Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SAIMM
    Technological Change Yields Beneficial Process Improvement For Low Carbon Ferrochrome At Zimbabwe Alloys

    By N. R. Shoko, J. Chirasha

    Zimbabwe Alloys has been producing Low Carbon Ferrochrome since 1953. A number of operational and technical advances have been made since then. Some of these advances improved production significantly

    Jan 1, 2004

  • SAIMM
    Support system performance under different corrosion conditions - Synopsis

    This paper reports on recent field observations on the performance of support systems under different corrosion environments in Canadian underground mines. Phenomenological data are used to gain a bet

    Jan 1, 2008

  • SAIMM
    Coal And Coal Preparation In South Africa - A 2002 Review

    By D. Peatfield

    The design and operation of coal preparation plants are governed by the inherent quality of the raw coal to be processed, market specifications and the saleable tonnage requirements. Topography influe

    Jan 1, 2003

  • SAIMM
    Forecasting of self heating of coal in underground workings

    By J. Cygankiewicz

    Efficient prevention of mine fires is impossible without predicting the self heating processes in the given geological and mining conditions. The respective forecasting method is presented in this pa

    Jan 1, 2003

  • SAIMM
    Electrical Energy Management In The Ferroalloy Business

    By P. J. Brereton-Stiles, M. S. Rennie, N. Singh

    Ferroalloy producers are large-scale users of electrical energy, which in many countries is in short supply and increasingly expensive. Preheating and/or pre-reduction using natural gas, recycled furn

    Jan 1, 2004

  • SAIMM
    Role of Metal Accounting in Assessing and Managing the Business Risks Involved in Production Planning

    By Donald Leroux, Simon Gariépy, Luc Lachance

    "Quantitative information about the quality of metal balance results is often overlooked when making important plant production planning decisions. Not only is this common omission made in a context w

    Jan 1, 2015

  • SAIMM
    The application of new design concepts in high tension electrostatic separation to the processing of mineral sands concentrates

    By D. M. MacHunter, T. Lawson, D. K. Henderson

    The development and commercialization of new generation high tension electrostatic separators has provided a basis for simplifying mineral separation plant circuitry. The inclusion of new design f

    Jan 1, 2003

  • SAIMM
    Measurement And Control Of Arcing In A Submerged-Arc Furnace

    By P. J. Brereton-Stiles, C. J. Hockaday, I. J. Barker, M. S. Rennie

    This paper reports on studies that have been done on the electrical conduction in silicon, ferro silicon, and charge chrome furnaces. A system has been developed that can distinguish between normal r

    Jan 1, 2007

  • SAIMM
    Continuous improvement management for mining companies

    By M. Mikolás, L. Pomothy, K. Špakovská, M. Vanek

    "Enterprises are faced with increasing economic competition and managers are obliged to look for methods that will ensure a competitive edge in their companies’ markets. These methods include manageri

    Jan 1, 2015

  • SAIMM
    Interaction Between The Block Cave And The Pit Slopes At Palabora Mine

    By Peter Townsend, Sergei Diachenko, Allan Moss

    The Palabora Mining Company has successfully extended the life of its operation by developing a 30,000tpd block cave underground mine below the now closed open pit. The process of transitioning from

    Jan 1, 2006

  • SAIMM
    Reduction Of Chromite Ore At Different Flow Rates Of Inert Gas

    By Dolly Chakraborty, S. Ranganathan, S. N. Sinha

    Pre-reduction of chromite outside the submerged-arc furnace (SAF) can significantly lower the specific power consumption in the SAF process. Conventional processes for the pre-reduction of the ore ope

    Jan 1, 2007

  • SAIMM
    Hard rock tunnel boring, cutting, drilling and blasting: rock parameters for excavatability

    By K. Thuro, R. J. Plinninger

    ABSTRACT: Determining tunnel stability is a key issue during preliminary site investigation. In contrast, problems of excavatability have been largely ignored. While the choice of an economic tunnelli

    Jan 1, 2003

  • SAIMM
    The Behaviour Of Coke In Submerged Arc Furnace Smelting Of Ferromanganese

    By S. Kamalpour

    It has been observed that the productivity of ferromanganese furnaces, and the stability of metal and slag compositions, vary considerably according to the type of coke used as reductant. However, the

    Jan 1, 2004

  • SAIMM
    Performance Enhancement Tools For Grinding Mills

    By W. Valderrama, D. G. Almond

    Operation of large SAG mills requires a change in the conceptual approach to grinding processes. The traditional energy consumption criteria are now enhanced with new criteria derived from the mechani

    Jan 1, 2004

  • SAIMM
    Rockfall Hazard Evaluation Using Probabilistic Keyblock Analysis

    Gravity-driven rock falls account for a large proportion of all fatalities and injuries in underground mines. Potentially unstable blocks of rock are found in the hanging wall of excavations, which ma

    Jan 1, 1998

  • SAIMM
    Mathematical Model Of Heat And Mass Transfer In The Steel Belt Sintering Process

    By T. Fabritius, L. Hekkala, J. Härkki

    The Outokumpu steel belt sintering technology is used for manufacturing chromite pellets that are charged into smelting furnace for ferrochromium production. Hot air is blown through the moving bed of

    Jan 1, 2004

  • SAIMM
    An Overview Of Current Manganese And Chromium Ferroalloy Production In Russia

    By V. I. Zhuchkov, L. A. Smirnov, E. I. Arzamastsev, A. A. Babenko

    A brief analysis is given for state-of-the-art of manganese and chromium ferroalloy production in Russia and their consumption by metallurgy plants. The main causes of low output of manganese an

    Jan 1, 2004

  • SAIMM
    Strategic Long Term Planning In Mining - Synopsis

    By G. L. Smith

    The fundamental challenge facing mineral and metal companies is how to create sustainable value while operating within mandated strategic bounds, identified constraints, and variable market and econom

    Jan 1, 2012

  • SAIMM
    Double-header trains at Great Noligwa mine - Synopsis

    By L. van Dyk

    The project was aimed at evaluating the double-header trains implemented at Great Noligwa mine, looking at the changes from the old conventional trains to the new trains, and identifying possible impr

    Jan 1, 2008

  • SAIMM
    A Twin-Cathode Dc Arc Smelting Test At Mintek To Demonstrate The Feasibility Of Smelting FeNi From Calcine Prepared From Siliceous Laterite Ores From Kazakhstan For Oriel Resources Plc

    By H. Lagendijk, I. J. Reinecke

    Mintek was contracted by Oriel Resources plc in 2004 to conduct a preliminary assessment study on smelting ferronickel from the large but relatively low grade Shevchenko nickel ore deposit in Kazakhst

    Jan 1, 2007