Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • ISEE
    A Comparative Study Of Ppv Analysis Of Tunnel Rounds Using Both Non Electric And Programmable Electronic Detonation

    By Andrew Wetherelt

    Blast vibrations are of paramount importance in a society where ever increasing development is putting more stringent requirements on their control. Increasing civil development and more complex extra

    Jan 1, 2007

  • ISEE
    Journal: 100 Years / E.I. DU PONT DE NEMOURS POWDER COMPANY

    By Robert Hopler

    Blasting powder is a slow-acting, black, granular explosive made of sulphur, charcoal and either potassium nitrate (saltpetre) or sodium nitrate. The blasting powder containing potassium nitrate is kn

    Jan 1, 2014

  • ISEE
    Reducing eyebrow break caused by rock blasting in Malmberget mine

    By Zong-Xian Zhang

    In sublevel caving mines, serious eyebrow break usually gives rise to lower ore recovery, higher dilution, and worse safety for the people working in the field. For example, chargers must go near the

    Jan 1, 2011

  • ISEE
    Using An Anfo/coal Blended Blasting Mixture For Commercial Blasting Applications

    By Dennis Wilzbacher, John Wiegand

    In an effort to reduce the cost of bulk explosives, Vigo Coal Company found that the addition of coal mined at their Friendsville Mine, not only reduced explosive costs, but also appeared to actually

    Jan 1, 2007

  • ISEE
    Journal: 100 Years / The breakup of DU PONT

    By Robert Hopler

    On June 13, 1912, the final decree of dissolution of the DuPont explosives trust was handed down, and the resulting new companies began operating at the beginning of the new year. The property assets

    Jan 1, 2014

  • ISEE
    Minimising Coal Damage and Loss Due to Cast Blasting

    By Tapan Goswami

    The main objective of the blasting phase in a coal mining operation is to maximise the coal recovery. However, coal loss due to blasting is a serious problem. The Australian Coal Association Research

  • ISEE
    Implementation of an Integrated Quality Assurance and Control System Applied to High Complexity Blasting Open Pit

    By Regina Rocha, Miguel Humpire

    One of the challenges within unitary mining operations is blasting, which has a significant downstream impact on the following processes, which is why mining companies ensure the results of the blasti

    Feb 6, 2023

  • ISEE
    Minimising Coal Damage and Loss Due to Cast Blasting

    By Tapan Goswami

    This paper discusses the importance of coal mapping, the rock properties of the roof and floor interface of the coal seam, and the significance of loading and initiating designs in minimising coal dam

    Feb 1, 2020

  • ISEE
    Full-Scale Testing of Delay Timing Effects on Rock Fragmentation in the Shock Collision Regions

    By M R. Hettigner, J Nawrocki, C E. Johnson, P G. Cahill

    This study evaluates the effects of both short inter-hole and intra-hole delay times on rock fragmentation and throw. Full-scale test blasts were analyzed at a granite quarry in Talbotton, GA. This an

    Jan 1, 2017

  • ISEE
    Blast Vibration Analysis from Signature Holes

    By Nikolaos Petropoulos, Ulf Nyberg, Daniel Johansson

    A series of signature boreholes were blasted to observe any difference between confined and free face blasts. Four geophones were used to capture the compressive wave. The conventional approach, i.e.

    Feb 1, 2020

  • ISEE
    Modeling the Effect of Delay Scatter on Peak Particle Velocity of Blast Vibration Using a Multiple Seed Waveform Vibration Model

    By Mick Lownds, Ruilin Yang

    The potential advantages of electronic detonators with accurate timing have been increasingly recognized by the blasting community. However, in comparative blasts the results with pyrotechnic timing a

    Jan 1, 2011

  • ISEE
    Analysis of the Impact of Raw Material Bio Diesel 30 Usage in Explosives Performance

    By Hapsari Rosa, Ross Cowie

    Conventional blasting activities in the mining process use various types of explosives, with the primary raw materials being Ammonium Nitrate and diesel fuel. The quality and specifications of the two

    Feb 6, 2023

  • ISEE
    Numerical Simulation for Linear Charge Coyote Blasting with Presplitting Boreholes

    By Huang Fenglei, Jin Qiankun

    A new linear charge method has been applied in coyote blasting for highway excavation in which presplitting boreholes are set along the designed rock slope with some empty chambers at the end of linea

    Jan 1, 1998

  • ISEE
    Rock Slope Remediation on the Pennsylvania Turnpike

    By Ron Woolf, Corry Goumans

    With increasing traffic volumes experienced thro u g hout North America, a common goal for Highway officials is to keep traffic flowing as much as possible and to keep disruptions to the flow to a min

    Jan 1, 2003

  • ISEE
    Ring Blasting Mine to Mill Optimization

    By Joel Chipana, Roberto Laredo, Benjamin Cebrian

    Ring blasting is a common production method in underground metal mines. As a drill and blast process, it presents particular features that do not correspond with bench blasting in open pit or undergro

    Jan 1, 2017

  • ISEE
    Disposal of Old Munition - Part 1. - A Research Method for the Estimation of Heavy Metal Deposit Range of Open Sur-face Mass Detonations

    By Martti Hagfors, Mervi Hokkanen

    The Finnish Defence Forces has destroyed obsolete and spoiled ammunition in open surface mass detonations at Hukkakero fell, in municipality of Kittilä, in Lapland since 1988. The de-struction method

    Jan 1, 2011

  • ISEE
    Reducing Blast Vibration Amplitudes Close-In to Structures of Sub-Standard Construction

    By Enrique Munaretti, Cathy Aimone-Martin, Vitor Rosenhaim, Jair Koppe

    Production blasts at one of Copelmi’s coal mine operations will be carried out 100 m (330 ft) from a neighborhood located in the town of Butiá, southern Brazil. Mine management is concerned about the

    Jan 1, 2013

  • ISEE
    Large Hole Rotary Drill Performance (c77e5de0-de67-47fa-9ab6-1a7cb81cfd58)

    By J Lyall Workman, Peter N. Calder

    Large hole rotary drilling is one of the most common methods of producing blastholes in open pit mining. Large hole drilling generally refers to diameters from 9 to 17 inch (229 to 432 mm), however a

    Jan 1, 1996

  • ISEE
    Effect of Artificial Discontinuities Formed by Presplitting with Different Depths on Structural Damage Risk

    By Enver Alan

    This Research & Development (R&D) study was conducted in the field of applied blasting engineering in Ethiopia, within the AKH Railway Project, which was built in Girena, within the boundaries of the

    Feb 1, 2020

  • ISEE
    Debris Directionality Comparison: Full Scale Tests to Q/D and QRA

    By Lon Santis, Bill Evans, John Tatom

    Debris data from the Department of Defense Explosives Safety Board’s Project ESKIMORE full-scale explosives event test program are compared to quantity-distance (Q/D) standards and quantitative risk a

    Jan 1, 2015