Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Connecting Mines and Communities: An Overview of the Elk Valley in S.E. British Columbia

    Delivering Our Products On any given day in North America, 80 kilometers of rail cars are engaged in moving our product. Global Customer Base Our business accounts for more than 30% of all bulk

    May 1, 2006

  • CIM
    Coal Preparation - A two-part paper on problems encountered in a modern coal preparation plant and how they were dealt with - Part 1 Low-gravity separation

    By B. W. Clyburn

    "Coals from the Corporation's Lingan and No. 26 mines are classified as high-volatile A bituminous, with a very low inherent ash and containing a/l essential properties to provide metallurgical c

    Jan 1, 1980

  • CIM
    Practical rock engineering stope design case histories from Noranda Minerals Inc.

    By D. Milne, P. Germain, G. Sauriol

    "The practical determination of optimum stope geometry has, until recently, been an art relying primarily on experience at a given operation. Due to the complex and variable nature of rock masses in s

    Jan 1, 1989

  • CIM
    The Sydney Coalfield

    By F. W. Gray

    A GEOLOGICAL study seeking to determine, for economic purposes, the value of the Sydney coalfield as a source of coal supply. Limitations of the coalfield come under two main heads: (a) Areal exte

    Jan 1, 1941

  • CIM
    Iron Behavior in the Hydrocoppertm Process

    By L. Haavanlammi

    Iron is a significant component of all copper concentrates leached in the HydroCopperTM process. The metals in the concentrate are leached in a chloride solution by oxidation with cupric ions. Copper

    Jan 1, 2006

  • CIM
    Control of sodium-rich brine inflows at Central Canada Potash - Part 1: .Rehabilitation, diamond drilling, grouting and backfilling

    By E. M. De Souza, A. M. Coode

    "When Canadian potash was brought into production in the 1960s substantial research was carried out to develop the technology needed to cope with the unique conditions in Saskatchewan mines. The inten

    Jan 1, 1990

  • CIM
    Mining and information: Defining the need

    By Jonathan Peck, Jim Gray

    "While the mine developer looks for bigger and better orebodies in countries offering lower risks to development capital, the opera-tor of existing mines is looking for bigger and better ways to use h

    Jan 1, 1996

  • CIM
    Slurry Dispersion Angle at Choke Outlet in Pressure Letdown with Multi-phase Flows

    By J. Robison, H. Pieterse, C. C. Smith, M. Luque, S. Chipman

    Phase change during pressure let down releases significant amounts of energy that must be controlled to avoid undo wear and tear on equipment. Hydrometallurgical slurries require flow control equipmen

    Jan 1, 2004

  • CIM
    Extraction, Separation and Recovery of Thorium from Korean Monozite Ore Leach Liquors

    By Ho-Sung Yoon, Jyothi Rajesh Kumar, Jin-Young Lee

    "Global population is a key factor in future energy requirements, especially considering the important elements of global energy resources, electricity production, the accessibility/non-accessibility

    Jan 1, 2016

  • CIM
    The use of Engineered Wetland Technology for Long Term Minewater Treatment at Closed Minestreatment Mines

    CONSTRUCTED WETLANDS (CWs) ?Human-Constructed ?Built Specifically to Remove Contaminants ?Can Treat a Wide Variety of Wastewaters Including Stormwater(SW) ?Three Major Kinds ?Pond Wetlands ?Fr

    May 1, 2009

  • CIM
    Demonstration heap leaching

    By G. W. McDonald

    "The mineralogical studies done on Hope Brook ore samples indicated that a heap leach gold recovery process may be possible. In the metallurgicalprogram that followed, column tests confirmed this inte

    Jan 1, 1989

  • CIM
    Financial Aspects of Mine Operation

    By A. H. C. A. Zimmerman

    WE have just heard what must be regarded as a thoughtful, constructive and somewhat painful analysis of the financial function of our industry. While thinking about this, it is interesting to reflect

    Jan 1, 1962

  • CIM
    New industrial mineral opportunities in southeastern Ontario

    By William F. Caley, A. MacKinnon, P. W. Kingston

    "The purpose of this paper is to identify a number of currently available opportunities for exploration and/or mine development in the industrial minerals field in southeastern Ontario. The paper is n

    Jan 1, 1990

  • CIM
    Planning and construction of the Tumbler Ridge Branch Line

    By V. W. Shtenko, B. J. Ennis, P. H. Bridge

    "The northeastern region of British Columbia contains large quantities of high-quality metallurgical coal. To market the coal, it was necessary to provide the required infrastructure which included ra

    Jan 1, 1983

  • CIM
    Roasting Kinetics of Molybdenite Concentrates

    Roasting of molybdenite concentrate is an important stage in the production of commercial molybdenum trioxide. The oxidation kinetic and mechanism of molybdenum sulfide concentrates from two plants we

    Jan 1, 2007

  • CIM
    Cost-Saving Strategies in Mine Ventilation

    By Euler De Souza

    "Underground operation ventilation energy requirements constitute a significant portion of mine energy consumption (40–50%) and total energy costs (25–40%). In general, mine ventilation systems are en

    Jan 1, 2018

  • CIM
    Central Preparation Plant of the Acadia Coal Company, Limited

    By R. P. Nicholson

    On September 3rd, 1947, the Acadia Coal Company put into operation a central coal preparation plant. This plant was designed to process all coals mined by this Company in the Pictou County coal field.

    Jan 1, 1948

  • CIM
    Management of Environmental Emissions at Boliden Harjavalta Oy’s Smelter

    By H. -L. Heikkilä, E. Peuraniemi

    "Boliden Harjavalta Oy has a long tradition in the Finnish metal industry starting from the 1930's. The Smelter consists of copper and nickel flash smelting lines. Off-gases are captured in the acid p

    Jan 1, 2012

  • CIM
    Study on Acoustic Wave Propagation in Fractured Rock Mass Under High in-Situ Stress of Model Test and Damage Constitutive Relation

    By Hang Zhao, Xinping Li, Pingan Wu, Yi Luo

    "The deep-buried rock surrounding the Jinping II Hydro-power Station was taken as the engineering background. Using model specimens of classified rock materials to simulate fractured rock mass under h

    Jan 1, 2015

  • CIM
    FRP Challenges and Applications in Metals Processing

    By Rafic Moubarac

    FRP (Fiberglass Reinforced Polyester) equipment has been used in different and several applications during metals processing and extraction, and the hydrometallurgical process. Case histories of such

    Jan 1, 2015