedestrian Tunnel at the World Trade CenterBy Raymond E. Sandiford
"The redevelopment of the World Trade Center (WTC) provided an opportunity for the Port Authority of NY and NJ to complete a long sought underground connection between all of Lower Manhattan’s transit
Jan 1, 2012
-
Stabilizing A 100 Ft Rock Slope With Limited Access And Tight Construction Tolerances Using Observational Method And Real-time 3d ModelingBy Travis A. Shoemaker, Mitchell S. Youmans, Nancy T. Chin, Michael S. Senior
A geologic assessment and stability analysis of the right abutment of Boundary Hydroelectric Dam in Pend Oreille County, Washington was completed in May 2017. The stability analyses identified a poten
-
Session 19 "Compensation Grouting"By Douglas Heenan
The fracture orientations were inferred based on theory and previous experience. The fracture pattern was not monitored during the project. Grout volume was recorded at each sleeve port and real time
Feb 10, 2003
-
Replacement Bored Piles for the Houphouet-Boigny Bridge, Cote D'ivoireBy Adrian Mercer, Ashkan Ameri
Due to general degradation, increased traffic levels, and historical ground movement, this road and rail bridge which provides an essential link between the interior of the country and the Port of Abi
Sep 8, 2021
-
Cut-Off-Wall Welzow in the Lausitz, Germany, a 400 Feet (120 M) Deep Hydraulic Barrier between an Existing Lake Region and an Open Pit Coal MineBy Stephan Fisch, Franz-Werner Gerressen
"The use of cut-off-walls (COW) for the open pit coal mines has been used for decades. They have been used to reduce the negative hydraulic impact to the surrounding area caused by the open pit mining
Jan 1, 2017
-
The Miniaturization Of Diaphragm Wall Technique – The Cube SystemBy Leonhard Weixler, Alexander Blatt, Franz-Werner Gerressen
Diaphragm wall technique is usually used to construct structural elements in the ground, commonly used for retention systems, permanent foundation elements or deep ground-water barriers, named Cut-Off
Oct 1, 2022
-
Experiences And New Developments In Offshore FoundationBy Franz-Werner Gerressen
As alternative energy industries pick up speed internationally, and as government regulation and restriction limit the use of impact hammers due to environmental limitation from construction induced n
-
D-Wall Extreme – Contrast Between Going Deep And Getting SmallBy Alexander Blatt, Franz-Werner Gerressen
Diaphragm wall technique is usually used to construct structural elements in the ground, commonly used for retention systems, permanent foundation elements or deep groundwater barriers, named Cut-Off-
May 1, 2022
-
TBM Recovery Shaft Construction - SR-99 TunnelBy Lance Rasband, Richard Hanke, John Starcevich
"The 17.4 meter (57 ft) diameter tunnel boring machine (TBM), the world’s largest at the time of her launch in 2012, locally referred to as “Bertha,” is stuck. Incapacitated due to mechanical failure
Jan 1, 2016
-
DFI Mission Executed Through Growth of Micropile TechnologyBy Jim Bruce, Peggy Hagerty Duffy, Mary Ellen Large, Allen Cadden
"Over the past 40 years, Deep Foundations Institute (DFI) has executed its mission “to bring together multi-disciplined individuals and organizations to find common ground and create a shared vision a
Jan 1, 2017
-
Impact Of Clay On Early Jet Grouting StrengthBy Debra F. Laefer
Jet grouting is a ground improvement technique that has become widely adopted over the past three decades, yet relatively little data has been published about performance characteristics of mixes unde
Jan 1, 2009
-
Stone Columns Through Construction Demolition Debris FillBy Lok M. Sharma
Development of brownfields is of great interest in these days. Such fields are not easily adaptable for foundations of structures. The uncertainties in ground behavior present challenges of unpredic
Jan 1, 2009
-
2D And 3D Ansys Modeling For Deep Excavation And Evaluation Of Soil-Structure InteractionBy Yahia M. Al-Smadi
Effect of lateral loading against existing sheet pile wall and distribution of gravity loading due to various number of construction loading scenarios were studied. The objective of this effort was t
Jan 1, 2010
-
Augered Cast-In-Place And Continuous Flight Auger Pile Foundation Systems For US Highway Projects - Why ACIPICFA Pile Foundations?By Silas C. Nichols
FHWA Interest is due to: ? An increase in successful projects in the U.S. private sector and in other countries ? Cost effective and more efficient in many circumstances ? Agency Prioritie
Jan 1, 2005
-
Applying Reasonable Quality Control and Verification to Soil MixingBy David Miller
"The biggest concern about using soil mixing is the inability to observe physically the final product, which has led to a lack of confidence about what is in the ground. After all, you can’t see it an
Jan 1, 2017
-
The Underwater Cut-Off At The Walter F. George DamBy Gianfranco Di Cicco
Seepage problems were recorded for more then 40 years at the Walter F. George lock and dam. In 2001 the Mobile district of The U.S. Army Corps of Engineers turned to the installation of a 200 feet dee
Jan 1, 2013