Blast Monitoring and Blast Translation – Case Study of a Grade Improvement Project at the Fimiston Pit, Kalgoorlie, Western Australia
By M Fitzgerald
Fimiston Open Pit is operated by Kalgoorlie Consolidated Gold Mines (KCGM) as a joint venture between Barrick Gold and Newmont Mining. Over 110 years of underground mining resulted in the development
Aug 22, 2011
-
Mine Rehabilitation for Sustainable Landcare: Cost-Effective Strategies
By R Simcock
Why Rehabilitate? Legislative Requirement Land rehabilitation is a condition of resource consents for mining. Clause 17 (1) of the Resource Management Act 1991 (duty to avoid, remedy, or mitigate adve
Jan 1, 1997
-
A Geographic Information System for the Coromandel Region
By D N. B Skinner, R L. Brathwaite, M S. Rattenbury
The Institute of Geological and Nuclear Sciences is undertaking a mineral resource assessment study of the Coromandel region, due for completion in July 2000. A key part of the study is the assembly o
Jan 1, 1999
-
Ore Mineralogy of the Favona Epithermal Deposit, Hauraki Goldfield, New Zealand
I report results of over 850 microprobe analyses of sulfides, sulfosalts and electrum from the Favona adularia-sericite epithermal deposit of the Waihi district in the southern Hauraki Goldfield of Ne
Jan 1, 2004
-
Ultra Fine Grinding ù A Practical Alternative to Oxidative Treatment of Refractory Gold Ores
Since early-2001, Kalgoorlie Consolidated Gold Mines (KCGM) has successfully operated an ultra fine grinding (UFG) circuit to supplement its roaster capacity for the treatment of the refractory gold f
Jan 1, 2003
-
Arsenic Mobility During Vegetation of Gold Mine Tailings
By D Craw, C Smith, C Rufaut
Oceana Gold (NZ) LtdÆs, Macraes Gold Operation currently has two tailings impoundments, the larger of which covers approximately 75 ha. When an impoundment is temporarily out of use, the surface dries
Jan 1, 2004
-
Development Aspects of the Golden Cross Project
Permitting, engineering and evaluation, detailed design and construction aspects of the Golden Cross goldmining project in New Zealand are briefly reviewed. The extremely lengthy and complicated gover
Jan 1, 1990
-
The New Zealand Mining Regime with Particular Reference to the Development of Minerals Programmes
By W P. Player
The legislative operating environment, or the mineral regime, that a country has to offer is one of the key determinants that a company wanting to invest in an area takes into account in formulating i
Jan 1, 1995
-
Epithermal Alteration and Mineralisation at the Kapowai Caldera Complex, Coromandel Peninsula
By R M. Briggs
Kapowai Caldera Complex (KCC), located 10 km west of Tairua (eastern Coromandel Peninsula), is a late Miocene composite collapse caldera, formed during eruption of several small and large volume andes
Jan 1, 1999
-
Three-Dimensional Modelling of Construction Tolerance in Trapezoidal Segments
By R Bertuzzi
This paper presents a three-dimensional analysis of a trapezoidal-shaped segmental tunnel lining for a recent tunnelling project in Sydney. Two- dimensional analyses, hand calculations and equipment s
Jan 1, 2008
-
Sampling, Corporate Governance and Risk Analysis
By G J. Lyman, F S. Bourgeois
As the prices of metals slide, financial control of mineral processing operations becomes more and more important. Control of a mineral processing operation implies measurement of grades, recoveries a
Sep 7, 2015
-
The Development of ‘Radial-in-Reef’ Stoping at the Tasmania Gold Mine, Beaconsfield, Tasmania
By R Goddard
An alternative stoping method has been adopted for narrow vein stoping at the Tasmania Mine in Northern Tasmania. Colloquially described as ‘Radial-in-Reef’ (RiR) stoping, the method employs the drill
Mar 21, 2011
-
Python Underground Processing Plant Critical Design
Python Underground Processing Plant Critical Design The use of continuous gravity recovery in combination with a controlled breakage fine crushing and screening system followed by flash flotation has
Sep 13, 2010
-
Mn-Mineralisation in Pumpellyite-Actinolite Facies Schist of the Mount Patriarch Area, High Burn Valley, Lake Hawea
By A F. Cooper
Otago Schist in the Mount Patriarch, High Burn and Cameron Creek areas of northwest Otago grades from textural grade IIA in the east to textural grade III in the west. The entire region is of the acti
Jan 1, 2003
-
Gas reservoir and emission modelling to evaluate gas drainage to control tailgate gas concentration and fugitive emissions
By D J. Black
The process of longwall coal extraction coal causes fractures in the overlying and underlying strata and these fractures become pathways for gas released from adjacent coal seams to flow into the mine
Aug 28, 2017
-
Current Geological Understanding of Telfer Gold Mine
By R J. In, C Moore, P J. Moffitt, T Hansen
Telfer Gold Mine combines a world-class gold and copper resource and longevity of operation as a major gold and copper producer. Telfer Gold Mine has undergone a series of transformations since mining
Jan 1, 2000
-
Coal Research in New Zealand - Exploration to Utilisation: Making Applied Links in the Energy and Coal Industries
By A H. Clemens, T A. Moore
This paper discusses a number of technical issues related to marketing coal. It outlines how the results of research undertaken in New Zealand and overseas can help producers address a range of techni
Jan 1, 1997
-
Geological Parameters Controlling the Improvement of Manufactured Sand Using Vertical Shaft Impact Crushers Instead of Cone Crushers
Geological Parameters Controlling the Improvement of Manufactured Sand Using Vertical Shaft Impact Crushers Instead of Cone Crushers Natural sand is a limited resource. In Sweden the total use of nat
Sep 13, 2010
-
Internalising Ecological Costs in Evaluating and Planning a Mining Project
By Q Wang
Net present value (NPV) has been the main criterion in mining project evaluation and production plan optimisation. It is a common practice in NPV calculations to take into account only the tangible co
Sep 26, 2011
-
E26 Lift 1 North block cave development and construction
By R Cunningham
The E26 Lift 1 North Project took 37 months from the approval on 1st January 2019 to the commencement of production on 1st March 2022. This was five months ahead of the feasibility plan. When compared
Mar 29, 2023