Search Documents

  • ISEE
    "Synchronized Blasting Demolition of Workshop and Chimney under ComplicatedConditions"

    By Jun Yang, Zongshan Zou, Mei Qu, Jianjun Zuo

    For technical renovation of the thermal plant, one frame structure workshop of 50,000 m2 (59,800 yd2) construction area and one reinforcement concrete chimney of 150m (492 ft) height shall be demolish

    Jan 1, 2016

  • AUSIMM
    Long Rockbolt Support at New Broken Hill Consolidated Limited

    Stope back conditions in the cut-and-fill stopes at New Broken Hill Consolidated Limited often deteriorate to such an extent that, because conventional rockbolts are not able to maintain safe working

    Jan 1, 1974

  • ISEE
    Explosive Operations and its Regulation in the Gulf of Mexico

    By D. J. Leidel

    The offshore production of oil and gas resources has been active in the Gulf of Mexico since Kerr- McGee drilled the first commercial well out of the sight of land in 1947. Since then, approximately 6

    Jan 1, 2002

  • SME-ICGCM
    Coal Mine Burst Prevention Controls

    By Anthony Iannacchione

    Coal mine bursts have represented a major hazard for U.S. mining operations for more than 90 years. During this time, many prevention controls have been developed and tested. This paper reviews 11 p

    Jan 1, 2008

  • ISEE
    Blasting 1 Million Tons, 205 Meters from a Town

    By Thierry Bernard, Guy Gagnon

    Blasting at very close proximity to urban areas is typically a situation where both local communities and mining stakeholders get nervous. The context becomes logically even more tensed when the blast

    Jan 1, 2014

  • SAIMM
    Phase Equilibria In High MgO Ferro- And Silico-Manganese Smelting Slags

    Phase equilibria have been determined experimentally for pseudo-ternary sections of the form ?MnO?-(CaO+MgO)-(SiO2+Al2O3) with a fixed Al2O3/SiO2 weight ratio of 0.17 and MgO/CaO weight ratios of 0.25

    Jan 1, 2004

  • ABM
    AVALIAÇÃO DAS TEMPERATURAS DE TRANSFORMAÇÃO NO DSC EM LIGA NiTi APÓS O ENVELHECIMENTO COM E SEM CARGA

    By Luiz Alberto dos Santos

    Neste trabalho foram usinados CDPs da liga com composição de 50,9 % at de Ni e, em seguida, as amostras foram envelhecidas em temperaturas entre 350-550 ºC, tensões aplicadas de 60 MPa e tempos de 45

    Aug 16, 2017

  • AUSIMM
    The Recovery of Zinc from Lead Blast-Furnace Slags

    As the question of zino recovery from lead blast furnace slags has lately become such an important subject with lead metallurgists, the following description of some of the work carried out in this oo

    Jan 1, 1920

  • DFI
    An Investigation of Grouted Pile Capacity Using Instrumented Pile Load Tests

    By Hayel M. El-Naggar, Sherif A. Akl

    Although grouted piles have been used for several decades since the idea was proposed in the 1970s, their design is mostly based on experience and unpublished proprietary methods. There is little rese

    Jan 1, 2018

  • SME
    Sustainability at Bucyrus

    By U. Paschedag, H. Bussmann

    "Bucyrus manufactures the most comprehensive product portfolio of mining equipment worldwide. Its mission is to have a positive, lasting effect on our world. Bucyrus makes sustainable development a fu

    Jan 1, 2011

  • SME
    Technical And Commercial Benefits Of Gearless Mill Drives For Grinding Applications

    By M. Ahrens, J. Gonser

    Gearless mill drives are a well established solution for grinding applications in the minerals and mining industries. The paper describes the functionality and technical features of such drive systems

    Jan 1, 2007

  • SME
    Innovative Solutions In The Development Of An Expert System At CCI’s Empire Mine

    By R. P. Sloan, A. S. Whitford

    In November 1999, CCI's Empire Iron Mining Partnership and MinnovEX Technologies Inc. developed an expert system for advanced control of their Empire IV Grinding Section. Empire IV is comprised o

    Jan 1, 2001

  • CIM
    Applied Mineralogy in Industrial and Metallic Mineral Deposits: Examples from Wollastonite, V-magnetite and Muscovite

    By Panagiota Tsolis-Katagas, Basilios Tsikouras, Tassos A. Grammatikopoulos, C. Katagas

    "Mineralogical techniques including microscopic methods, reflected and transmitted light microscopy, Cathodoluminescence (CL) and Scanning Electron Microscopy equipped with an Energy Dispersive Spectr

    Jan 1, 2003

  • AUSIMM
    GekkoÆs Gravity, Flotation and Intensive Leaching (GFIL) Process for Gold Recovery Improves Environmental and Cost Outcomes

    By T Hughes

    Upward pressure on all mining operations is coming from the triple bottom line. To some extent this is being offset by the rise in mineral prices, but this may or may not continue. The other serious i

    Jan 1, 2007

  • CIM
    The use of 3D modelling in re-examining the gold potential along the Porcupine-Destor Fault, Abitibi Subprovince, Quebec1

    By Marc Legault

    The Duparquet mining camp situated along the Quebec segment of the Porcupine-Destor Fault was the site of gold exploitation from 1933 to 1956 and 1988 to 1991. Numerous gold showings and deposits stra

    May 1, 2004

  • SME
    Method To Evaluate Liberation Characteristics Of Feed In A Jigging Plant

    By A. K. Mukherjee

    The roles of pulsating mechanisms such as the amplitude and frequency of the jig cycle are well established in jigging. Also well established are the roles of the size ratio and the volume fraction of

    Jan 1, 2008

  • AUSIMM
    Long-term Stability of Mine Tailings, Macraes Mine, Otago: Comparison to a Geological Analogue

    By D Craw

    Bulk ore tailings from the Macraes gold mine gold extraction process are stored in a large (ca 0.6 km2, 80 m deep) mixed tailings impoundment whose pH is maintained near 8 by natural rock neutralizing

    Jan 1, 2000

  • SME
    What it’s worth : A review of mineral royalty information

    By H. Lyn Bourne

    This is the fourth annual tabulation that gives mineral royalty information. The table presents previous information plus about two dozen new entries. In addition to the royalty information, some entr

    Jan 8, 1986

  • AUSIMM
    Project Delivery

    By E Skinner, G Lane

    Project delivery strategies are determined by project context, business case requirements, scale of project, market conditions, ownerÆs capability and preference, contractorÆs experience, resource and

    Jul 15, 2013

  • AUSIMM
    Avoid Average Design in Processing Plants

    The quantity, quality and detail of project information increases as project development moves from initial scoping level studies, to pre-feasibility and option studies, then definitive feasibility st

    Jan 1, 2004