Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Spanish roofing slate deposits
By M. Lombardero, J. Garcia-Guinea, J. Taboada, B. W. Roberts
The structural, textural and mineralogical properties of the slate formations of NW Spain make it the most important district in the world for quarrying roofing slates. Over the past 10 years the intr
Jun 19, 1905
-
Bjorkdal gold-mining project, northern Sweden
The deposit was discovered during systematic reconstruction of the geological history of glacial overburden, which averages 6 m in thickness over 80% of Sweden, by geochemical sampling and searching f
Dec 1, 1995
-
Ammonia leaching process for Escondida copper concentrates
By W. P. C. Duyvesteyn, B. J. Sabacky
Reprinted with revisions from Extractive metallurgy of copper, nickel and cobalt, volume I: Fundamental aspects. ed. Reddy R.G., Weizenbach R.N. Warrendale, Pennsylvania: The Minerals, Metals and Mate
Dec 1, 1995
-
Hydrothermal alteration associated with sediment-hosted Rooiberg tin deposits, South Africa
By J. E. Misiewicz, A Rozendaal
Paper presented at Geofluids '93, held in Torquay, UK, 4-7 May 1993. The tin field consists of a fragment of Lower Proterozoic volcanosedimentary rocks surrounded by granitoids. Almost all the signifi
Aug 1, 1995
-
Bross process: bio-treatment of alkaline slags produced during lead recycling
By L. J. Barnes
The process for bio-remediation of sulphidic slag (BROSS) operates at 45 degrees C in a neutral (pH 7), aerobic aqueous environment in which sulphide in the slag is converted to sulphate. A two-stage
Jun 18, 1905
-
Removal of copper from magnetite concentrates by chlorination
Two concentrates from Palabora, in South Africa, containing 0.056-0.068% undesirable Cu and 0.8 or 2.2% Ti, were chlorinated with air:chlorine ratios of 10:1, 15:1 and 20:1 at temperatures between 1 2
Jun 21, 1905
-
Comparison of indicator and ordinary kriging in assessment of in-situ coal quality in a Turkish mine
By A. E. Tercan, D. Mamurekli
Ordinary kriging on the assumption of a gaussian error distribution and indicator kriging were used to derive the probability that a given calorific value would or would not be exceeded by coal from a
Jun 19, 1905
-
Defining overload conditions for 7.6 cm Knelson concentrator by use of synthetic feeds
By G. B. Harris, A. R. Laplante
Fine tungsten was used to mimic gold and fine and coarse silica and magnetite to mimic gangue. The optimum flow rate of fluidisation water varied from 1.7 l/min for fine silica to 5.6 l/min for coarse
Jun 18, 1905
-
High-temperature mine climate simulation model for predicting the effect of mine fire
By P. Mousset-Jones, G. Danko
Variations of the temperature and steam/moisture content of the air with distance and time are modelled for a single airway. The input for the simulation is an air temperature that varies with time, t
May 1, 1991
-
Oxidation of chalcopyrite in simulated suspension smelting
By R. O. Suominen, P. A. Taskinen, K. R. Lilius, A. T. Jokilaakso
Chalcopyrite concentrate was flash-oxidised in a laminar-flow furnace in oxygen-nitrogen atmospheres that ranged in composition from N2 to N2 + 50 vol% O2. Gas pre-heating temperatures were 500-1100 d
Jul 1, 1991
-
Effect of polyamines on mineral separation of nickel-copper ores: chelation equilibria in collectorless floation with DETA
By S. Kelebek
DETA exhibits a highly selective depressant action on pyrrhotite without adversely affecting the collectorless flotability of pentlandite and chalcopyrite in nickel-copper ores of the Sudbury region.
Jun 18, 1905
-
Kinetics of reduction of metal values from fayalite-based slags -part 1: reduction of nickel and copper
By B. S. Terry, C. L. Harris
After measuring the kinetics of Ni reduction from a SiO2-saturated fayalite slag into a Cu-based metallic phase on a laboratory scale, a general model was developed that is capable of simulating mass
Aug 1, 1995
-
Engineering geomorphological mapping and opencast mining in unstable mountains - a case study
By G. J. Hearn
between particles in the classifying region is then
Apr 1, 1995
-
Replacement mineralization styles and breccia dome formation at Dirtlow Rake fluorite-barite deposit, Castleton, England
By C. A. Jeffrey
The Dirtlow Rake vein deposit, which is up to 12 m thick, contains a range of paragenetically linked replacement mineralisation styles typical of many Mississippi Valley-type deposit environments. The
Jun 19, 1905
-
Risk model of planned profit from a surface mining venture
By R. A. Halatchev
A risk model for assessment of the uncertainty in the forecasts of the planned profit is developed. It is based on the selling price of the metal recovered from the ore and the production per shift of
Dec 1, 1996
-
Mine backfilling to limit surface subsidence: a case history
By P. H. Carr, G. G. Marino, K. A. Patel
Extensions to a correctional institution at Wabash Valley, Indiana, required development over abandoned coal-mine workings, at 90 m depth, where subsidence was possible at surface. Backfilling of the
Jun 19, 1905
-
Drill productivity evaluation by monitoring
A production drill rig at a site in Sweden was equipped with a monitoring system to estimate production statistics. Drill running times, drill hole depths, penetration rate, rotation speed, thrust, ai
Jun 19, 1905
-
Oxygen refining of silver-copper alloys
By C. A. Pickles, J. M. Toguri
The refining of two molten Ag-Cu alloys, containing 7.5 and 11.2 mass% Cu, with a borosilicate slag was investigated using both air and pure O2 to determine the effects of the following variables: flo
Dec 1, 1995
-
Prediction of mining conditions at depth in Kristineberg Mine, Sweden
By N. Krauland, A. Nystrom, M. Board, S. Sandstrom
Several deep Swedish cut-and-fill mines experience severe ground control problems, including roof collapse and wall sloughing, as a result of variable rock quality and high in situ stresses. A project
Dec 1, 1995
-
Evaluation of rock properties during cutting by tunnel-boring machine disc
By V. Krupa, E. Lazarova
A method is proposed for the continuous calulation of a rock mass in real time while tunnelling with a TBM. Rock properties are investigated through models of the fracture stress under the disc cutter
Dec 1, 1996