Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
A View of Commodity AgreementsFor the last 4 years political leaders have found a new subject on which they can safely generalize wihout creating opposition. That sub- ject is commodity prices. Since the four-fold increase in O
Jan 1, 1978
-
Examining the toxicity of respirable coal dust from interaction with\ moistureBy S Azam
Coal is a vital energy source and source of carbon for metallurgical applications, contributing significantly to the world economy. Coal mining and processing involve multiple processes that generate
Oct 12, 2022
-
æShot to ShovelÆ ù Understanding the Impact of Muckpile Conditions and Operator Proficiency on Instantaneous Shovel ProductivityBy J Battista, J Grace, I Brunton
The need to better understand and develop strategies to improve instantaneous shovel productivity at the Cadia Hill Open Pit Mine (CHM) instigated the development of the æShot to ShovelÆ project. This
Jan 1, 2004
-
Impact of Co-disposing Mixed Plant Rejects on Spoil Pile SettlementsBy D J. Williams, A K. Kho, A Shokouhi, N Tucker
The disposal of dewatered coalmine tailings and coarse reject within spoil piles is gaining popularity as a means of eliminating separate surface tailings storage facilities or dams. The contrasting c
Jul 27, 2015
-
Underground Ore Handling SystemsBy B Olsson, C Glassock
Computer simulation modelling (discrete event) has been used at Olympic Dam (OD) to model the handling of ore from the point of extraction at the stope drawpoint through to the ore stockpile on the su
Jan 1, 2005
-
Measurement of Blast-induced Pressure in Bench Blasting and Deciphering Explosive Performance through Rock Mass Response Analysis – A MethodologyBy A K. Raina, V M. S R Murthy
Rock mass response in blasting is an important element to determine the performance of a blast along with its other outcomes. The near-field monitoring for rock mass response analysis is vital for det
Aug 24, 2015
-
Special Purpose Simulator for Improved Estimation of Day-to-Day CIL/CIP RecoveriesSampling of CIL/CIP circuits is typically done by compositing samples of feed and tails over eight or 12 hour periods. As the residence time in the leaching tankage may be approximately 20 hours, the
Jan 1, 2006
-
Application of a reinforcement learning AI solution for optimisation of screening shuttles controlBy A Horeth, E Duggan, B Versiani, A Gooch
Iron ore screening plant productivity is strongly affected by the performance of the shuttle operation, with the control system robustness and associated strategies having a direct impact on utilisati
Nov 8, 2021
-
Transforming dust control – lessons from tunnellingBy A De, B Palmer, rade, P Stowasser, A Fanning
Mining and tunnelling share many commonalities (eg confined working environments, excavation equipment and processes), but of significance is an overarching commitment to provide safe work conditions
Apr 16, 2024
-
Data cross validation for a newly commissioned dynamic drop test facilityBy D W. Evans
Research into the dynamic properties of ground support elements continues to grow at a global level, given the increasing importance of this field of application within underground hard rock mining. M
Nov 29, 2022
-
Unlocking value chain optimisation with a digital mining systemBy S Gulati, N Sarkar, T Vink, S Battersby, L Okada
This paper examines a successful project implemented by BHP Mitsubishi Alliance (BMA) and the Polymathian team at Deswik, aimed at enhancing short-term scheduling processes to reduce vessel turn times
Sep 1, 2024
-
High Pressure Particle Bed Comminution of Ores Minerals a ChallengeBy Kellerwessei H, Oberheuser G
A major breakthrough in extending the life of the wear material of high pressure roll crushers when treating moist, highly abrasive material has removed the last impediment to the widespread accepta
Jan 1, 1993
-
Life on the Rollercoaster - Mining and Milling the Kencana K1 Orebody, IndonesiaBy R Benton
Since commencement of underground production in March 2006 the Kencana K1 orebody has delivered over 0.9 Mt of ore containing 1.18 Moz Au until April 2009. The Kencana deposits are part of the Gosowon
Jan 1, 2009
-
A New Design of Pulp Lifter for Grate Discharge MillsBy Morrell S
As more and more autogenous and semi-autogenous mills are run in closed circuit with cyclones the limitations that can be imposed by poor grate and pulp lifter design are becoming increasingly appar
Jan 1, 1997
-
Mine Waste Cover System Design ù Linking Predicted Performance to Groundwater and Surface Water ImpactsBy C Wels
Current best management practice requires the placement of a cover onto most types of mine waste including tailings, waste rock and/or spent heap leach rock at closure of the mine. The objectives of a
Jan 1, 2003
-
Discovery to Production – The Athena Gold MineBy D Howe
The Athena gold deposit was discovered in 2007 by Gold Fields Australia Ltd, at the St Ives Gold Mine, 35 km southeast of Kambalda, Western Australia. Gold anomalism was identified in sheared Paringa
Aug 22, 2011
-
The Panguna Orebody: A Case StudyBy Swain H. D, Kay R. L
Assessment of mineral reserves in any ore- body hinges on both mineralisation characteris- tics and the economics of extraction. The mineral reserves statement depends on interpre- tation of diamond d
Jan 1, 1979
-
The Origin and Evolution of Australian Coal and Notes on Classification and RankINDEX OF CONTENTSIntroduction.Systems of classification of coals.RankClassification of Australian coals.Defects of systems in use in other countries.Indexing by Fuel Ratio.Classification by Ultimate C
Jan 1, 1948
-
Magnesium Sulfate Production ù First Value Added Salt From Saline Waters of the Murray Basin (Australia)By T Barto, D Thomson, T Norgate, C Doblin
Collaboration between CSIRO Minerals and SunSalt Pty Ltd, a salt producing company located in rural Victoria, has resulted in a commercial process to recover magnesium sulfate (commonly called Epsom s
Jan 1, 2004
-
Design and Construction Contract C916 Beauty World Station and Tunnels, SingaporeBy R McDonough
DTL2 contract C916 was awarded in March 2009 for S$340 M. This contract includes two mass rapid transit (MRT) 1100?m long bored tunnels using two slurry tunnel boring machines (TBMs), with an internal
Sep 17, 2014