Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Geotechnical assessment for the waste rock backfilling of the decommissioned Rum Jungle Open Cut Pit
By J Hartnett, B Tarrant, A Rayner, D O’Toole, P Davies
Since 2009, the Northern Territory and Australian governments have been working under a national partnership arrangement to inform a rehabilitation plan for the former Rum Jungle uranium mine. Part of
Jul 1, 2021
-
A New Approach for Reverse Flotation of Magnesite From Dolomite
By G Chen
Magnesite and dolomite are two salt-type minerals. The surface characteristics of these two minerals are almost the same. It is very difficult to remove dolomite from magnesite ores by flotation proce
Jan 1, 2005
-
Depositional Behaviour of Coal Tailings, Co-Disposed Coal Washery Wastes, and Loose-Dumped Coarse Reject
Coal washery wastes comprise tailings, finer than 0.5 to 0.1 mm depending on the sophistication of the washery, and coarse reject, typically finer than 50 mm. Subaerial disposal of coal tailings slurr
Jan 1, 1998
-
Depositional Behaviour of Coal Tailings, Co-Disposed Coal Washery Wastes, and Loose-Dumped Coarse Reject (AuslMM '98 - The Mining Cycle)
By D J Williams
Coal washery wastes comprise tailings, finer than 0.5 to 0.1 inn depending on the sophistication of the washery, and coarse reject, typically finer than 50 mm. Subaerial disposal of coal tailings sl
Jan 1, 1998
-
An Assessment of Kalgoorlie Consolidated Gold Mines and Boddington Gold Mine Water Sources and Proposed Water Auditing Framework Underpinning Improved Water Allocation Compliance and Reporting
By G E. Ho, M Anda, S Dallas
Water auditing and water conservation measures are fast becoming the quantitative tools for water balance reporting in the mining and minerals processing sector. Therefore, this paper was written to d
Jan 1, 2009
-
A Remotely Operated Robotic Rock-breaker with Collision Avoidance for the Mining Industry
By A Boeing
Rock-breaker automation and remote operation improves the safety and efficiency of mining operations. This paper presents an overview of the Rocklogic rock-breaker automation system architecture that
Mar 24, 2014
-
Increased Performance Through Flash Flotation and Cyclone Optimization
By Rais SA
In June, 1986, Freeport Indonesia, Inc., in conjunction with Out- okumpu USA, laboratory tested the Flash flotation concept on Primary ball mill underflow. These laboratory results indicated a possib
Jan 1, 1988
-
Oxygen Leaching of Copper-Lead Matte in Acidic Chloride/Sulphate Solutions
By Ricketts N. J, Smith G. D J
A hydrometallurgical process was developed for recovery of copper from copper-lead matte formed as an intermediate product at the BHAS lead smelter at Port Pirie. A plant utilizing this process was
Jan 1, 1987
-
Mount Isa Minerals Province - A New Mining Cycle
Recent mineral exploration successes in the Proterozoic rocks of the Mount Isa Inlier are unprecedented in the regionÆs history. This new era of discovery, particularly for æblindÆ deposits, owes its
Jan 1, 1998
-
Dump Leach Operation at Wiluna Western Australia
General Gold was discovered in quartz veins at Wiluna in 1896, and the first lode was discovered in 1904. Since 1896, some 2.5 million ounces of gold have been produced from the Wiluna area. The min
Jan 1, 1994
-
Open Stope Mining in Canada
By M Hudyma
Open stope mining is the most common mining method employed in underground, hard rock mines in Canada. It is characterised by relatively small, single lift stopes (20 000 to 100 000 tonnes), and fast
Jan 1, 2000
-
Groundwater Search Management In Desert and Arid Terrain - A Case History Telfer, Great Sandy Desert, Western Australia
During the intial two years (1972 - 1974) of exploration at Telfer, water require- ments were limited to supporting a 50 man camp and diamond drilling to verify thickness and grade of the strataboun
Jan 1, 1988
-
Speiss Lump Formed at the Bottom of Copper Blast Furnace
Completing its historical role the opera tion of copper blast furnace of the Saganoseki Smelter was terminated in 1970, but it left some interesting data on metal lumps formed at the furnace bottom
Jan 1, 1980
-
Consideration to Increase Gas Drainage Ration Basing Upon Methane Drainage Practice in Japan
By Ohga K, Isobe T
Basing upon many and long practical experiences of gas drainage from coal seam and results investigations on the gas flow through in si-tu coal seam using tracer gases,it became clear that solid co
Jan 1, 1982
-
Review of Seam Gas Drainage in Australia
By Lunarzewski L
Gas problems, largely instantaneous outbursts of coal and gas, arose in the early days of coal mining in Australia, leading to attempts at predrainage often including destressing. With deeper mining a
Jan 1, 1985
-
The Mount Bonnie Gold Silver Project
By Eupene GS, Cheong GE
Operations at the Mount Bonnie gold/silver project are described. The project is based on the gossan of a stratiform and stratabound polymetallic sulphide deposit. The gossan contains approx- imat
Jan 1, 1984
-
Effects of Froth Properties to the Behaviour of Flotation
By Kallioinen J
This paper discusses different possibilities to enhance coarse particle flotation using forth manipulation and improved flotation cell design. Experiments were carried out in laboratory, pilot and i
Jan 1, 1993
-
High Resolution Airborne Geophysics for Epithermal Gold Exploration in North-Eastern Queensland
By Henley R, Harris L
High resolution airborne magnetic and radiometric data have been shown to optimize exploration for epithermal gold deposits in the vicinity of Charters Towers, northeastern Queensland. The radiomet
Jan 1, 1989
-
New Zealand Offshore Gold Exploration - The Harvester Project (bcafb7fe-f4fe-443d-a859-746bfe203af9)
By Corner NG
A sea bed sampling programme by CRA Exploration Pty. Limited over an area of 12000 km offshore from Westland, Southland and Otago, New Zealand, led to the discovery of the Harvester Prospect, an area
Jan 1, 1990
-
The Planning and Development of Newman-An Iron Ore Community in the Pilbara
FIRST TOWN PLANNING PROPOSALS Initially, accommodation at the minesite was provided at the Pastoral Homestead situated some seven kilometres north-east of the mine and between 1963 and 1966 was the
Jan 1, 1976