Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Four Metre Diameter Raise Drilling at Olympic Dam Project S.A.

    In the first half of 1987 two four metre diameter raise bore holes were drilled at the Olympic Dam Project for ventilation purposes. The first hole, 476 m x 4.0 m diameter was completed in 96 days

    Jan 1, 1988

  • AUSIMM
    Some Thoughts Concerning Gold

    Various aspects concerning gold are mentioned below. These have no common theme but suggest points of interest any one of which, if warranted, could lead to development later and elsewhere. '

    Jan 1, 1982

  • AUSIMM
    In-Seam Seismics for Coal Exploration Developments and Case Studies

    By Leung L, Downey M

    This paper presents an overview of a technology package developed by BHP for locating discontinuities in coal seams using an in-seam seismic (ISS) exploration technique. The technology package inc

    Jan 1, 1987

  • AUSIMM
    Design and Ground Support Monitoring of the Brunswick Street Rail Tunnels, Brisbane

    By Baxter D. A

    This paper, one of two written about the Queensland Railways Brunswick Street tunnels presented at the VIII Australian Tunnelling Conference, 1993, describes the design and monitoring aspects of the r

    Jan 1, 1993

  • AUSIMM
    Mineralogical Domains in the Victorian Gold Province, Maldon, and Carlin-Style Potential

    By Gregory L. M, Phillips G. N

    Although it has long been recognised that there is a diversity of minerals associated with Victorian gold deposits, the degree to which this mineralogy is systematic or haphazard has remained uncer

    Jan 1, 1997

  • AUSIMM
    Development of Equipment Types at Renison Mine

    By Clarke RG

    Renison Mine was developed as the first all diesel mine in Australia. The foresight of the early planners in committing the Mine to Decline access has paid dividends in the past two decades with R

    Jan 1, 1982

  • AUSIMM
    Structure and Metamorphic Setting of Base Metal Mineralisation in the Kanmantoo Group, South Australia

    By Schiller J. C, Both R. A

    Base metal mineralisation occurs at several locations within the regionally metamorphosed Kanmantoo Group on the southeastern flank of the Mount Lofty Ranges between Kanmantoo and Strathalbyn, 50 km s

    Jan 1, 1988

  • AUSIMM
    Application of Mineral Processing in Waste Treatment and Scrap Recycling

    Proceeding from statistical data on the development of waste volume, an endeavour was made to characterise waste materials with regard to the applicability of treatments based on mineral processing.

    Jan 1, 1993

  • AUSIMM
    Blast Vibrations in Soil and on Large Resonant Structures

    In order to satisfy environmental and mine operational requirements it is becoming increasingly important to minimise ground blast vibrations at certain locations. These locations are often in soil

    Jan 1, 1995

  • AUSIMM
    Heterogeneity and IngamellsÆs Tests of Some Chilean Porphyry Ores

    By P Carrasco, E Me, M Campos, J Tapia

    Correct sampling practices are of vital importance to the mining industry; key decisions for the business are made on the basis of samples in all the value chain. Geology plays a relevant role in pre-

    Jan 1, 2005

  • AUSIMM
    Longhole Open Stoping in the ZC ""Crack"" Zone

    By Matthews SM, Gooding JE

    N Longhole Open Stope at The Zinc Corporation Mine was developed in an area with large and continuous tension cracks. These cracks resulted fran widespread block subsidence into previously mined areas

    Jan 1, 1985

  • AUSIMM
    Current Capabilities for Finite Element Analysis of Geomechanics and Structural Support Systems in Underground Mining

    By Ho D, Yang J

    The ready availability of powerful desktop workstations, which combine 3D real-time graphics and processing speed better than that of supercomputers of a few years ago, now allows the cost-effectiv

    Jan 1, 1995

  • AUSIMM
    Nickel and Cobalt Losses During Dissolution and Oxidation of Iron Powder in Ammoniacal Medium Using Oxygen over Pressures

    By Rath M. C, Das R. P

    Studies were carried out on dissolution and oxidation of iron powder in ammonia-ammonium carbonate solution using oxygen over pressures. Cobalt and nickel losses during iron oxidation under differen

    Jan 1, 1992

  • AUSIMM
    Support Performance Prediction for Hydraulic Fills

    By Hill J. R M, McDonald M. M

    A prediction technique for support perfor- mance of hydraulic backfill in narrow stopes is applied to two stopes separated vertically by a sill pillar. Predicted stope wall closures and fill pressu

    Jan 1, 1973

  • AUSIMM
    Quality Control at Hamersley Iron

    By Hammond J. R, Ward T. A

    The Tom Price orebody, in the Hamersley Ranges of North West of Western Australia, is mined by Hamersley Iron Pty. Limited. The orebody is a folded sequence of hematite and shale bands capped with

    Jan 1, 1973

  • AUSIMM
    Opportunities for Partnerships in Contract Mining

    The underground mining of a narrow vein hard rock orebody is a capital and labour intensive method of extraction. Due to the nature of underground mining it is difficult for higher level managers to p

    Jan 1, 2006

  • AUSIMM
    Enigmatic Kinematics Resolved in the Taurus Shear Zone,Golden Pig Gold Mine, Southern Cross, Western Australia ù Resource Implications

    By S Robson, T G. Blenkinsop, S C. Dominy

    Golden Pig mine is in the central part of the Southern Cross greenstone belt within the Archaean Yilgarn craton. The mine has produced approximately 2.5 Mt of ore at 5.7 g/t Au to yield approximately

    Jan 1, 2003

  • AUSIMM
    Determination of the Controlling Mechanism of Iron Precipitation as Sodium Jarosite from Aqueous Solutions

    By Amanatidis A

    In this paper, the kinetics of iron precipitation as sodium jarosite from aqueous solution is investigated. The determination of the reaction mechanism is attempted based on the experimental data of i

    Jan 1, 1993

  • AUSIMM
    The Granites Gold Project-A Mineral Project within Aboriginal Land

    North Flinders Mines Limited (N.F.M.) is an Australian-owned mineral exploration and mining company based in South Australia. In the 1970's it researched the prospectiveness of the Tanami (ce

    Jan 1, 1984

  • AUSIMM
    The Break Up of Recoverable Reserves at High Cut-offs

    By Armstrong M, Kleingeld W. J

    Current low prices for many metals mean that deposits have to be mined at high cut-offs (relative to their mean grade), which means that only a small percentage of mining blocks are above cut-off.

    Jan 1, 1995