Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Technological Change Yields Beneficial Process Improvement For Low Carbon Ferrochrome At Zimbabwe AlloysBy N. R. Shoko, J. Chirasha
Zimbabwe Alloys has been producing Low Carbon Ferrochrome since 1953. A number of operational and technical advances have been made since then. Some of these advances improved production significantly
Jan 1, 2004
-
Support system performance under different corrosion conditions - SynopsisThis paper reports on recent field observations on the performance of support systems under different corrosion environments in Canadian underground mines. Phenomenological data are used to gain a bet
Jan 1, 2008
-
Coal And Coal Preparation In South Africa - A 2002 ReviewBy D. Peatfield
The design and operation of coal preparation plants are governed by the inherent quality of the raw coal to be processed, market specifications and the saleable tonnage requirements. Topography influe
Jan 1, 2003
-
Forecasting of self heating of coal in underground workingsBy J. Cygankiewicz
Efficient prevention of mine fires is impossible without predicting the self heating processes in the given geological and mining conditions. The respective forecasting method is presented in this pa
Jan 1, 2003
-
Electrical Energy Management In The Ferroalloy BusinessBy P. J. Brereton-Stiles, M. S. Rennie, N. Singh
Ferroalloy producers are large-scale users of electrical energy, which in many countries is in short supply and increasingly expensive. Preheating and/or pre-reduction using natural gas, recycled furn
Jan 1, 2004
-
Role of Metal Accounting in Assessing and Managing the Business Risks Involved in Production PlanningBy Donald Leroux, Simon Gariépy, Luc Lachance
"Quantitative information about the quality of metal balance results is often overlooked when making important plant production planning decisions. Not only is this common omission made in a context w
Jan 1, 2015
-
The application of new design concepts in high tension electrostatic separation to the processing of mineral sands concentratesBy D. M. MacHunter, T. Lawson, D. K. Henderson
The development and commercialization of new generation high tension electrostatic separators has provided a basis for simplifying mineral separation plant circuitry. The inclusion of new design f
Jan 1, 2003
-
Measurement And Control Of Arcing In A Submerged-Arc FurnaceBy P. J. Brereton-Stiles, C. J. Hockaday, I. J. Barker, M. S. Rennie
This paper reports on studies that have been done on the electrical conduction in silicon, ferro silicon, and charge chrome furnaces. A system has been developed that can distinguish between normal r
Jan 1, 2007
-
Continuous improvement management for mining companiesBy M. Mikolás, L. Pomothy, K. Špakovská, M. Vanek
"Enterprises are faced with increasing economic competition and managers are obliged to look for methods that will ensure a competitive edge in their companies’ markets. These methods include manageri
Jan 1, 2015
-
Interaction Between The Block Cave And The Pit Slopes At Palabora MineBy Peter Townsend, Sergei Diachenko, Allan Moss
The Palabora Mining Company has successfully extended the life of its operation by developing a 30,000tpd block cave underground mine below the now closed open pit. The process of transitioning from
Jan 1, 2006
-
Reduction Of Chromite Ore At Different Flow Rates Of Inert GasBy Dolly Chakraborty, S. Ranganathan, S. N. Sinha
Pre-reduction of chromite outside the submerged-arc furnace (SAF) can significantly lower the specific power consumption in the SAF process. Conventional processes for the pre-reduction of the ore ope
Jan 1, 2007
-
Hard rock tunnel boring, cutting, drilling and blasting: rock parameters for excavatabilityBy K. Thuro, R. J. Plinninger
ABSTRACT: Determining tunnel stability is a key issue during preliminary site investigation. In contrast, problems of excavatability have been largely ignored. While the choice of an economic tunnelli
Jan 1, 2003
-
The Behaviour Of Coke In Submerged Arc Furnace Smelting Of FerromanganeseBy S. Kamalpour
It has been observed that the productivity of ferromanganese furnaces, and the stability of metal and slag compositions, vary considerably according to the type of coke used as reductant. However, the
Jan 1, 2004
-
Performance Enhancement Tools For Grinding MillsBy W. Valderrama, D. G. Almond
Operation of large SAG mills requires a change in the conceptual approach to grinding processes. The traditional energy consumption criteria are now enhanced with new criteria derived from the mechani
Jan 1, 2004
-
Rockfall Hazard Evaluation Using Probabilistic Keyblock AnalysisGravity-driven rock falls account for a large proportion of all fatalities and injuries in underground mines. Potentially unstable blocks of rock are found in the hanging wall of excavations, which ma
Jan 1, 1998
-
Mathematical Model Of Heat And Mass Transfer In The Steel Belt Sintering ProcessBy T. Fabritius, L. Hekkala, J. Härkki
The Outokumpu steel belt sintering technology is used for manufacturing chromite pellets that are charged into smelting furnace for ferrochromium production. Hot air is blown through the moving bed of
Jan 1, 2004
-
An Overview Of Current Manganese And Chromium Ferroalloy Production In RussiaBy V. I. Zhuchkov, L. A. Smirnov, E. I. Arzamastsev, A. A. Babenko
A brief analysis is given for state-of-the-art of manganese and chromium ferroalloy production in Russia and their consumption by metallurgy plants. The main causes of low output of manganese an
Jan 1, 2004
-
Strategic Long Term Planning In Mining - SynopsisBy G. L. Smith
The fundamental challenge facing mineral and metal companies is how to create sustainable value while operating within mandated strategic bounds, identified constraints, and variable market and econom
Jan 1, 2012
-
Double-header trains at Great Noligwa mine - SynopsisBy L. van Dyk
The project was aimed at evaluating the double-header trains implemented at Great Noligwa mine, looking at the changes from the old conventional trains to the new trains, and identifying possible impr
Jan 1, 2008
-
A Twin-Cathode Dc Arc Smelting Test At Mintek To Demonstrate The Feasibility Of Smelting FeNi From Calcine Prepared From Siliceous Laterite Ores From Kazakhstan For Oriel Resources PlcBy H. Lagendijk, I. J. Reinecke
Mintek was contracted by Oriel Resources plc in 2004 to conduct a preliminary assessment study on smelting ferronickel from the large but relatively low grade Shevchenko nickel ore deposit in Kazakhst
Jan 1, 2007