Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Image Analysis of Froth for Improved FlotationBy L. B. Hales
Color video or digital cameras have been installed over flotation cells to monitor color, bubble size, froth movement, and other characteristics. These systems are designed so that the camera provides
Jan 1, 1999
-
Optimization Of Waterjet Systems For Mining ApplicationsBy James M. Reichman
Waterjet assist of mechanical cutters has been demonstrated in a variety of laboratory studies as well as on field equipment. As this technique becomes more widely accepted, it will be necessary to de
Jan 1, 1985
-
The Future Role Of The Mining Company In The International Arena ? IntroductionBy Gordon R. Haworth
During the past ten years we have experienced a period of rapidly-changing ground rules for the mining industry. Domestically we have had to contend with numerous new regulations controlling the impac
Jan 1, 1975
-
A Probabilistic Method For Mine Heat PredictionBy A. D. S. Gillies
The provision of a suitable working environment in deep level mines requires the accurate prediction of the ventilation heat load. Mathematical models for predicting strata heat load have been under d
Jan 1, 1987
-
Control Systems For Canadian Coal Preparation PlantsBy J. P. Matoney
The operation of a modern coal preparation plant, particularly in western Canada, is a very complex task. Most western Canadian operations are processing two or more, sometimes up to ten, different se
Jan 1, 1983
-
Selling Forward Increases Profits For Gold ProducersBy Thomas D. Kaufmann
Whether pursuing hedging or speculative strategies, gold miners can increase sales revenues 1 % to 6% by constantly pricing production forward. Unlike other commodities, gold futures prices are consis
Jan 1, 1991
-
Process Flowsheet Development For The Pullalli ProjectBy Jaye Pickarts, Bret Boster, Jack McPartland
Pegasus Minera de Chile, Ltda. is completing three phases of metallurgical evaluation on the Pullalli project to develop a preliminary process flowsheet. A project feasibility study is in progress. Th
Jan 1, 1996
-
Support Vehicles For Rubber-Tired Underground MiningBy William G. Doepken
The extensive use of rubber-tired support vehicles as a complement to a fleet of load-haul-dump and drill jumbo units has proved invaluable in maintaining scheduled multilevel/multiheading development
Jan 1, 1976
-
Capillary cover design for leach pad closureBy K. Burke, G. Zhan, A. Mayer
A cover with capi1lary barrier effects (CCBE) is being constructed an the AA leach pad at the Barrick Goldstrike mine near Carlin, Nevada. The purpose of the cover is to eliminate/minimize infiltratio
Jan 1, 2002
-
Vibration Screens For Dewatering - Theory And PracticeBy W. Stahl, K. Keller
In addition to classifying bulk material, vibration screens are commonly used in dewatering. However, the lack of a comprehensive physical theory of dewatering often leads to difficulties in the desig
Jan 1, 1998
-
An Expert Control System for Phosphate BeneficiationBy Randy Ynchausti
ERIC GUTIERREZ, Knowledgescape: Our next speaker is Randy Ynchausti. He's the director of development, Knowledgescape systems division, of EIMCO Process Equip- ment Company. The title of Randy&ap
Jan 1, 1998
-
Soft Ground Tunnels For The Bart ProjectBy Thomas R. Kuesel
All engineering designs are based on assumptions regarding the behavior of the structure or facility being designed. These assumptions may be based more or less heavily on theory, but are credible onl
Jan 1, 1997
-
Proper Gear Drive Specifications for Conveyor ServiceBy Ronald J. Doll
The selection and matching of the conveyor drive components (Figure 1) determine the initial cost, long term costs, and how well the drive performance is matched to a project's long term producti
Jan 1, 1998
-
Comparison Of Continuous Countercurrent Decantation And Filtration In Soluble RecoveryBy R. C. Emmett
In extractive metallurgy, separation of insoluble solids from solutions is an important economic factor in almost all flow- sheets. This separation step can employ sedimentation, filtration (vacuum an
Jan 1, 1974
-
PM-10 Source Apportionment for Mining OperationsBy John G. Watson, Judith C. Chow, Richard T. Egami, Daniel L. Freeman
A methodology for apportioning ambient PM-10 (particulate matter) concentrations to sources is described and applied to PM-10 concentrations in the vicinity of a large gold mining operation. With this
Jan 1, 1991
-
A Microcomputer Network For Autonomous Mining ResearchBy William H. Schiffbauer
Research is being conducted toward making underground mining equipment autonomous. This will facilitate improvements in safety by relieving workers of dangerous tasks and will increase production by p
Jan 1, 1989
-
The Business Unit Model for Mining CompaniesBy Bruce D. Hansen
The complexity of large geographically diverse or multicommodity mining companies requires a corporate structure, which provides the maximum long-term effectiveness. Structure models exist along the s
Jan 1, 2001
-
A Maintenance Scheduling Policy For Mining EquipmentBy E. Topuz
Mining equipment, like all other equipment, is subject to failure. Since most failures occur at random and are unexpected, corrective maintenance is usually more expensive and causes more down-time th
Jan 1, 1982
-
VLF Emergency Warning System for Underground MiningBy J. Scott McDougall, J. Herman P. Eng. Vanderlaag
An underground mine fire can seriously threaten the lives of all personnel in the mine. This fact makes fire emergency planning a high priority in the mining industry. The optimum warning alarm must b
Jan 1, 1995
-
Simulation For Equipment Sizing, Longwall To StockpileWhen longwall equipment is being specified, a nominal capacity is generally given on which to base the design of the various face and out-bye systems and components. This capacity generally comes from
Jan 1, 2008