Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Potential and Applications of Underground In Situ BioleachingBy R Schlueter, H Mischo
The mining industry is facing a variety of geological, technological and social challenges. Future deposits show a general tendency towards increasing depth with complex ores and decreasing grades. On
Nov 4, 2015
-
Fosterville gold mine – breaking the mould for Victorian goldBy N Phillips
Fosterville gold mine recently celebrated production of its one millionth ounce of gold based firmly within a history of refractory sulfide gold mining. Compared with other Victorian gold mines, the d
Sep 20, 2017
-
Active and Extinct Geothermal Systems - A SummaryActive geothermal fields show many of the characteristics seen in hydrothermal ore deposits but there are important differences as well. There are, for example, many differences in geology and chemist
Jan 1, 1986
-
A Case Study of the Zhilingtou Gold-Silver Deposit, Zhejiang, ChinaBy C Zhang, P Wang, S Yao
The Zhilingtou Au-Ag deposit is situated in the eastern part of the complexly deformed and metamorphosed South China Caledonian Fold Belt. It consists of seven orebodies that are almost exclusively ho
Jan 1, 1995
-
Copper-Molybdenum Concentrator Surveys Using Mineralogy and Process Benchmarking Tools to Improve Overall Plant PerformanceBy P Thompson, D Rose, S Yu, W Baum, R Zahn, D Meadows, G Hall
Opportunities to improve mill operations are often cited by mining companies and recognised in many concentrators spread throughout the world but are not always followed through. Copper-molybdenum con
Sep 1, 2014
-
Active and Passive Seismic Monitoring of Cave Front EvolutionBy R A. Lynch
The state-of-the-art in cave seismic monitoring is reviewed, with the latest developments in active seismic monitoring included. Seismic monitoring systems are routinely used by most of the world’s bl
May 9, 2016
-
Social licence to operate – circular economyBy L Schürmann, R Kendall
Social licence to operate is becoming part of a mining company’s DNA in the same way as health and safety. Consequently, mining companies are receiving increasing pressure from their shareholders to e
Jun 22, 2022
-
Contemporary Criteria of Open Pit Long-Term Production SchedulingProduction scheduling of open pit mining is a key area as it deals with the management of operating cash flows of mining companies. The efficiency of long-term schedules is usually assessed with econo
Sep 26, 2011
-
Environmental Planning in MiningThe discussion in this paper centres on examples of mining that are drawn mainly from the coal mining industry. The intention is to review the opportunities that exist for incorporating environmental
Jan 1, 1981
-
Mill relining optimisation – a story of collaborationBy P Rubie, B Morgan, J Russell, C Stewart
The relationship between efficient liner exchange, concentrator availability and concentrator profitability is well documented. Russell Mineral Equipment’s (RME) relationship with OZ Minerals’ Promine
Sep 11, 2017
-
Towards an Integrated Framework for Asset and Process Health Monitoring and Optimisation on a Milling CircuitBy G T. Jemwa, F Rousseau, F J. Wolfaardt, J A. M Rademan, P W. Smit
Mining companies are increasingly faced with the challenge of reducing operating costs while maximising throughput and profitability. At the same time, the grade and quality of treated ores are becomi
Sep 26, 2013
-
Analysis of Heavy Mineral Sands by Quantitative X-Ray Powder Diffraction and Mineral Liberation Analyser û Implications for Process ControlBy S M. C Verryn, K Deysel
In heavy mineral sands ilmenite, rutile and zircon are present in economic concentrations. These minerals are important sources of Fe, Ti and Zr for various industrial uses. The beach sands of norther
Jan 1, 2008
-
Back to the Future - Why Change Doesn't Necessarily Mean ProgressBy P A. Tilyard
There have been enormous changes in mineral processing in the past four decades. For example grinding mill power has increased by an order of magnitude, regrinding is done to -10 microns and flotation
Jan 1, 2009
-
SAG mill optimisation and increasing throughput at the Phu Kham Copper-Gold Operation – a success storyBy D Baas, J Le, R Braun, R Chandramohan, K Hollis, G Lane
The Phu Kham Copper-Gold Operation (Phu Kham) is located in northern Laos, approximately 140 kilometres from the capital, Vientiane. The operation is a producing asset for Australian-based copper and
Aug 29, 2018
-
21st Century BondBy M Sherman
The challenge facing the engineering provider is to calculate throughput rates when faced with disparate specific energies calculated by different testing methodologies. Typically, an ownerÆs team wou
Aug 12, 2013
-
Separation of Iron Particles from Banded Haematite Quartzite (BHQ) Ore by Selective Magnetic CoatingSeparation of Iron Particles from Banded Haematite Quartzite (BHQ) Ore by Selective Magnetic Coating The separation of fine iron particles from banded hematite quartzite (BHQ) has been studied using
Sep 13, 2010
-
Epithermal Vein Mineralisation and Alteration, Waiotahi Valley, ThamesBy D S. Clarke, K B. Sporli
The Thames Goldfi.eld has been a major gold resource in the west of the Coromandel Peninsula, New Zealand, with the Waiotahi quartz vein system forming a large part of the field. Mineralisation is hos
Jan 1, 1991
-
Velvet underground exhumed – discovery and development of a new mining front at the Kanowna Belle gold mineBy G Tripp, G Lorusso
The Velvet gold orebody (153 Koz Au) is located near the Kanowna Belle gold deposit in the Boorara Domain of the Kalgoorlie Terrane, a subdivision of the Archaean Eastern Goldfields Superterrane (Swag
Sep 20, 2017
-
Electricity û Demand and Supply Conservation and the EnvironmentConservation and environmental issues are raising their profile with respect to both demand restraint and electricity supply options. In New Zealand, conservation pressures and energy efficiency need
Jan 1, 1990
-
Ore Treatment at Martha Current Operations and Future DirectionsThe treatment plant at Martha Mine was upgraded from a nominal throughput of 110tph (O.93mtpa) to 150tph (1.25mtpa) late 1999. Post-upgrade performance did not meet expectations when treating either t
Jan 1, 2001