Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Drilling – Equipment, Methods and Materials - Laboratory Studies of Formation Damage in Sands Con...By A. E. Anderson, H. J. Hilll
Laboratory data for 155 field muds and 77 .shales have been used to develop correlations to estimate the net streaming potential component of the SP. Analysis of these data and comparison with field t
-
Stripping of Fe (III) from D2EHPA Using Different ReagentsStripping of Fe (III) from D2EHPA Using Different Reagents The common way to extract Fe(III) from an organic solvent is by using concentrated acidic solutions. The stripping of Fe(III) from organic s
Sep 13, 2010
-
Technical Papers and Notes - Institute of Metals Division - In Sb-Sn SystemBy R. N. Zitter
PRESENT work was done in connection with a program for obtaining a low energy gap semiconductor suitable for photodetection. The inter-metallic compound InSb, which is now being in-
Jan 1, 1959
-
The Settlements Of Buildings On Pile FoundationsBy Mait Mets
In Estonia, the deformations monitoring of 1500 buildings are currently under investigation, buildings on pile foundations make up 10 per cent of these. In the following text we will be considering th
Jan 1, 2002
-
Identifying Moisture Sensitive Roof Rocks in Coal MinesBy Gregory M. Molinda
Historically, miners have known that roof rocks originally composed largely of mud were prone to slaking and deterioration when exposed to water and humidity. Mine Safety and Health Administration (M
Jan 1, 2006
-
Measuring and Analysing Percussive Pulses to Extend Depth in Top-hole Percussion DrillingBy Gary Cavanough, Stuart Addinell, Hector Parra
Drilling deep, straight, accurate holes in hard rock to achieve efficient blasting is a challenge for the mining/quarrying industries with short holes normally drilled using “top hole hammer” (THH) an
Jan 1, 2013
-
Study on Strata Control Based on Pillar Stress and Surface Cracks in Shallow Multi-Seam MiningIn order to ensure safe mining and reduce surface damage in shallow multiple-seam mining, the failure characteristics of interburden strata with different coal pillar offset distances between pillars
Jul 28, 2020
-
Problems Of Cast In Situ Driven Piles Added To Existing Piles And Built Near A Standing StructureBy L. F. Albert
The paper describes solutions given to foundation problems during the reconstruction of a power plant set on fire, located adjacent to several still Working Units. After a detailed site and laboratory
Jan 1, 1989
-
Heap Leaching Discussed at RoundtableBy Kerry Lahti, Bryan Ulrich
On Feb. 11, 2005, more than 20 mining professionals gathered in Elko, NV for a day-long round-table discussion on heap leaching. Attendees included project managers, operators and environmental profe
Jan 1, 2005
-
RI 3551 Beehive And Byproduct Coking In Washington ? IntroductionBy Joseph Daniels
[Adequate supplies of suitable coal and coke are prime requisites in many industries, particularly those dealing with the utilization of mineral resources, recently interest has been focused on the po
Jan 1, 1941
-
Pit Wall Failures On ?Unknown? Structures (76621150-30cb-4052-b037-75f5ff3cf933)A number of impending and actual pit wall failures have been observed and documented, which have been interpreted to initiate on newly generated structural features. This infers failure through intact
Jan 1, 2006
-
Onset of Void Coalescence Studied by X-Ray Computed TomographyBy Akihide Hosokawa
The void growth and coalescence in model materials involving a pre-existing three dimensional void array (i.e. multiple layers of a void array) was studied by X-ray computed tomography (XCT) coupled w
Jan 1, 2010
-
Numerical Expansion Analyses of the Strategic Petroleum Reserve in Bayou Choctaw Salt Dome, USABy B. Y. Park
This paper develops a series of three-dimensional simulations for the Bayou Choctaw Strategic Petroleum Reserve. The U.S. Department of Energy plans to leach two new caverns and convert of one of the
May 1, 2009
-
I-470 Mine RemediationBy Sheryl D. Gallagher
The project consisted of filling an abandoned underground limestone mine to facilitate construction of a new entrance ramp to I-470 in Lee?s Summit, Missouri. Due to collapse of mined areas near the
Jan 1, 2009
-
The research on the mechanical properties of hard roof in underground coal miningBy Xu Lin Sheng
During the mining course, when the roof above coal seams is constituted by thick and hard sandstone (conglomerate), sudden roof movements often take place with great force and de¬struction which is th
Jan 1, 1989
-
Hardening Effects Resulting From The Formation Of Both A Precipitate Phase And A SuperlatticeBy M. R. Pickus, I. W. Pickus
ORDINARILY age-hardening is thought of as being associated with a limited solubility of one metal in another. Much less has been written about the type of age-hardening that attends the formation of s
Jan 1, 1943
-
Evolution Of Piling Design And Techniques In Mudstone At Manchester AirportBy Colin Curtis
In recent years, Manchester Airport has undergone expansion including the construction of a second runway, a new terminal building (Terminal 3) and extensions to the existing Terminal 1. Manchester is
Jan 1, 2001
-
Pilot Tests for Heavy Metals Removal in Mine WaterBy M Vendrup, T C. Christensen, C Dube
The adsorptive and granulate forming MetClean™ process has been used at many locations in Northern Sweden, Norway, Denmark, France, Spain, Mongolia, Japan and Australia. It has been pilot tested and u
Sep 7, 2015
-
Extension of the Comminution Energy Curves and Application to Stirred Milling PerformanceBy P. Radziszewski
"The comminution energy curve is a profoundly simple graphical technique that displays detailed operating efficiency information for industrial comminution processes. The database underlying the meth
Jan 1, 2016
-
Long-Hole Directional Drilling Applications at Huntly West Mine, New ZealandBy D Vickers, N C. Fowke
The reduction of geological risk for planning of high production longwall faces is essential. Geological and geophysical techniques applied at Huntly West Mine before 1989 were unable to reduce the ge
Jan 1, 1991