Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Relationship of Gold to Syenitic Intrusive Rocks in Kirkland Lake

    By F. R. Ploeger, J. H. Crocket

    "IntroductionRocks in the Kirkland Lake district form part of the Timiskaming Group, a south-facing homoclinal sequence of wackes, conglomerate, trachytic flows and pyroclastic rocks and syenitic intr

    Jan 1, 1982

  • CIM
    Monarch and Kicking Horse Mines (e1256bf9-531c-4f9f-a430-d293cf06c4ff)

    By W. L. Brown

    "The properties of Base Metal Mining Corporation are in Yoho Park about 2 1/2 miles northeast of Field; British Columbia; on the main line of the Canadian Pacific railway. There are actually two mines

    Jan 1, 1954

  • CIM
    Mineral Provinces and Tectonic Regimes: Ancient Platforms, Mobile Belts and Zones of Tectonic-Magmatic Activation in Russia and South Africa (8d4312ab-0ddf-44d0-a830-abb3ce72e6c7)

    By R. P. Viljoen, A. L. Sokolov

    "The distribution of mineralized provinces is analyzed on the basis of their genetic link with specific blocks of the earth's crust including ancient platforms, mobile belts and zones of tectonic

    Jan 1, 1994

  • CIM
    Manning Best Practice in Australia

    By Stephen Williams

    This paper examines manning best practice in the Australian mining industry. In particular, the paper considers a range of mining operations and their manning levels as measured by operational benchma

    May 1, 2009

  • CIM
    Hydrolysis for Iron Control and Acid Regeneration in Chloride Hydrometallurgy Circuits

    By M. J. Dry, G. B. Harris

    "This paper presents basic chemistry and operating conditions for the hydrolysis of ferric chloride into solid hematite and gaseous hydrogen chloride, and shows how this unit operation can be applied

    Jan 1, 2016

  • CIM
    Computer Analysis of Viscosity Effects on Selection for Breakage and Breakage Distribution Parameters in the Wet Grinding of Ores (4c8c0868-8a1c-4e4d-b5e6-47bee15df76c)

    By Willie Manfrey, Richard Klimpel

    This paper describes the effects of slurry viscosity on the selection-for-breakage and breakage distribution parameters in the wet grinding of cres. A series of experimental tests were run on laborato

    Jan 1, 1977

  • CIM
    Carmen De Andacollo – Start-up of Teck’s New Copper Concentrator

    By L. Torres, C. S. R. Rondestvedt, M. Bustos

    In February 2010, Teck’s newest Concentrator at Mina Carmen de Andacollo (CDA), Andacollo, Chile was commissioned. The Concentrator is a single line configuration, comprising of one 36 ft diameter x 2

    Jan 1, 2012

  • CIM
    Effect of Lubricant in Hydroforming of Ni-Based Super Alloy Tubes

    By M. Jahazi, J. Gholipour

    Design and manufacturing of parts using hydroforming process require knowledge about material behaviour and tribological effects during hydroforming. Lubrication is one of the key issues in successful

    Jan 1, 2006

  • CIM
    Development of a Heap Biooxidation Process for the Lahoca Refractory Gold Project

    By John Keay, Douglas R. Shaw, Gregory J. Olson

    "The results are presented herein of on-going laboratory investigations of heap bacterial oxidation as a pretreatment method for the recovery of sulfide-encapsulated gold from ore samples of the Rhode

    Jan 1, 1998

  • CIM
    Pulp-Lifter Flow Modeling Study in a Pilot Scale Mill and Application to Plant Scale Mills (a5b0bae6-30bd-456f-96a6-c4fcba893c43)

    By Simon Pelletier, Jose Delgadillo, Dave Page, Pramod Kumar, Raj Rajamani, Dilek Alkac, Martin Fillion

    "In general, many past works examine mill load, mill power, shell lifter design etc with a view to improving the mill capacity. On the contrary, only a handful of papers have addressed the transport o

    Jan 1, 2012

  • CIM
    Technological Aspects of Recovery of Precious Metals from Carbonaceous Ores

    By Tatyana Alexandrova

    The problem of processing refractory (rebellious) gold ores is important for all the countries involved in recovering precious metals from ores. Technological aspects of processing precious metal ores

    Jan 1, 2016

  • CIM
    Some Problems of Longwall Mining in Cape Breton

    By David Morrison

    Our present longwall problems in Cape Breton can be grouped under five main classifications. These are: (1) Roof control on the face and on the main roadways leading thereto. (2) Transportation of

    Jan 1, 1947

  • CIM
    Natashquan's Mineral Sands Beneficiation

    By John Porritt, Alain Dorval

    "TioMin Resources Inc. is evaluating the feasibility of exploiting the heavy mineral sands deposit at Natashquan on the north shore of the Gulf of St-Lawrence, Quebec. TioMin holds the exploration rig

    Jan 1, 1995

  • CIM
    A Kinetic Model of Anode Copper Reduction and Comparison with Industrial Data

    By Paul E. Mather, Matthew J. M. Krane

    Anode or fire refining is the final pyrometallurgical step in the production of copper anode. Part of this process purifies liquid copper by reducing its dissolved oxygen with a natural gas-steam mixt

    Jan 1, 2019

  • CIM
    Environmental Upgrade at the Freeport McMoran Miami Smelter

    By Avi Nanda, Robert Brandt, Alex Piatkiewicz, David M. Jones

    In 2010 the United States Environmental Protection Agency (UESPA) revised the National Ambient Air Quality Standards (NAAQS) by lowering the permissible value to a 1-hour average SO2 concentration of

    Jan 1, 2019

  • CIM
    Complex Processing of Phosphor Production Slag with Rare Earth Metals Recovery and Deriving of Silicon-Containing Solution

    By Ata Akcil, Z. B. Karshigina, Ye. G. Bochevskaya, Z. S. Abisheva

    "Phosphorus slag is the most heavy-tonnage waste of yellow phosphorus production, which is stored in the dump fields for many years creating ecological problems in the regions. Despite of the actions

    Jan 1, 2016

  • CIM
    A New System of Hoist Brake Control

    By B. E. Shaw

    This paper describes the use of the Free Piston Valve, and a simple hoist brake control system, which has been developed over the last two years, greatly improving the performance of low-pressure brak

    Jan 1, 1966

  • CIM
    Modeling the Progressive Failure in Rock Slopes Based on the Fracture Mechanics Approach Using the Numerical Manifold Method

    By Z. Wu, L. N. Y. Wong

    The present study develops the numerical manifold method (NMM) as a tool to investigate the progressive failure in rock slopes. The entire processes of the progressive slide surface development relate

    Jan 1, 2015

  • CIM
    Modelling Effectiveness of Covers for Tailings Closure ? Case Studies

    By Lindsay A. Robertson

    The long term management of acid generating tailings at mine closure is a common issue, however, management of ARD is significantly impacted by local conditions, including climate. Acid generating tai

    May 1, 2011

  • CIM
    Heuristic Optimization of Scheduling Scenarios for Achieving Strategic Mine Planning Targets

    An optimization process is described that can be systematically applied by mine planners to produce life-of-mine schedules aligned with their strategic targets, while maximizing the net present value

    Aug 1, 2013