Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Brightman Street Bridge Replacement ProjectBy Arturo Ressi di Cervia
Construction of the drilled shafts for the Brightman Street Bridge Replacement Project were not only challenging due to working over the water but were also challenged by changed soil conditions, conc
Jan 1, 2003
-
Numerical Modelling of a Deep Excavation Shoring for Replacement of Control Structure at a DamBy Lok M. Sharma, Deep K. Khatri, Bradfield. Brett
"A shored enclosure was required to access a control structure upstream below the dam of a deep lake. The shoring involves the interaction of the structure, soil, and water and the loads imposed inclu
Jan 1, 2017
-
The Effects Of Changes In Effective Stress On A Base Grouted Pile In SandBy V. M. Troughton
Large diameter bored piles with grouted bases have been adopted for the foundations of the majority of the buildings at Canary Wharf in London's Docklands, including a deep basement car park. The
Jan 1, 1989
-
Uplift Capacity Of Drilled Piers In Clay - SynopsisBy Braja M. Das
Laboratory model test results for the ultimate uplift capacity of square and circular foundations in saturated clay (ø=0) have been presented. The results of the present model tests for square foundat
Jan 1, 1987
-
Behavior Of Mini-Piles Used In Foundation Underpinning In Beaumont Clay, Houston, Texas, USABy O&apos, M. W. Neill
Mini-piles have been found to be a practical, technically correct remedial underpinning method. They can be constructed in limited access areas with very little disruption. Experience indicated that m
Jan 1, 1989
-
Micro-Pile Foundations in Difficult Subsurface ConditionsBy D. Dreher Whetstone, Paul M. Blakita, Christopher M. Reith, Ravi P. Malviya
"Micro-piles are small diameter (5 to 10 inches), cast-in-place piles which can develop high load capacities by bonding with soil or rock. Micro-piles are particularly well-suited for moderate to heav
Jan 1, 2005
-
Innovative Soe Solutions For Shaft Construction: Getting To Depth With Diaphragm Walls At Westerly Storage TunnelBy Ryan Sullivan, Lisa Smiley, Jewels Stover
The Westerly Storage Tunnel (WST) Project is part of Project Clean lake, the North East Ohio Regional Sewer Dist years. When completed in 2020, WST will be nearly 2 miles of 25-ft diameter tunnel 200-
-
Slurry Wall Design for Construction Using Soil Structure InteractionBy Nino Catalano, Meeok Kim, Gordon Chen
"The design of the below grade structure of Brigham Building for the Future (BBF) included three different areas to provide power generation and medical facilities as well as a parking garage. The thr
Jan 1, 2017
-
Numerical Modeling Of Dynamic Soil-Structure Interaction In Bridges With Hp Driven PilesBy Tu Bao
HP-Pile foundations are the most favorable type of foundations for bridges because of their constructability, versatility with regard to subsoil conditions, and settlement controllability. For many
-
Numerical Modeling of Dynamic Soil-Structure Interaction in Bridges with HP Driven Piles (47ff630e-35bf-41f4-946a-236631b70ac5)By Andrew Rietz, Yu Bao, Steven Halewski
"HP-Pile foundations are the most favorable type of foundations for bridges because of their constructability, versatility with regard to subsoil conditions, and settlement controllability. For many y
Jan 1, 2017
-
Innovative Methods for Underground Parking in Central CitiesBy Qi Wang, Zengzhu Kang, Jianguo Liu, Guanglei Liu
"Due to the increase of automotive vehicles, available parking spaces become a new type of limited resource in central cities of China, especially in those old districts without visionary urban planni
Jan 1, 2017
-
A Case History On The Design, Construction, And Field Quality Control Of Cement Deep Soil MixingBy Suthan Pooranampillai
This paper presents a case study of the use of single axis cement deep soil mixing (CDSM) to deal with static settlement and seismic stability of the foundation soils under a reinforced soil slope (RS
-
St. Louis Service Base Floating Wharf Mooring System ReplacementBy A. Bozorgzadeh, B. M. Jensen, B. N. Koelling, B. R. Murtaugh
"The Service Base mooring system originally consisted of two general types of structures, 19 timber piles cabled together and steel three-legged pipe piles. The St. Louis District fleet moored to the
Jan 1, 2017
-
Design and Construction of Specialty Foundation for the Historic Virginia State Capitol BuildingBy Robert S. Thomas, Bernard M. Tarralle, Nasser Massoudi
"The Commonwealth of Virginia is restoring and expanding its Capitol of great historic significance. Designed by Thomas Jefferson in 1785, it is the second oldest Capitol building in the United States
Jan 1, 2005
-
Engineering Successful Dewatering in Arid Urban Areas: Abu Dhabi Dewatering GuidelinesBy M. Melih Demirkan, Juan J. Gutierrez, Raghav Ramanathan
"As the capital of the United Arab Emirates (UAE), Abu Dhabi is one of the world’s fastest-developing cities. To sustain its significant growth rate, Abu Dhabi must surmount challenging engineering pr
Jan 1, 2017
-
A Case History on the Design, Construction, and Field Quality Control of Cement Deep Soil MixingBy Dominic Parmantier, Karen Dawson, Suthan Pooranampillai, Seungcheol Shin
"This paper presents a case study of the use of single axis cement deep soil mixing (CDSM) to deal with static settlement and seismic stability of the foundation soils under a reinforced soil slope (R
Jan 1, 2017
-
Testing Foundations for Major Minnesota BridgesBy Dan A. Brown, Rich A. Lamb, Paul J. Axtell
"Over the last 10 years, the Minnesota Department of Transportation (Mn/DOT) has had a very active program of replacing many major bridges, large structures spanning the Mississippi River. The deep fo
Jan 1, 2013
-
Innovative Crosshole Sonic Logging Testing Drilled ShaftsBy Joshua C. Adams, Les Chernauskas, Edward L. Hajduk
"Drilled shafts are increasingly being used to support bridge and building foundations. Because these foundations usually carry very high design loads and often serve as non-redundant, single load car
Jan 1, 2009
-
Case Study: Natomas Levee Improvement Program Cutoff WallsBy Matthew D. Marks
The Sacramento Area Flood Control Agency initiated the Natomas Levee Improvement Program in 2006 which would bring the entire 42 mile Natomas Basin perimeter levee system into compliance with applicab
-
Installation and Efficiency of Common Helical Pile CouplingsBy Jason Herron, Joseph Brown
The common couplings for joining sections of helical piles with an outside diameter of 6.625 inches and 8.625 inches are square on square, flange to flange, external pipe sleeve, internal pipe sleeve,
Jan 1, 2019