Search Documents

  • TMS
    Atomisation As A One Step Process For Hydrometallurgical And Flash Furnace Feed

    By David Norval

    Ni, Co, Cu and Pt, mattes are common materials that require granulating and milling of the resultant granules for further processing. This route is acceptable if the material is brittle (friable) whi

    Jan 1, 2006

  • NIOSH
    Developing Toolbox Training Materials For Mining - What Is Toolbox Training And Why Use It?

    By Floyd D. Varley, C. M. K. Boldt

    Toolbox training is often described as short, informal training conducted at a worksite by technically competent persons for the benefit of a work team. The key feature of toolbox training is the focu

    Jan 1, 2002

  • AUSIMM
    Blast Hole Diamond Drilling as Developed for Sub-Level Stoping at New Occidental Gold Mines, N.L., Cobar, N.S.W.

    By Creelman C. A

    With the technique and data obtained in using the blast hole diamond drill for "Removal of Horizontal Level Pillar by means of Blast Hole diamond drilling at New Occidental Gold Mines N.L.,"

    Jan 1, 1945

  • SME
    Nuclear Energy?s Future From A Uranium Producer?s Perspective

    Gary R. Steele is vice president, corporate marketing with Energy Fuels Resources. As such, he knows the global uranium market. The following are some of his thoughts on uranium?s place in the globa

    Jan 1, 2008

  • SAIMM
    Bindura Nickel Corporation Smelter Operations

    By E. Dzingayi

    Keywords: Pyrometallurgy, furnace, Bindura, nickel The smelter at Bindura Nickel Corporation processes concentrates from its own mines and other external sources. Concentrates are dried, smelted,

    Jan 1, 2006

  • NIOSH
    RI 3320 Diesel Mine Locomotives - Development And Use In European Coal Mines ? Introduction

    By George S. Rice

    In response to numerous requests for information as to the status of internal-combustion mine locomotives of the Diesel type that use heavy or non- volatile oil for fuel, with special reference to the

    Jan 1, 1936

  • AUSIMM
    Improvements in the Mercury Abatement and Process Efficiency of Adsorption, Desorption and Regeneration Gold Processing Operations

    By C Barton, B Randall, T Weldon, M Lefler

    FLSmidth-Summit Valley Technologies has been a leader in gold processing equipment for nearly two decades. Over the past several years an extensive research and development effort has led to improveme

    Jul 15, 2013

  • SME
    The Dulles Corridor Metrorail Project—Extension to Dulles International Airport and Its Tunneling Aspects

    By V. Gall, J. Rudolf

    The Virginia Department of Rail and Public Transportation and the Metropolitan Washington Airports Authority are undertaking the extension of Washington Metropolitan Area Transit Authority’s Metrorail

    Jan 1, 2007

  • SME
    Vendors Show Off Latest in Mining Technology at SME Exhibit

    By Georgene Renner, William R. Yernberg, Steve Kral

    ABB offers complete electrical revamps of mining shovels with ac or dc drives, drive control, frequency converters with insular gate bi-polar transistor technology, intelligent control packages and vi

    Jan 1, 2005

  • IIMP
    Administración y optimización de operaciones de Heap Leaching haciendo uso de un simulador de procesos en Minera Yanacocha

    By Pedro Condori

    Usualmente, la minera Atacocha está expuesta a grandes precipitaciones pluviales durante una larga temporada húmeda. Por lo que es necesario eliminar gran parte del agua colectada por las lluvias a tr

    Sep 9, 2007

  • SME
    Preliminary Rib Support Requirements for Solid Coal Ribs Using A Coal Pillar Rib Rating

    Researchers from the National Institute for Occupational Safety and Health (NIOSH) are developing a coal pillar rib rating (CPRR) technique to measure the integrity of coal ribs. The CPRR characterize

    Jan 7, 2020

  • NIOSH
    IC 6796 Apparatus and method for determination of helium in natural gas

    By C. C. Anderson

    "While conducting investigations in connection with the helium program of the Bureau of Mines, the Cryogenic Laboratory has improved an apparatus for the rapid and accurate determination of the helium

    Jun 1, 1934

  • SAIMM
    Mineralogical Solutions For Pyrometallurgical Problems

    By L. Andrews

    Keywords: mineralogy, phase-chemical, chemical-looping combustion, XRD, SEM, EDS, QEMSCAN, PGM, slag, matte, ilmenite Mineralogy, traditionally associated with concentrator studies, is being incre

    Jan 1, 2011

  • SAIMM
    Modular Mixer-Settlers for SXPlant Sustainability

    By Henri Fredriksson, Rami Saario, Mark Weatherseed, Juri Matinheikki

    "The challenges facing the mining industry include complex ores and declining grades, together with increasing capital costs and environmental regulations. In addition, future commodity price uncertai

    Jan 1, 2015

  • AUSIMM
    Geometallurgical Challenges of Namakwa Sands û A South African Titanium-Zirconium Heavy Minerals Mine

    By A Rozendaal

    Namakwa Sands, a heavy minerals beneficiation business situated along the west coast of South Africa, is a major producer of titanium slag, pig iron, ceramics quality zircon and rutile concentrate to

    Jan 1, 2008

  • CIM
    Rock Strength Characterization for Excavations in Brittle Failing Rock

    By B. H. Kim

    It is hypothesized that the standard approach adopted to characterize the ground and to determine the rock strength properties at depth are flawed and generally tend to underestimate the rock strength

    May 1, 2009

  • SME
    Environmental Assessment Study For Extension Of Spadina Subway In Toronto

    By Verya Nasri, Scott Thorburn

    The City of Toronto and the Toronto Transit Commission (TTC) have conducted an Individual Environmental Assessment (EA) for a 6.2 km, 4-station underground extension of the Spadina Subway from Downsvi

    Jan 1, 2007

  • NIOSH
    Comparison Of Ore Pass Computer Simulations For Designs Against Dynamic Load

    By K. Biswas, S. Iverson, S. J. Jung

    Computer modeling of rock flow in ore passes is being investigated and compared using MSC Soft-ware’s Working Model 2D1 (WM2D) and Itasca Corp.’s Particle Flow Code in Two Dimensions (PFC2D). This wo

  • ISEE
    Expansion of the Panama Canal

    By Tom Treleaven

    The widening of the Panama Canal to approximately 130 feet (40 m) for its entire length began just a few years ago. The original expansion program was slated for completion in 18 to 20 years, but has

    Jan 1, 1997

  • SME-ICGCM
    Work Practices to Manage Bump Prone Ground

    By Floyd Varley

    In deep and highly-stressed coal mining, advanced design practices are used to minimize the potential for damaging events to occur. Despite these design efforts, the hazard of coal mine bumps can not

    Jan 1, 2008