Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Optimisation of Spray Collers for Cooling Deep Coal Mines

    By Hagen G, Uhlig H

    In the Federal Republic of Germany the thermal environment in underground coal mines has deteriorated progressively over the past years. The number and capacity of refrigeration plants have increa

    Jan 1, 1988

  • AUSIMM
    The Upgrade of the Ore Haulage Facilities at Z.C. Mines, Broken Hill

    A Feasibility Study to determine the future of ZC Mines was completed in mid 1987. Early in this study, which lasted two years, it was identified that significant reductions in treatment costs would r

    Jan 1, 1988

  • AUSIMM
    Deformation of Retreat Gatroad in Interpanel-Pillar System

    By Ichinose M, Tsuru T, Gotoh K

    Since 1980, the Department of Mining Engineering at Kyushu University, in co-operation with the Ikeshima Colliery, Matsushima Coal Mining Co. Ltd., has been conducting a research project into longw

    Jan 1, 1992

  • AUSIMM
    Management of Ranger Uranium Mine Waters, Kakadu Region, Northern Territory, Australia

    By Bastias J

    The Ranger uranium mine has operated in the Kakadu region of the Northern Territory since 1979. The mine's water management system was designed to cater for the wet-dry monsoonal climate and to

    Jan 1, 1988

  • AUSIMM
    The Hydrogeological Problems of Groundwater Protection in Mining Regions

    The investigations of the Leningrad ruining lilstitute on this problem are carrying out in the following main directions: 1) The analysis and study of contaminants migration at particular sites of m

    Jan 1, 1988

  • AUSIMM
    Longwall Face Outputs Present æState of the ArtÆ -- Alternative Future Trends

    By Duncan GR

    Having passed through a number of previous phases the best longwall results in Australia have shown a significant increase in the last two years. The results expected from a longwall face can be es

    Jan 1, 1988

  • AUSIMM
    An Introduction to the Planning of Development of the Brown Coal Open Cuts of the State Electricity Commission of Victoria

    The brown coal resources of the Latrobe Valley, which include over thirty thousand million tons of coal suitable for open cutting, provide the main source of fuel for the power generation for the Stat

    Jan 1, 1960

  • AUSIMM
    Disclosure - Resource/Reserve Statements - Moving into the Nineties

    The equity market is now very much within a global village environ- ment, with various exchanges acting as agencies for the big casino. In this predicament, mining companies, who provide the most ext

    Jan 1, 1988

  • AUSIMM
    Broken Hill At The Cross Roads

    A review is given of the development of the author's ideas on the relationship of ore occurrence to regional dislocations in the earth's crust, presently identifiable in particular areas

    Jan 1, 1983

  • AUSIMM
    Studies on Differential Flotation Characteristics of Arsenopyrite/Pyrite Concentrate

    By Liu Q, Siefken T. C, Misra V. N

    Investigation of the differential flotation characteristics between arsenopyrite and pyrite in a ore concentrate have been carried out on a laboratory Leeds flotation cell. Experimental results indi

    Jan 1, 1992

  • AUSIMM
    Assessing the effectiveness of erosion predictions from a landform evolution model with field observations from a rehabilitated landform

    By G R. Hancock, M J. Saynor, J B. C Lowry, T J. Coulthard

    Landform evolution models (LEMs) can assess the effectiveness of landform designs applied to a rehabilitated landform by predicting where erosion may occur. Here, we compare erosion predictions produc

    Aug 2, 2023

  • AUSIMM
    Studies on Active Gold Mineralisation in the Waiotapu Geothermal System, New Zealand

    Gold is actively precipitating at grades up to 80 g/tonne at and near the surface of the Waiotapu geothermal system, located in the Taupo Volcanic Zone of New Zealand. Many characteristics of this act

    Jan 1, 1984

  • AUSIMM
    Obtaining a Representative RCSample ù The Cone Splitter Versus the Tiered Riffle Splitter

    By P Church

    What is the best method of splitting a sample from a reverse circulation drill rig? How important is it to obtain a correctly split sample? What is the impact of an incorrectly split sample? These are

    Jan 1, 2003

  • AUSIMM
    Effects of Subsidence on Steeptopography and Cliff Lines

    By Carter J. P

    A two year study into the effects of coal mining induced subsidence on cliff lines was undertaken by the Department of Mineral Resources with the support of a grant under the National Energy Resear

    Jan 1, 1992

  • AUSIMM
    Segregation Roasting of Nickel Oxide Ore

    By Svensson J

    The nickel segregation process is one of the methods for treating nickel oxide ores. In this process nickel oxide ores are heated together with a small amount of the carbonaceous reductants and hal

    Jan 1, 1980

  • AUSIMM
    Selective Mining Techniques - Telfer

    The Ok Tedi Project has been planned as a selective mining operation since the Feasibility Study. The nature of the orebody, and the need to 'stage' the infrastructure buildup meant that ini

    Jan 1, 1986

  • AUSIMM
    Will Firedamp Emission Stop Progress in Longwall Production?

    When lying over 200-250m depth, many seams and surrounding strata are gassy enough to create mining difficulties , particularly in highly productive longwalls as well as in their development headin

    Jan 1, 1988

  • AUSIMM
    Learning from Nuclear Waste Repository-Design: The Ground-Control Plan

    With mining development on hold and other underground works in a slowdown, the develop- ment of nuclear waste repositories takes center stage on the American rock engineering scene. Three repositor

    Jan 1, 1987

  • AUSIMM
    Mechanics of Rock Drilling, Cutting and Future Developments

    By Aziz NI, Guo H

    Most of the existing models of the mechanisms of drilling and cutting processes are oversimplified in both stress state and failure criterion. On the other hand numerical modelling techniques are a

    Jan 1, 1988

  • AUSIMM
    Integrated Whaleback Planning and Scheduling System

    Various software packages are discussed. These are components of an Integrated Planning and Scheduling System developed by MVM with the aim of providing up-to-date information for the Whaleback o

    Jan 1, 1986