Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Draw Control Optimisation along the Production Drift in Sublevel Caving MinesBy A Gustafson, G Shekhar, P Boeg-Jensen
The amount of material extracted from each blasted ring in sublevel caving mines is vital when deciding the overall mine production target. The orientation of the production drifts is normally perpend
May 9, 2016
-
Optimising Mobile Equipment Resources in Massive MiningMobile mining equipment presents only a small portion (ten per cent mining project costs but the selected technology will determine to a large extent the mining performance and mine profitability. The
Jan 1, 2000
-
Sustainable Water Use in Minerals and Metal Production (d0f30340-98d8-41af-9a56-e3b26cd94fdc)By R R. Lovel
In this paper, life cycle assessment methodology has been used to assess the variations in water use associated with different metal production and processing routes and provide insights into the valu
Jan 1, 2006
-
Integrated Landforms for the Storage of Tailings and Waste Rock at Magnetite Mines in Western AustraliaBy D R. Anstey
The mining of magnetite iron ore in Western Australia will generate large volumes of waste rock and tailings over many decades. The need to dispose of these materials will result in massive waste land
Jan 1, 2009
-
The Grande Côte Mineral Sands ProjectBy M C. Ackland
The Grande Côte Mineral Sands Deposit (GCMSP) is located on a coastal mobile dune system in Senegal on the west coast of Africa. Senegal is a stable, democratic republic, having gained its independenc
Oct 5, 2011
-
Three-Dimensional Reconstruction of the Fault History at the Century Zinc Deposit, has Enabled Assessment of Pre-Syn to Post Mineralisation Faulting on the Current Position of Ore and Grade DistributionBy L H. Chapman, I J. Kelso, N H. S Oliver
Utilisation of modern 3D visualisation tools, can improve our ability to correlate between different datasets, and thus to produce more accurate geological models. Here, we present an application of s
Jan 1, 2003
-
Computer Simulations to Enable Continuous Blending to Two Plants at Sishen Mine From the Medium-Term Point of ViewSishen uses a state-of-the-art tracking system to track material from its position in blast blocks through various stockpiles and crushers. Qualities are blended directly to the crusher as opposed to
Jan 1, 2005
-
Pongkor Gold Mine (Indonesia) ù Changing From Traditional Handheld Cut and Fill to Mechanical Cut and FillThe Pongkor Gold Mine employs 678 staff. The mine is owned by the Indonesian state company PT Antam Tbk and is located 100 kilometres south west of Jakarta, in Java, Indonesia. Mine and infrastructure
Jan 1, 2002
-
Advances in Flotation Process Control at Porgera Gold Mine Using JK FrothCam Imaging TechnologyThe Porgera gold mine has made significant progress with the successful installation of a JK FrothCam image analysis system. The system is used to measure and control froth velocity on the scavenger c
Jan 1, 2003
-
A New Method for Sampling from High Capacity ScreensBy B W. Atkinson
Full-stream mechanised sampling apparatus, that collect a full cross-sectional increment from the complete screen discharge, will always be the preferred option for sampling screen overflows. However,
Aug 21, 2012
-
The Toowong process for treatment of complex oresBy L MacDonald, D Molver, D Pepper
Increasing contamination/impurity levels (including arsenic, antimony, mercury etc.) of concentrates is an issue of global commercial and health / environmental significance. With increasing environme
Nov 21, 2018
-
Review of Ground Support Systems at King Island ScheeliteBy Nag D. K
King Island Scheelite is a wholely owned subsidiary of Peko-Wallsend Ltd. The company works two underground mines near the southern end of King Island at the western approach to lass Strait, 240 k
Jan 1, 1981
-
Design, Development and Operation of a Hardrock RoadheaderBy Bromley JC
Eimco Great Britain, a division of Baker Mining Equipment Company, was contracted to develop a hardrock tunnelling machine in conjunction with British Coal. The objective: a machine to cut rock up
Jan 1, 1987
-
Mining Reconciliation in Long Hole Open Stopes at George Fisher MineBy J J. Grobler
The George Fisher Underground Mine at Mount Isa applies the long hole open stoping methodology. During the reconciliation process of transverse stopes in the George Fisher North mine it was identified
Mar 21, 2011
-
Volumetric Reserves And Probability EstimatesBy Stewart W. J
The volumetric method of estimating hydrocarbon resources and recoverable reserves is and probably will remain a dominant method in petroleum engineering. The method is technically very simple, bu
Jan 1, 1979
-
A Proposed Standard for the Objective Measurement of Muck Pile ProfilesBlast Engineers frequently use the terminology "the blast showed good heave", or even "the heave was better this time". It is reasonably obvious that "good" and "better" are not the best terms to us
Jan 1, 1990
-
The Amanda Bel Goldfield: A Significant New Gold ProvinceBy Plumridge C. L, Lynch J. E, Forresty R. J
The Amanda Bel Goldfield (new name) is an area of approximately 1000 sq. km centred 65km WSW of Ingham and 150km due east of Kidston (Camel Creek homestead to Ryeburn homestead area). Gold mineral
Jan 1, 1989
-
Implementation of Split to Estimate the Size Distribution of Rocks in Mining and Milling OperationsBy Kanchibolta S. S, Brunton I, Tapia-Vergara F
The Split digital image processing system has been implemented in three Australian mines for analysing the size distribution of rocks from the images taken from muckpiles, conveyor belts and tipping
Jan 1, 1998
-
The Control of Hydro Power Distribution System in Deep MinesBy Wymer DG
The concept of hydro power in deep mines is based on the exploitation of the hydrostatic head that can be gained as refrigerated cooling water descends in shaft pipe columns from the surface, to provi
Jan 1, 1985
-
An Approach to the Development of Technological Flowsheets for Raw Material Beneficiation Using New Flotation Reagent SystemsBy Dendyuk TV
The possible use of combined (flotation/magnetic separation and magnetic separation/flotation) technologies involving the new flotation reagent systems for upgrading the iron ore concentrates, low g
Jan 1, 1993