Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Connection of TARP Tunnel to Thornton Quarry ReservoirBy Djavid Mohammad
Over the next several years, the storage capacity of the Metropolitan Water Reclamation District of Greater Chicago?s Tunnel and Reservoir Plan will be increased by 14.8 billion gallons through the ad
Jan 1, 2008
-
Overview presented of mineral exploration and development activities in the southwest PacificBy Paul D. Klipfel
Introduction Mineral exploration interest, principally for gold, in the south-western Pacific has surged to new proportions. This is primarily due to the application of epithermal exploration concept
Jan 10, 1987
-
Selective Flocculation Of Fine Phosphate Materials (8c939b54-ad68-4cf0-a2e6-037610cedf74)By H. Sis, D. Dahlin, S. Chander, C. Summers
Bench-scale selective-flocculation tests were conducted on samples of Florida and Western phosphate process tailings. Physical, mineralogical, and surface characteristics were determined for both typ
Jan 1, 2002
-
In-Mine Evaluation Of Smart Mine Fire Sensor (e0413569-6dc4-41a0-bd26-5c60fdfe0934)By R. A. Franks
An evaluation of a nuisance-emissions-discriminating smart mine fire sensor system was made in an operating coal mine. These field evaluations were conducted to determine the sensor system?s ability
Jan 1, 2008
-
Validation of the Predicted Heat Strain Model in Hot Underground Mines Mining, Metallurgy and ExplorationBy Paloma Lazaro, Moe Momayez
Heat-related illnesses (HRI) are relatively common in both hot surface and underground mining operations. When workers are exposed to extreme heat or strenuous work in a hot environment, they become p
-
Validation of the Predicted Heat Strain Model in Hot Underground Mines Mining, Metallurgy and Exploration (b1204250-b5e6-44a6-902f-6383dbcaf5a3)By Paloma Lazaro, Moe Momayez
Heat-related illnesses (HRI) are relatively common in both hot surface and underground mining operations. When workers are exposed to extreme heat or strenuous work in a hot environment, they become p
-
Gas Mitigation In The Mill Creek TunnelBy R. Switalski, M. Schafer, R. Pintabona, M. Kritzer, B. Lukajic, S. Janosko
Methane gas caused an eight-month shutdown of mining operations at the Mill Creek, Phase 3, Tunnel. The gas-related shutdown occurred as the tunnel was advanced to an approximate distance of 2,700 fee
Jan 1, 2007
-
Accelerated Weathering Of Limestone For CO2 Mitigation: Opportunities For The Stone And Cement IndustriesBy William H. Langer
Large amounts of limestone fines co-produced during the processing of crushed lime-stone may be useful in the sequestration of carbon dioxide (CO2). Accelerated weathering of limestone (AWL) is propos
Jan 1, 2009
-
Small Diameter Tunneling?Pipe Jacking Under Leipzig Main Train StationBy Klaus Rieker
The main train station of Leipzig in Germany is currently being upgraded from a head station to a partially thru station. In order to achieve this, significant ground improvements are necessary. Soil
Jan 1, 2008
-
Inability to communicate : How technical professionals cut short their management careersBy H. Richard Eisenbeis, Donna M. Watkins
Many technical professionals (tp)* desire to occupy upper level management positions. But career paths for most scientists and engineers do not extend beyond their specific disciplines. This is unfort
Jan 8, 1987
-
Utilization of Strain Measurements on Shielded Tunnel Boring MachinesBy Brad Murray
Evaluating the performance of a shielded tunnel boring machine (TBM) can be difficult because the ground cannot be observed directly and in relation to the TBM attitude within the excavation. It is di
Jan 1, 2008
-
Adeco As An Alternative To NATM: How It Works, WHY It WorksBy Fulvio Tonon
And Rabcewicz said ?tunnels should be driven full face whenever possible.? ADECO, which stands for ?Analysis of Controlled Deformations in tunnels,? now allows us to fulfll Rabcewicz?s dream in any st
-
Maintenance Contract on Cat 785 Trucks Works Well at Round MountainBy J. B. Rasmussen
As part of a purchase of a fleet of Caterpillar 785 trucks, Round Mountain Gold Corp., Cashman Equipment Co. and Caterpillar Inc. entered into a four-year contract for the major maintenance of the fle
Jan 1, 1991
-
The Issue of Collecting and Reporting SD Indicators in the Minerals Sector from the Point of View of Small and Medium-Sized Companies and those not Publicly TradedBy C. Sykes, E. Turner, M. Wyart-Remy
This paper follows that of the Milos Conf, 2002 and examines the collection and reporting of SDIs in the industrial minerals industry in Europe. It compares the characteristics of the GRI Reporting Gu
Jan 1, 2005
-
EPB Tunnel Boring Machine Design For Boulder ConditionsBy Craig Bournes, David Chapman, Michael DiPonio
Historically, boulders are a frequent source of problems in soft ground tunneling. During tunnel construction, the need to manually break and remove boulders as obstructions causes delays to the proje
Jan 1, 2007
-
The borehole monitoring experiment: field measurements of reservoir conditions and responses in longwall panel overburden during active miningBy S. J. Schatzel
In order to better understand the effects of longwall mining on the methane reservoir overlying the panel, the National Institute for Occupational Safety and Health/Pittsburgh Research Laboratory (NIO
Jan 1, 2009
-
Minnesota Iron Mining Industry Looks at ChangeBy William R. Yernberg
The combined 76th Annual Minnesota Section of SME meeting and 64th Annual University of Minnesota Mining Symposium were held April 8and 9, 2003, in Duluth, MN. This year’s theme was “Stakeholders, Par
Jan 1, 2003
-
Case Study Failure Of Shallow Open Pit Slopes Shirley Basin MineBy R. M. Owens, J. F. Lupo
The Shirley Basin Uranium mine, located in southeastern Wyoming, USA, was an open pit mining operation consisting of a series of several open pit mines excavated into poorly consolidated sandstones, s
Jan 1, 2001
-
Design, Testing, and Production of Steel Fiber Reinforced Concrete Segmental Tunnel Lining for the East Side Combined Sewer Overflow TunnelBy K. Wongaew, R. F. Cook, J. E. Carlson, T. Cleys, C. R. Smith
Steel fiber reinforced concrete segmental rings are the final tunnel lining for approximately 85% of the alignment for a 6.706-meter (22-foot) internal diameter tunnel being built as part of the East
Jan 1, 2007
-
St. Cloud Mining Company’s Stone House Zeolite Mine And New Uses For ClinoptiloliteBy G. S. Austin
The St. Cloud Mining Company extracts clinoptilolite about 6.5 km south of Winston, Sierra County, New Mexico. Production is about 18,000 mt/year. Natural zeolites are good adsorbents for positively c
Jan 1, 2002