Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME
    Advances In Process Plant Automation

    By E. S. Bianchin

    The more complex control needs of today's mineral processing plants combined with ever-changing digital technology have brought numerous improvements to process control systems. This paper disc

    Jan 1, 1988

  • SME
    Techniques To Understand Metal Leaching From Ore Minerals In Mine-Waste Material

    By S. F. Diehl

    Suites of monomineralic sulfide and carbonate minerals, as well as mine-waste composite samples, were analyzed using chemical and microanalytical techniques to understand behavior and bioavailability

    Jan 1, 2010

  • SME
    Laboratory Demonstration of DPM Mass Removal from an Exhaust Stream by Fog Drops

    By Z. Henderson, J. Saylor, L. R. Mendoza

    "Diesel particulate Matter (DPM) is a byproduct of fuel combustion in diesel engines. It is classified as a carcinogen, with associated respiratory and cardiovascular health effects. The composition,

    Jan 1, 2017

  • SME
    Agglomeration And Materials Handling At The Cactus Gold Mine Kern County, California

    By J. J. Antony

    The Cactus Gold Mine is a joint venture comprised of Middle Buttes Partners Ltd. (CoCa Mines, Inc.--operator, T. Congdon and W. Carey) and Compass Mining, Inc. The project includes 2.4 sq. miles of co

    Jan 1, 1988

  • SME
    Controlled Recirculation Of Mine Air In A South African Colliery.

    By C. F. Meyer

    The recirculation of mine air in an underground colliery, has always been regarded as a hazardous practice in South African collieries. The Mines and Works Act and Regulations states that fresh air, f

    Jan 1, 1993

  • SME
    Distribution -The Weak Link in Paste Backfill

    By Andrew Mackenzie, Paul Rantala

    Data is now appearing in literature that indicates many current paste fill systems in Canada suffer from plugged lines and severe wear rates. Both of these conditions suggest: design problems with the

    Jan 1, 2001

  • SME
    Successful Project Team Integration for Riverside Badlands Tunnel

    By Drupad B. Desai, James G. Gallanes

    A key component of the Inland Feeder Project is the Riverside Badlands Tunnel, a7.9-mile stretch subjected to high internal and external hydraulic pressures passing beneath highly eroded hills in a se

    Jan 1, 1997

  • SME
    Effects of the Constant Mine Strata Temperature Assumption and Initial Mine Air and Strata Temperatures on Refuge Alternative Internal Air Temperature

    By P. T. Bissert, L. Yan, M. D. Klein

    "Federal regulations require the installation of refuge alternatives (RAs) in underground coal mines. Mobile RAs have a limited ability to dissipate heat, and heat buildup can lead to a life-threateni

    Jan 1, 2016

  • SME
    Environmental Liability In Project Construction And Management

    By M. S. Bickers

    Prior to 1970, the environmental liabilities associated with mine construction and management were few. Mostly, they were aimed at health and safety matters. At that time less than two dozen codes wer

    Jan 1, 1988

  • SME
    The Flexibility Of CFB Roasting

    By Eberhard Stolarski, Michael Tacke

    When the oxidized surface gold deposits are mined out, the underlying refractory gold ores become the challenge of treat­ment systems. The size and value ofrefractory gold ore reserves are a function

    Jan 1, 1996

  • SME
    Sonic Flotation of Phosphate Ores

    By C. E. Jordan, B. J. Scheiner

    The Bureau of Mines has developed a continuous ultrasonic flotation cell for the recovery of Florida phosphate ore. Within a small mixing chamber near the bottom of the flotation cell, an ultrasonic p

    Jan 1, 1989

  • SME
    Coal Pillar Rib Stability: A Regression ModelBased on Distinct Element Method

    By Alper Kirmaci, Taghi Sherizadeh, Dogukan Guner, Samuel Nowak, Khaled Mohamed, Morgan Sears

    Coal ribs present a major safety hazard in underground mines, and there is currently no unified approach for their design in the United States. To tackle this issue, this study investigated the stabil

    Jul 1, 2023

  • SME
    Increasing the Specific Surface Area of Dolomite by Stirred Ball Milling

    By Eric Forssberg, Ming-wei Gao

    Four parameters of the Drais stirred ball mitt, i.e., bead load, bead size, flow rate and top feed size have been studied regarding their influence on the specific surface area. A factorially designed

    Jan 1, 1992

  • SME
    A Shear-Wave Seismic System to Look Ahead of a Tunnel Boring Machine

    By Pawan Bharadwaj, Wim Mulder, Thomas Tscharner, Guy Drijkoningen, Rob Jenneskens

    "The Earth’s properties, composition and structure ahead of a tunnel boring machine (TBM) should be mapped for hazard assessment during excavation. We study the use of seismic-exploration techniques f

    Jan 1, 2016

  • SME
    Optimization of the Drive System for a Cyclone Feed Pump

    By L. Galarza

    "INTRODUCTION Beneficiation of ores and minerals in a concentrator plant requires a significant amount of water [1] for the grinding and particle separation processes; most of it ends up being recircu

    Jan 1, 2015

  • SME
    Trolley Assist For Diesel-Electric Haulage Trucks

    By John E. Miller

    In recent years there has been increasing concern in the mining industry over the availability and high cost of diesel fuel to support mining operations. Unit Rig & Equipment Co. has been deeply inv

    Jan 1, 1980

  • SME
    Primary Support Design For Large Span Tunnels in Weak Rock: The Melbourne City Link Tunnels

    By S. J. Porter, M. T. McRae

    The Melbourne City Link project includes two three-lane highway tunnels, 1.6 and 3.4km long, respectively, which are both approximately 16 meters wide and 9 meters high. The tunnels will be excavated

    Jan 1, 1997

  • SME
    Ultimate Recovery In Heap Leaching Operations As Established From Mineral Exposure Analysis By X-Ray Microtomography

    By C. Garcia, H. Arias, J. D. Miller, C. L. Lin

    The question of ultimate recovery in heap leaching operations is always of particular concern with respect to economic considerations. Of course the particle size distribution is a critical factor whi

    Jan 1, 2002

  • SME
    Stress Distribution Characteristics and Energy Evolution Law of Drilling Pressure Relief

    By Ke Yang, Kai Zhang, Xiaolou Chi, Xiangyang Zhang, Yingming Li

    Based on the research background of 1303 working face return air roadway in Jinyuan Zhaoxian Mine, Shaanxi Province, a method of determining the reasonable spacing of boreholes is proposed based on th

    Jun 25, 2024

  • SME
    Cost Calculation for Horizontal Cut-and-Fill Mining

    By Gordon M. Pugh, David G. Rasmussen

    INTRODUCTION Variations of cut-and-fill stoping are the most com¬monly used methods for mining narrow, nearly vertical veins in the United States. These methods offer the best results for maximum r

    Jan 1, 1982