Search Documents

  • CIM
    The Link between Pulp Zone Hydrodynamic Characteristics and Froth Stability in a 125 m3 Flotation Column

    By D. Knuutila, G. Goyette, James A. Finch, G. Bartolacci, A. Fortin, Chi Ho Lau, A. Lockhart

    "In a COREM-McGill collaborative research and development project, gas dispersion parameters and froth properties were manipulated in a copper flotation plant to study interactions between the collect

    Jan 1, 2008

  • CIM
    Update of Chilean Mining Projects and Technological Trends

    By C. Cornejo, C. Schuffeneger, J. Rosas

    "At the end of 2010 the AMSA Esperanza Concentrator started commissioning. Located in the Atacama Desert this project is the first of several large size concentrators developed recently to operate in

    Jan 1, 2012

  • SME
    Cable-Shovel Dipper Dynamics

    By M. A. Raza

    Cable shovels are capital-expensive and primary production equipment in many surface mines. The forces acting on the shovel dipper vary as the dipper moves through the muck-pile. The variations in the

    Jan 1, 2011

  • TMS
    A Study on the Mechanism of Magnetite Formation Based on Iron Isotope Fractionation

    By Payman Roonasi

    Having knowledge of mechanism of magnetite formation is essential in a number of industrial processes including magnetite synthesis and corrosion of iron. In this study, magnetite nanoparticle was syn

    Jan 1, 2009

  • NIOSH
    RI 4878 Investigation Of Gas Explosions In Brighton, N.Y. September 21, 1951

    By G. W. Jones

    From evidence made available during the investigation, it was concluded that the first of a series of explosions occurred at 1:15 to 1:20 p.m. September 21, 1951, in an underground vault that housed p

    Jan 1, 1952

  • DFI
    Liquefaction Mitigation Synthesis Report

    By Timothy C. Siegel

    This report presents the results of a synthesis on the design and analysis of ground improvement for liquefaction mitigation. The synthesis included an industry survey concerning the practice of groun

    Aug 1, 2013

  • NIOSH
    IC 9371 Aluminum Availability And Supply - A Minerals Availability Appraisal

    By David R. Wilburn

    The U.S. Bureau of Mines investigated the resources, costs, capacities, market relationships, and short-and long-term supply of bauxite, alumina, and aluminum. The 45 evaluated mines and deposits in 1

    Jan 1, 1993

  • CIM
    Insurability of Large Gearless Mill Drives

    By L. Bos

    The availability and reliability of large grinding mills and their Gearless Mill Drives (GMDs) are of paramount importance for the grinding process. Although GMDs have been in service for decades, and

    Jan 1, 2012

  • IIMP
    Teck – Aurubis: Un enfoque integrado desde la mina hasta el metal para desarrollar depósitos de cobre con alto contenido de arsénico usando el proceso CESL

    By Keith Mayhew

    Ante la alta demanda de cobre por el crecimiento urbano e industrial y para la construcción de infraestructuras, la industria del cobre necesita una solución para el desarrollo sustentable de los recu

    Sep 12, 2011

  • NIOSH
    OFR-50(5)-75 Evaluation Of Mill Tailings Disposal Practices And Potential Dam Stability Problems In The Southwestern United States - Reconnaissance Report, Volume Five

    This report presents the results of reconnaissance-level investigations of the mill refuse disposal systems for 15 plants throw-heat the conterminous United States. The sites visited represent a cress

    Jan 1, 1974

  • SME
    Design And Preliminary Testing Of Low-Energy Planetary Excavator - Preprint 09-134

    Development of a permanent human base on the Moon for exploration requires a self sustaining system. This entails production and processing of limited amounts of raw material on the Moon. Any mining a

    Jan 1, 2009

  • NIOSH
    RI 5612 Tungsten Resources Of Montana: Deposits Of The Philipsburg Batholith, Granite And Deer Lodge Counties ? Summary

    By D. D. Walker

    Scheelite, the most abundant tungsten mineral in the Philipsburg region of Montana, is found in replacement deposits and along fissures and cracks in limestone at various distances from contacts with

    Jan 1, 1960

  • ISEE
    Usability of Expert System Integrated With GIS in Blasting Operations

    By U. Gorkhan Akkaya, N. Enver

    Geographic information system (GIS) is one of the most accurate and useful tools to help decision – making for decision-makers. As to expert systems, it provides solutions to the problems faced by mim

    Jan 1, 2013

  • SME
    Computational Fluid Dynamics Modeling Of Spontaneous Heating In Longwall Gob Areas (SME Annual Meeting Feb. 25-Feb. 28, 2007, Denver, CO )

    By L. Yuan, A. Smith

    In order to provide insights for the optimization of ventilation systems for U. S. underground coal mines facing both methane control and spontaneous combustion issues, a computational fluid dynamics

    Jan 1, 2007

  • CIM
    Management of Copper Solvent Extraction Plants Running At Reduced Throughput

    By D. Kachongo, Y. Cheng, A. Kashala, D. Samal, G. Mitshabu

    Many copper processing flowsheets in the Democratic Republic of Congo include the leaching of oxide ores containing copper and cobalt, copper solvent extraction, copper electrowinning, and precipitati

    Jan 1, 2019

  • AUSIMM
    A Case Study on Mine Subsidence Due to Multi-Seam Longwall Extraction

    The case study has identified and characterised additional subsidence arising from longwall mining above or under existing longwall goaf. It suggests that the magnitude, mechanisms and prediction meth

    Nov 25, 2010

  • AUSIMM
    Some Results of Mechanised Mining of Coal in the Western Coalfield of New South Wales

    Total mechanisation in the Western district of New South Wales is quite a recent addition to productive methods in that State, for it was only in 1940 that the first colliery was equipped for this met

    Jan 1, 1954

  • NIOSH
    OFR-22-76 Technical And Economic Study Of An Integrated Single Pass Mining System For Open Pit Mining Of Deep Oil Shale Deposits ? Phase I Report ? Section I. Summary

    By Carlie E. Banks

    Tasks during Phase I of this contract effort were performed in four principal functional areas. These were geology, hydrology, reclamation and mining. Data were gathered from literature reviews, mine

    Jan 1, 1975

  • NIOSH
    RI 8928 - Large-Scale Dewatering of Phosphatic Clay Waste From Northern Florida

    By Annie G. Smelley

    The Bureau of Mines is testing a dewatering technique for phosphatic clay waste that will recover a portion of the water lost using conventional waste disposal methods and produce solids suitable for

    Jan 1, 1985

  • CIM
    Real Time Analysis of Conveyed Bulk Materials for Optimized Plant Performance

    By H. Powell

    "This paper discusses how elemental analysis of conveyed bulk flows in real time using PGNAA (Prompt Gamma Neutron Activation Analysis) technology has resulted in significant improvements in advancing

    Jan 1, 2014