Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Analysis Method into True Detonator Delay Element DiscrepanciesBy Joseph Daly
An investigation into inaccurate scatter of pyrotechnic detonators led to the innovation of utilising existing (every day) equipment in a manner to accurately determine the true scatter of detonators.
Jan 1, 2014
-
Bench Blasting Design Based on Analysis of Blast-Induced Ground Vibrations at an Open Pit Coal Mine in TurkeyBy Gungor Tuncer, Ali Kahriman, Abdulkadir Karadogan, Alper Celtikci, Serdar Celik, Yucel Karakus
This paper presents bench blasting designs based on results of vibrations analysis on test shots organized in an open pit coal mine located near to Soma district at Manisa province in Turkey. There ar
Jan 1, 2012
-
Explosive Detection Recovery and DisposalBy Robert McClure
The detection, recovery and disposal of commercial explosives and explosive waste has always carried a level of risk and requires specialized equipment and technical expertise. Improperly stored, disc
Jan 1, 2015
-
Underground Blast Doors: Measured Pressure Drop and Human Exposure SafetyBy Matthew Hirsch, Jason Connot, Nathan Rouse, Srivatsan Jayaraman, Akash Adhikari, Brent Meins, Purushotham Tukkaraja
The Deep Underground Neutrino Experiment (DUNE) is a world-class particle physics research project currently being constructed 4,850 ft, 1,478 m underground at the Sanford Underground Research Facilit
Feb 6, 2023
-
Improved Drilling Accuracy Results in Reduced Ore Dilution at Evolution, CracowBy Phil Jones, Ben Johnson
During a period of six months in FY2018, a series of trials were conducted to compare drilling accuracy using two different methodologies and the subsequent impact this had on ore dilution. Testing wa
Jan 1, 2019
-
The Advantages of Recycled Oil in Blasting, a Refreshing ApproachBy Joseph Daly
This is the detailed evaluation of the establishment and implementation of an ‘oil recycle plant’ located on site at Boggabri Mine NSW, (Australia); its production, its use and its value. Also discuss
Jan 1, 2014
-
Journal: 100 Years / Mining & Scientific Press San Francisco March 18, 1905By Robert Hopler
This article, advocating having employees whose specific job would be to fire blasts in underground coal mines in llinois, was written 5 years prior to the establishment of the U.S. Bureau of Mines,
Jan 1, 2006
-
Analysis of Environmental Effects Induced by Cautious Blasting During the Excavation of Istanbul Subway ConstructionBy Ali Kahriman, Abdulkadir Karadogan, Alper Celtikci, Ahmet Varol, Ertugrul Kaya, Turgay Ozat
This paper presents analysis of environmental effects induced by cautious blasting during the construction of the Istanbul Subway 4 Levent - Ayazaga Darulsafaka Metro Tunnel Project carried out by the
Jan 1, 2011
-
Influence of Burden on Intensity of Ground Vibrations and Air Overpressure in Opencast Bench BlastingBy AK Chakraborty, AK Raina
Burden of drill hole is third most sensitive parameter effecting the ground vibration in blasting apart from maximum charge per delay and distance. Various types of burdens can be seen in practical be
Jan 1, 2004
-
Using the Superposition of Seed Waveforms to Predict Seismic Effect by BlastingBy Yang Jun, Qu Mei, Zheng Yao-wu, Chi Li-yuan
Due to the necessity of the prediction of blasting seismic effect around strip mine bench blasting area, the paper provides a method to predict the blasting seismic effect by employing the superpositi
Jan 1, 2015
-
Acceleration and Deformation of an Explosively-Driven Metal PlateBy Steven A. Mathe, Seokbin Lim
Current analytical models can accurately predict the final velocity of explosively driven flyers and can somewhat predict the acceleration profile, but do little to address the deformation of the flye
Jan 1, 2015
-
Strategic Public Relations for Underground Conservatory at Tennessee Governor’s ResidenceBy Jake Hutchison, Wade Hutchison
The opposition to the project has risen as a result of some political pressures and from public perceptions about the project’s necessity and its impact on the neighborhood. As a result of this contro
Jan 1, 2009
-
Journal: Safety Talk / Value of a Good Hearing Loss Prevention ProgramWhen a company has an effective hearing loss prevention program, everyone wins-the employers, the employees, and the safety and health professionals who implement the program. This guidebook is not ab
Jan 1, 2006
-
Effects of Electronic Detonators in Underground Tunneling ApplicationsBy Charles Zdazinsky
Over-break is undesirable in underground civil construction because it excessively damages rock along the perimeter of the tunnel, which directly influences the cycle times of advancement. A quicker c
Jan 1, 2015
-
Detonation Line Standards and Specifications-Someday?By James A. McGrath
"The predominant key word associated with all commercial blasting methods is “safety”. Safetyshould take precedent over all other aspects of the entire explosives industry which on a wholehas had an e
Jan 1, 1999
-
Underwater Blasting: A SummaryBy Joshua Taylor Drake
This report answers specific questions concerning underwater blasting considerations, and blasting safety. The blasting considerations discussed consist of basic blasting principles, and new variables
Jan 1, 2015
-
Mining and Fragmentation: Proposal for a More Efficient Mine ManagementBy Ivan Carrasco, Benjamin Cebrian
Mining companies have traditionally organized their structure around a scheme easy to manage: Mining Department and Mill Department. In a challenging landscape for mining, with decreasing grades, incr
Jan 1, 2014
-
Community Response To Airblast And Vibration From Surface ChargesBy L. Wilson, M. Kotzel, T. Pienaar
An empirical equation is presented for the maximum airblast from unconfined charges. This has been tested at a number of sites and with charges ranging from 0.1kg to 311kg. The equation is developed t
Jan 1, 2011
-
Journal: Safety Talk / Determining The REAL Cost of An AccidentBy Mark Abernathy
When most people think of a motor vehicle accident, the direct costs resulting from that accident, such as vehicle repair or towing charges, are generally easy to quantify. However, the indirect costs
Jan 1, 2006
-
Reducing Overall Toxic Fumes at Fixed Work Output, by FormulatingBy Michael Wieland
For shooting rock properly, some relatively fixed quantity of rock work is required from the total charge mass, while keeping the overall toxic fumes to a minimum. The overall fumes weighted for the t
Jan 1, 2006