Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Vessel Collision Design - Risk Analysis And Deep Foundation Issues For Bridges Over Navigable WaterwaysBy Michael A. Knott
Large lateral forces on bridge foundations due to extreme events such as vessel collisions, earthquakes, and wave forces on storm surges during hurricane events are often the controlling design condit
Jan 1, 2013
-
Atmospheric Corrosion of Extruded Silver Lead AlloysBy Hirst H, McAfee J
In December, 1934, Mr. R. Sussex extruded some silver lead alloy wires in order to determine their electrical resistance. After the determinations had been made each wire was threaded through a sheet
Jan 1, 1941
-
-
New geological and geotechnical considerations within the Interoceanmetal exploration areaBy Ivo Dreiseitl, Kondratenko. Anatoly
"The second prime area within the Interoceanmetal Joint Organization exploration area named H22 was delineated in 2013 with the goal to ensure sufficient nodule reserves for profitable mining operatio
Sep 1, 2014
-
Analyzing the Load-Transfer Behavior (T-Z Curve) for Instrumented Test Piles Driven in Clayey SoilBy Murad Y. Abu-Farsakh
This paper presents the analyses of load-transfer (t-z) behavior of twelve prestressed concrete (PSC) instrumented test piles that were driven in different locations of Louisiana. The load transfer me
Jan 1, 2018
-
The Code of Practice for Risk Management of Tunnel Works - Future Tunnelling Insurance from the InsurerÆs Point of ViewThe objectives of this paper are to introduce the International Code of Practice for Risk Management of Tunnel Works and to illustrate to the participants of the 13th Australian Tunnelling Conference
Jan 1, 2008
-
A Review Of Undergraduate Teaching And Postgraduate Research In Pyrometallurgy At The University Of StellenboschKeywords: Stellenbosch, university, teaching, research The pyrometallurgical activities at Stellenbosch University are reviewed in this paper. The history of the activities, both in teaching and r
Jan 1, 2006
-
Mining Systems and Technology - Synchronous Electric Drives for Grinding MillsMining Systems and Technology - Synchronous Electric Drives for Grinding Mills
Sep 13, 2010
-
Characterization Of Copper Flotation Products Utilzing The JKMRC/FEI Mineral Liberation Analyzer (MLA)By D. Brosnahan, J. Gathje
Newmont Metallurgical Services (NMS) recently acquired a Scanning Electron Microscope (SEM) with a JKMRC/FEI Mineral Liberation Analyzer (MLA). With the MLA software package, raw particle image and X
Jan 1, 2007
-
Evaluation Of Design Methods For Tieback Retaining Walls In Seattle - IntroductionBy John P. Turner
The behavior of tieback retaining walls depends on many factors, including soil properties, groundwater conditions, construction sequence, spacing and stiffness of tiebacks and soldier piles, tieback
Jan 1, 1990
-
Large Scale Ground Instability Caused By Failure of Underlying Pillars: A Case Study of Dynamic Multiple Seam InteractionBy Christopher Mark
Severe dynamic multiple seam interactions can occur when active mine workings are subsided by underlying mining activity. The most dramatic events are usually caused by longwall mining or pillar recov
Jan 1, 2012
-
Recent Gravity Improvements at the Porcupine Joint VentureBy Ron Millions, J. A. Folinsbee, Ishwinder Grewal, Michael Fullam, Don Strickland, Tony Y. Chong
"Since milling began in 1912, the Dome mill, now part of the Porcupine Joint Venture (PJV), has been expanded several times, the most recent increasing the milling rate from 3,500 to 11,500 tonnes per
Jan 1, 2004
-
OFR-62-78 Automated Continuous Miner Preliminary Design - Section I - IntroductionBy K. C. McMahon
This report is the result of the engineering efforts performed by the Mining Equipment Operations of FMC to develop methods of automating a continuous miner. This work was done as part of modification
Jan 1, 1975
-
Mejora de la productividad aplicando la mejora continuaBy Eder Salazar
El presente texto describe la optimización de la productividad en la empresa minera a través de la mejora contínua en la cadena de valor en SMEBSAA, los siete pasos de la calidad, proceso de mina, pla
Sep 12, 2005
-
Journal: Make a Good Impression / Pre-blast SurveysBy Sandra Penttinen
There are several ways to get a positive reaction from neighbors to blasting projects. When you need to enter structures to conduct a pre-blast inspection, the impression you make on the structure own
Jan 1, 2006
-
Soil Deformation Analysis During TBM Excavation: Comparing Three Different TBM Technologies Used During the Construction of the Toulouse Metro Line BBy Richard Kastner, Emilie Vanoudheusden, Fabrice Emeriault, Jacques Robert
INTRODUCTION The subway line B of Toulouse (France) has been realized with three different tunnel boring machines (TBM) techniques: Contracts 2 and 5 are excavated with earth-pressure balanced TBM
Jan 1, 2007
-
New Crystal Springs Bypass (Polhemus) Tunnel—Design ChallengesBy Roy C. Fedotoff, Jon Hurt, Gregg Sherry, Gilbert Tang
The 1,380 m (4,200 ft) long New Crystal Springs Bypass (Polhemus)Tunnel (NCSBT) will replace the existing Crystal Springs Bypass Pipeline. This tunnel project is part of the SFPUC’s $4.3 billion capit
Jan 1, 2007
-
New Innovations in Drilling and Bit Technology, "Integrated Sectional Drill Steel System"By Steve Collinsworth, Nils Heinke
In 1989, I realized the definite need for change in the Blast Hole Drilling Industry. With over 25 years of experience in dealing with the industry, I am well inGormed and educated concerning the prob
Jan 1, 1997
-
The Career of the Gold Dredge in New South WalesIt is now five years since the advent of gold-dredging in Australia, the State of New South 'Wales, or colony as it was, being the first to adopt this system of gold-getting, and the credit of it
Jan 1, 1904
-
Utilization Of Belt Air To Ventilate Working Sections In Underground Coal MinesBy F. Calizaya
This paper describes the basic requirements for the utilization of belt air to ventilate working sections at remote locations in relation to the main fans. It highlights the risks involved, potential
Jan 1, 2008