Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Bed Load Losses from Experimental Plots on a Rehabilitated Uranium Mine in Northern AustraliaBy W D. Erskine, M J. Saynor
Ranger Uranium Mine, surrounded by Kakadu National Park is located in the Alligator Rivers Region (ARR) in the wet-dry monsoonal tropics, 250 km east of Darwin, Northern Territory. A trial landform (T
Jun 28, 2016
-
Accurate Underground Wireless Ranging and TrackingBy M Hedley
Tracking plant and personnel in underground environments provides multiple potential benefits for a mine including increasing safety, better monitoring of production, traffic control, and in the futur
Mar 21, 2011
-
The Effect of Seasonal Variations on the Performance of Mineral Processing Plants – A Case Study of Deposit-10/11A Mine of NMDC LtdBy S Das
Deposit-10/11A is situated in the iron rich Bailadila region of India comprising haematite ore of average grade 65 per cent Fe. The deposit production line was commissioned in the year 2002 having a c
Jul 11, 2011
-
Air-core imaging in a hydrocyclone using non-invasive ERT Technique – effect of reconstruction algorithmsBy N Mangadoddy, P Jampana, S Diddi
The study of air-core dynamics in hydrocyclone operation is essential for predicting separation efficiency in mineral processing. Electrical resistance tomography (ERT) allows non-invasive measurement
Aug 24, 2022
-
Novel Online Analysis Applications in the Iron Ore IndustryThermo Fisher Scientific is the worldÆs leading supplier of analysers for laboratories and process industries. The companyÆs X-ray fluorescence (XRF)-based slurry immersion probes were originally deve
Jan 1, 2007
-
A Dynamic Ore Reserve Calculation and Accounting System for a Stratiform OrebodyBy Jaczkowski B
The lower orebody (LOB) at Chingola Divi- sion of Nchanga Consolidated Copper Mines Limited (NCCM) accounts for approximately 30 per cent of the total copper production for the company. The uniform
Jan 1, 1977
-
A preliminary benchmarking numerical modelling exercise for tailings‐flow runout analysisBy S Liu, N M. Rana, A Take, N Ghahramani, D Clohan, S McDougall, S G. Evans, H J. Chen
Tailings dam breaches have caused significant life loss, social, economic and environmental damage in recent years. The term "tailings-flow" refers to various forms of tailings outflow movement result
Jul 1, 2021
-
Computer Assisted Ore Reserve Calculations at Western Mining Corporation Ltd's Kambalda Nickel OperationsBy Reichman J. P
Extensive use is made of a small scale computer (IBM 1130), in the calculations of ore reserves for Western Mining Corporation's nickel mine at Kambalda, W.A. All surface drilling data such a
Jan 1, 1973
-
Characterising Liberation and Flotation Potential Using Image Analysis, Simulated Fragmentation and Small-Scale FlotationBy J Hunt
A critical aspect of geometallurgy is quantifying mineralogical and textural relationships that affect mineral processing (eg, liberation and recovery). However, to date, this has been an expensive an
Sep 5, 2011
-
Extension Hill Direct Ship Iron Ore Project – Seven Years in the MakingBy R Forster
Direct ship iron ore (DSO) operations at Extension Hill in Western Australia’s Midwest region have commenced, with fi rst product railed to the port of Geraldton in July 2011. Reserves are 14.8 millio
Jul 11, 2011
-
Limnological Processes in the Development of Acid Pit LakesLimnological processes are often overlooked when trying to assess the long-term water quality of pit lakes. It is essential to deal with these aspects, since they determine the geochemical and redox c
Jan 1, 2003
-
Designing Flotation Circuits for High Fines RecoveryBy D C. Curry, M F. Young
Many flotation operations need to improve liberation to increase recovery, yet often plant operators are concerned that finer grinding will produce æslimesÆ with low flotation recovery. Yet simple cir
Jan 1, 2005
-
Determination of the Complete Sampling Distribution for a Particulate MaterialBy G J. Lyman
The theory of sampling has progressed slowly over the last century. The concepts of correct sampling were known to mining engineers such as D W Brunton in the 19th century. It was recognised early in
Jul 29, 2014
-
Outside the Dyke Bulge - The A1 Gold Mine Extension, Gaffneys Creek, VictoriaBy D J. Clark, R F. Wright, M D. Goodz
The A1 Gold Mine is a Devonian-age narrow vein high-grade gold deposit located 115 km east of Melbourne. The mine operated almost continuously from 1861 to 1992 producing 442 334 ounces of gold (13.8
Jan 1, 2009
-
Union Reefs: A Project Assessment and Development Case HistoryBy Giles D, Wegmann D
The Mt Todd Gold Project is located 42 km northwest of the township of Katherine within the Northern Territory of Australia. It is situated in the southeastern portion of the Pine Creek Geosyncline.
Jan 1, 1994
-
Improving the Performance of Precipitator Tanks in an Alumina Refinery Using CFD ModellingBy A Manzoori, M T. Shadloo
This paper describes a CFD modelling study which was carried out to investigate possible improvements in the design of an alumina precipitator tank at the Jajarm plant of Iran Alumina Company. In part
Jan 1, 2006
-
Integrated Industry Relevant Research Initiatives to Support Geometallurgical Mapping and ModellingBy S Walters
The emerging discipline of ‘geometallurgy’ is not new but is becoming increasingly recognised as a discrete and high-value activity. Geometallurgy involves a quantified and spatially constrained appro
Sep 5, 2011
-
Integration of Geoblast and D&B Engineering as an engineering tool in PT. Indo Muro KencanaBy H Utama, hi, A Suw
PT. Indo Muro Kencana (PT.IMK) is gold and silver mine located in Central Kalimantan province, Indonesia. Mining activities in PT.IMK is conducted in Bantian pit area by applying surface mining method
Nov 29, 2022
-
Quantifying Geotechnical Risk in the Mine Planning ProcessBy T P. Medhurst
In many cases mine design is the most important driver of the profitability of a mining project, however to reach an æoptimumÆ mine plan many compromises have to be made. Some of the fundamental profi
Jan 1, 2000
-
Defining Sustainability Criteria in Project Design - A Case Study of the Olympic Dam ExpansionBy H Bateman, I Cawrse, G Carnes, S Cawrse
In developing mineral resources, the focus typically centres on the management of identified social and environmental impacts and compliance with regulatory requirements. However, opportunities to pro
Jan 1, 2009