The Relationship between Strain Energy Density and Micro-cracking in the Rock StrataBy Vilem Petr
Optimization blast design parameters for rounds used at surface mines, quarries or cast blast has taken on a new importance with the increased the cost of the explosives and electronic detonators. Thi
Jan 1, 2008
-
Study of the Detonation Process of Novel Hydrogen Peroxide-based Explosives Using High Speed VideoBy Italo Onederra, Miguel Araos
"In order to characterize non-ideal explosives, the explosives industry rely on unconfined velocity ofdetonation tests and where possible underwater pond tests. The information obtained from such test
Jan 1, 2017
-
New Safety Fuse using NO3Na+C+S as its FormulationBy Jesús V. Saccsa, Kenji B. Loayza, Erick M. Condori, Jorge A. Velásquez
This research investigates how to reduce manufacturing costs of a safety fuse composed of black powder, replacing its ingredient NO3K by NO3Na for processing, and contributing to minimize costs per bl
Jan 1, 2017
-
Drill and Blast Optimization at the Sparkhule Limestone QuarryBy Paul L. Matrin
This paper will discuss the recent and on-going drill and blast optimization measures at the Sparkhule Limestone Quarry, which have resulted in a 44% reduction of drill and blast unit costs per ton of
Jan 1, 2004
-
Blasting Related Aggregate Size OptimizationBy John Cory, Ran Tamir
Blasting data analytics are being increasing used to increase mining productivity, reduce mining costs, maximize high margin aggregate products, and to reduce fines. Three examples will be illustrated
Jan 1, 2012
-
Instrumental Detection of a Climatologically-Induced Cosmetic Crack in Wall CoveringBy Pierre-Alexandre Abeel, Charles Dowding, Justin Lueker
When blasting is eliminated as a cause of cosmetic cracking, often someone will ask, “If blasting didn’t cause the crack, then what did?” This paper describes detection by remotely operated instrument
Jan 1, 2015
-
Vibration Control During the Construction of an In-Pit Lime Kiln (8311e31c-6f16-4a2a-8cda-6570ebbd2b33)By Paul Worsey, Ron Ecklecamp, Scott G. Giltner, Ronnie Inman, Terry Drechsler
A blast monitoring program conducted at Chemical Lime Companys new lime calcining facility near Ste. Genevieve, Missouri is discussed. The purpose was to develop blasting criteria for the construction
Jan 1, 1996
-
Blasting at Operating International AirportBy Earl C. Hutchison, John Loviza
At the Metropolitan Nashville International Airport, with its more than 600 scheduled daily flights from American Airlines hub operations, other scheduled airline flights, Tennessee Air National Guard
Jan 1, 1992
-
A Blast Design Analysis for Optimizing Productivity at INCO Limited's Thompson Open PitBy Nan H. Lee, Christopher J. Hunter, Stephen H. Chung
Several factors affect the productivity of mining operations. The geological structure of a mineral deposit and the fragment size of blasted material are considered to be most influential. It is well
Jan 1, 1991
-
Methodologies for Fines Control in Blasting Operations related to Porphyry Cu Supergene MaterialsBy Diego Quezada, Carlos Munoz, Marco Arellano
It is well-know that the presence of fine materials in mining has a direct impact on the plant processes with a great influence in the total amount of ore production and recovery. In Cu mining heap le
Jan 1, 2010
-
Underwater Energy Measurements for Aluminized and Nonaluminalized Emulsion and Watergel Type Commercial ExplosivesBy Oldrich Machacek, Gary R. Eck
The underwater detonation test method has been long recognized as a useful tool for the evaluation of the energy release and relative effectiveness of commercial explosives. In this study, underwater
Jan 1, 1990
-
High-Order Numerical Methods and Reaction Rate Law for Non-Ideal Detonation ModelingBy Eduardo Lozano, Vilem Petr
This study demonstrates the ability of high-order, shock-capturing methods to simulate detonation wave propagation in right circular cylinders of non-ideal explosives. 2-D axisymmetric, reactive Euler
Jan 1, 2019
-
Parameters Affecting Explosive Energy Release - A Case for Realistic Rating of Commercial ExplosivesBy B Mohanty
The current basis for rating of commercial explosives is examined, with particular emphasis on calculated bulk and weight strengths, detonation velocity and underwater energy measurement. The calculat
Jan 1, 1988
-
Blast Design Methodology for Surface Mines: An Integrated Approach to Optimization - Part 1By G. R. Adhikari
A major part of mineral production comes from surface mining and there has been a rapid growth in this sector with the deployment of high capacity equipment. The importance of blast design combining a
Jan 1, 2002
-
Design/Build Highway Blasting - Case StudyBy Cathy Aimone-Martin, Frank Achuff
The New Mexico Department of Transportation (NMDOT) and the Federal Highway Administration (FHWA) have let a contract to Sierra Blanca Constructors for a design / build contract along 38 miles US 70 i
Jan 1, 2004
-
Developing Controlled Blasting Methods For Excavation of Rock and Concrete Near Critical StructuresBy Gordon F. Revey
In construction and mining work, situations occasionally occur where hard rock or concrete must be excavated at locations near critical structures or utilities. Fearing damage from blasting, contracto
Jan 1, 2002
-
Demolition of the ADMP-1 Jackup Platform for Aramco in the Arabain GulfBy J S. Brower
Disposing of the AMDP-1, Jackup drilling rig in the Arabian Gulf.
Jan 1, 1978
-
A Rational Method for Predicting Damage to Historical Structures Subjected to Blasting VibrationsBy Kenneth Medearis
The accurate prediction of possible damage to historic structures subjected to blasting-related ground motions is not infrequently the dominant factor in whether or not a mining or quarrying operation
Jan 1, 1993
-
Engineering Considerations for Blasting at the Hanging Lake Tunnel Project, Glenwood Canyon, ColoradoBy Thomas R. Scotese, John L. Ackerman
The Hanging Lake Tunnel Project represents a major portion of the Glenwood Canyon Project, the last piece of Interstate 70 to be constructed. The project features twin bore, large span rock tunnels an
Jan 1, 1992
-
CO Migration from Trench Blasting in Amherst, New YorkBy Marcia Harris, Richard Mainiero
The New York State Department of Transportation recently commenced highway widening and drainage improvement projects in Clarence and Amherst, NY. Drainage improvements including the installation of s
Jan 1, 2004