Search Documents

  • DFI
    Design Of Sheet Piling For The Prague Metro Line C

    By Jan Pru?ka

    This paper describes the sheet pile design for the Line C extension from Ládví station to the North of Prague. The first part of the paper describes the geological conditions and structural configurat

    Jan 1, 2011

  • AUSIMM
    China-In The Post-War World

    The reconstruction of the world after the present war must inevitably be profoundly influenced by the rise and progress of New China.The principle of Chinese mathrity has been admitted by Great Britai

    Jan 1, 1944

  • DFI
    Geotechnical Investigation For Fashion Island Boulevard Bridge Earthquake Repair State Bridge No. 35C-160 San Mateo, California

    By Lawrence P. Goldfarb

    This paper presents the results of the geotechnical investigation for the repair of the Fashion Island Boulevard Bridge, Bridge No. 350160, in San Mateo, California. The concrete, precast girder bridg

    Jan 1, 1993

  • SME
    Design/Build Agreement For The Niagara Tunnel Project

    By Russel Delmar, Rick Everdell, Harry Charalambu, John Tait

    Award of the Design/Build Agreement for construction of Ontario Power Generation’s (OPG’s) Niagara Tunnel Project was made after an intensive 8-month international procurement process. The 14.4-m diam

    Jan 1, 2007

  • AUSIMM
    The Petrography of Some New South Wales Permian Coals from the Tomago Coal Measures

    Permian coal seams from the Tomago Coal Measures in the Northern Coalfield, New South Wales, were analysed petrographically and reflectance measurements made for each. Vitrite contents were moderate t

    Jan 1, 1968

  • AIME
    Technical Notes - Energy Requirements in Size Reduction

    By Y. Oka, H. Majima

    When a rock particle is subjected to an external force, internal stresses and deformations are experienced by the particle. Assuming that the breakage of a rock is mainly due to tensile stresses gener

    Jan 1, 1970

  • SME
    Design Based on Numerical Modelling a Requirement for an Economical Tunnel Construction

    By Gunter Swoboda, Harald Wagner

    Until a few years ago tunnel construction was based exclusively on experience. In recent years, however, numerical models have increasingly become an integrated part of tunnel design [2]. These models

    Jan 1, 1993

  • AUSIMM
    Auriferous Veins at Charters Towers

    Probably no other country or coutinent has so many rich deposits of various different minerals as Australia. Long ago in the days of my boyhood in the old land the marvellous discoveries of high perce

  • AUSIMM
    Technical Considerations of Public Listing and Ongoing Compliance for Minerals Companies

    By P Stephenson, G Mosher, M Berry, C Arnold, P Stoker

    "An EXTENDED ABSTRACT is available for download. A full-length paper was not prepared for this presentation. Globally, private minerals companies considering the transition to a public company and ent

    Mar 18, 2015

  • AUSIMM
    Mineralogical Study of the Reaction Between Lime and Natural Zeolites Used as Pozzolan

    By J Elsen, R Snellings, K Van Balen

    This research concerns the mineralogical study of the physico-chemical reactions taking place at the pozzolan-binder interface. Lime binder/ pozzolan mixtures have been prepared for different natural

    Jan 1, 2008

  • NIOSH
    RI 8931 - Deposition of Nickel-Cobalt Alloys by Controlled-Potential Electrolysis

    By J. L. Holman

    The Bureau of Mines is conducting research to improve technology for the recovery of strategic and critical metals, such as cobalt, nickel, and chromium, that are lost in bulk and particulate superall

    Jan 1, 1985

  • SME
    Tying Acceleration And GPS Location Information Together To Create A Mine Management Tool (46eb7fa8-c025-4c28-b865-1393c124ce32)

    By J. Walden, S. Rhoades, R. E. Miller, R. Gibbs, P. Boman

    Accelerometers and pressure transducers mounted in suspension components can be used to monitor the ride of haulage trucks. Presently, it is difficult to tell what caused a jolt to the truck using eit

    Jan 1, 1999

  • DFI
    Case Studies In Mission Bay, San Francisco: Deep Foundations In Challenging Soil Conditions

    By Lori A. Simpson

    Mission Bay is a 300-acre reclaimed site in San Francisco, California, that is currently being redeveloped. Plans include new neighborhoods, parks, a new University of California, San Francisco, rese

    Jan 1, 2006

  • AUSIMM
    Circular Tunnelling

    The work described herein is the opening phase of an extensive system of underground excavation undertaken under contract with a Malayan authority.The specifications called for the lining of all tunne

    Jan 1, 1941

  • NIOSH
    Mineral Industries Of Asia And The Pacific - Introduction

    By Edmond Chin

    The area encompassed by the political entities included in this study com-prises 11 million square miles or about 15 percent of the total Earth's land area. The bulk of the region is contained on

    Jan 1, 1992

  • AUSIMM
    Treatment of Mixed Sulphides by the ôHorwoodö Process

    ALTHOUGH the development of the various flotation processes during the last 8 years has been so revolutionary, this development has been, until recently, entirely confined to the separation of the gan

    Jan 1, 1912

  • SME
    The Madrid Renewal Inner Ring Calle 30 with the Largest EPB Machines—Planning and Results

    By Enrique Fernandez

    M-30, Madrid’s inner ring, covers 42 sq km of the city centre where one million people reside. It was constructed in several phases during the sixties and the eighties. The design criteria applied to

    Jan 1, 2007

  • SME
    Utilization of lignite fly ash as hydraulic binder and backfill material

    By I. Gombköto, G. Földing, G. Mucsi, B. Csoke, J. Faitli, B. Kovács

    This paper summarizes the main achievements of our previous project entitled "Development of a technological system producing quality guaranteed fly-ash based binder". Furthermore, this study deals wi

    Jan 1, 2011

  • SME
    Modelling of Geomechanics and Geoecological State of Massif in Region of Large-Scale Mining Work with Using of Supercomputer Technology

    By O. Konovalov, M. Zhuravkov

    In report the results of performance of research works on building up of the connected geoecological and geomechanical monitoring system for modelling and study of a state of mining massif in a region

    Jan 1, 2005

  • ISEE
    New Lightweight Dragline Buckets

    By Rowan A' Murry Karstel

    One way to ensure dragline productivity is by Increasing the size of the dragline bucket. In August 1994, Optimum Colliery in conjunction with Van Reenen Steel, Northwest Applied Technology, SSAB of S

    Jan 1, 1998