Complex Piling Works At London Blackfriars StationBy Jamie D. McEwan
To cater for the future introduction of 12 car trains, London Blackfriars railway station is being extended from the north end to span across the River Thames. Following the demolition of existing bui
Jan 1, 2011
-
New Device For Load Testing Driven Piles And Drilled Shafts Separates Friction And End BearingBy J. Osterberg
A new device has been developed for load testing driven piles and drilled shafts which consists of an hydraulic jack or bellows which has a telltale rod fastended to the bottom. The rod extends upward
Jan 1, 1989
-
Wharf Reconstruction At Gasps Sandy Beach - HistoricPort Gaspé is located on the back side of Gaspé bay and is protected by a natural sand barrier with a length of 2,5 km, from which it got its name, Gaspé Sandy Beach (1). Since 1904 the Gaspé regi
Jan 1, 1987
-
New Possibilities for Quality Assurance of Diaphragm Wall JointsBy Joram M. Amir, Ernst Niederleithinger, Nikolaus Schneider
"Abstract: Diaphragm walls are used to provide a stable and watertight confinement for the construction of tunnels, underground railway stations, deep basements and other structures requiring deep exc
Jan 1, 2014
-
Deep Mix-In-Place Soil/Cement Stabilisation Using Hollow Stem Augers For Excavation At Elland, West YorkshireBy J. A. Elliot
Deep Mix-in-Place soil stabilisation is achieved by forming columns of soil/cement arranged to overlap by secant intersection. Alternate columns are constructed initially and infilled. The cementitiou
Jan 1, 1989
-
Non-Destructive Testing Of Drilled Shafts and CFA Piles – Current Practice and New MethodBy George Piscsalko
"Quality control of drilled shafts and CFA piles is greatly dependent upon the practices of the site personnel. In many applications it is difficult or not possible to fully inspect the shaft prior to
Jan 1, 2014
-
Small Diameter Piling System Used In AustraliaBy P. J. Yttrup
Small diameter timber piles are used in Australia to solve foundation problems in soft or filled ground and expansive soil. The paper describes the results of pile load tests to develop simple methods
Jan 1, 1989
-
Time Dependent Open-End Pipe Pile Capacity Assessment By Dynamic And Quasi-Static MethodsBy Derrick D. Dasenbrock
Three piers of a new river bridge are supported on 1.067 m diameter open-end steel pipe piles. At time of drive, and after pile re-strikes, high-strain dynamic capacity values at plan tip elevations,
Jan 1, 2006
-
Thornton Road, Listerhills, BradfordBy B. C. Slocombe
A large derelict inner city site was regenerated for use as a distribution warehouse. Difficult topography and soils conditions required the adoption of a combination of specialist geotechnical proces
Jan 1, 1989
-
Development of a New, Advanced form of Sodium Silicate for Chemical GroutingBy Julie Shang, Tim Evans, Michael McDonald, Yu Guo, Bingfeng Xue
Effective chemical grouting represents a technical and economic solution to many challenges related to soil stabilization and blocking the flow of water. Chemical grouts are facing increasing demands
Jan 1, 2018
-
Proof of Bearing Capacity of Anchors on the Example of Innovative Anchor Monitoring SystemBy Stephan Großwig, Karolina Nycz, Arne Kindler
"Commonly used anchor monitoring systems are mainly based on the use of anchor force meters. However, experience shows that the reliability of the display of force meters lowers over time. Other measu
Jan 1, 2017
-
Case History On Pipe Pile Installation - Presented At An Associated Pile & Fitting Corp. GEO-Pile Conference San Francisco, CABy Jerry F. Parola
In current practice, pile foundation design is based on a general under-standing of pile-soil interaction during installation and superstructure-pile-soil interaction after construction. The pile desi
Jan 1, 1986
-
List Of ExhibitorsA technical exhibition was held in conjunction with the 4th DFI International Conference on Piling and Deep Foundations, Stresa. The exhibition was located in the ground floor of the Conference Hall.
Jan 1, 1994
-
A Cut And Cover In Stiff Clay In Eurre-France - SynopsisBy R. Stenne
This paper deals with a complementary soil investigation which being part of the contract helped understand the behavior of a softened clay and adjusted the design of a retaining structure accordingly
Jan 1, 2000
-
The Equilibrium Point Method Of Analysis For The Statnamic Loading Test With Supporting Case HistoriesBy R. G. Horvath
The Statnamic loading test is a new and innovative method for testing deep foundations. The test is relatively inexpensive, quick, easily mobilized, provides for direct measurement of applied load and
Jan 1, 1993
-
Deep Mixing Technologies for Lateral Support SystemsBy W. Sondermann
"AbstractWith the increasing demand in reuse of inner city areas and the urgent need for deeper foundation pits under cramped circumstances, adjacent structures close to and high ground water level, t
Jan 1, 2014
-
Unbraced Circular Cofferdam For Vent Building No. 6 At The South Bulkhead - IntroductionBy Philip Bonanno
The first major project in Boston's new access to Logan Airport was an Immersed Tube Tunnel which extended 3,600 ft. from South Boston to East Boston across Boston Harbor. Twelve tube sections, 3
Jan 1, 1994
-
Vibratory Driver/Extractors Do More Than Drive Sheet Piles - SummaryBy John L. White
Vibratory driver/extractors do more than drive and extract sheet piles. I would say more than sixty percent (60%) of the time, vibratory pile driver/extractors are engaged in work that has nothing to
Jan 1, 1997
-
Short Comparison Of The Determination Of Allowable Loads Of Steel H-Piles Following The Practice Applied In Different European Countries - SynopsisBy L. P. Weber
During the years 1983-1987, a research programme, jointly performed by the steel producers ARBED, British Steel Corporation, Peine-Salzgitter, Unimetal, and co-sponsored by the European Community for
Jan 1, 1991
-
Deep Foundations On Deer IslandBy Michael W. Oakland
Deer Island is the site of the Massachusetts Water Resources Authority (MWRA) wastewater treatment plant which, when completed in 1999, will serve 43 cities and towns in central eastern Massachusetts.
Jan 1, 1994