    Vacuum Wellpoints For Slope Stabilization In The Foundation Pit During A Dry Dock Construction

    By Mai Yuanjian

    The stabilization effect in large excavation slope with vacuum wellpoints system during construction of a dry dock located in Guangzhou is introduced in this paper. In-situ observations indicate that

    Jan 1, 1991

  • DFI
    Real-Time Monitoring During Shaft Contruction For The Sound Transit Ulink I-5 Undercrossing

    By Pierre Gouvin

    This paper describes the design, installation and monitoring of a state of the art real time geotechnical/structural instrumentation monitoring system to facilitate tunnel construction under Interstat

    Jan 1, 2010

  • DFI
    Innovative Grouting Techniques for Installation of a Seepage Barrier at Barrage Des Quinze Dam (Quebec, Canada)

    By Danny Déry-Chamberland, Peter Bowman, Michael Byle

    "The Barrage des Quinze dam is a concrete sluice dam consisting of 19 spillway sections, each of which is approximately 7.6 metres wide and 14.5 metres deep. Rehabilitation efforts being performed on

    Jan 1, 2016

  • DFI
    Rehabilitation of the Kölnbrein Dam / Austria

    By Frank Haehnig, Kurt Kogler

    "With a height of 200 m, a crown width of 626 m and a concrete volume of 1.6 million m³, the Kölnbrein Dam in the upper Malta valley in Carinthia / Austria is the largest concrete dam in Austria. Boas

    Jan 1, 2016

  • DFI
    Bearing Capacity of Post Grouted Drilled Shafts Using a Load Transfer Approach

    By Miguel E. Ruiz, America L. Fernandez, Miguel A. Pandon

    "Post-grouted drilled shafts (PGS) are a deep foundation system in which grout is injected at high pressure throughout the tip after the drilled shaft has been installed. Pressure grouting of drilled

    Jan 1, 2005

  • DFI
    DEEP FOUNDATIONS INSTITUTE 45th ANNUAL CONFERENCE ON DEEP FOUNDATIONS

    By Sebastian Lobo-Guerrero

    Welcome to DFI45! our first on-line annual meeting. We cannot deny the severe impacts that the COVID19 pandemic is having in our industry and our lives. We extend our support to all of our members tha

    Oct 27, 2020

  • DFI
    Pile Settlement Design Using Continuous Surface Wave Testing And Modulus Degradation

    By Hennie F. T. Barnard

    Where geotechnical designs are governed by settlement requirements, soil and rock moduli are important parameters for design. This paper reports on a method that was used to utilize dynamic modulus me

  • DFI
    D-Wall Extreme – Contrast Between Going Deep And Getting Small

    By Alexander Blatt, Franz-Werner Gerressen

    Diaphragm wall technique is usually used to construct structural elements in the ground, commonly used for retention systems, permanent foundation elements or deep groundwater barriers, named Cut-Off-

    May 1, 2022

  • DFI
    Pile Settlement Design Using Continuous Surface Wave Testing and Modulus Degradation (9593f752-8bd1-4766-938c-27b4baad33f2)

    By Hennie F. T. Barnard, Theodore E. B. Vorster

    Where geotechnical designs are governed by settlement requirements, soil and rock moduli are important parameters for design. This paper reports on a method that was used to utilize dynamic modulus me

    Jan 1, 2017

  • DFI
    A Case History on Design, Construction, and Performance of Stone Column Ground Improvement beneath an MSE Embankment

    By Dominic Parmantier, Karen Dawson, Suthan Pooranampillai, Seungcheol Shin

    "This paper presents a case study of the deformation-based design, construction, and performance of stone column ground improvement (GI) beneath a mechanically stabilized earth (MSE) wall and bridge a

    Jan 1, 2017

  • DFI
    Construction of Long Deep Mixing Columns by Low-Height Rig

    By Shigenori Horikawa, Nobutaka Tanaka, Toshiro Hara, Kengo Yamamoto

    "The CDM-LODIC method(Low Displacement and Control method), a modified the CDM(Cement Deep Mixing) method, reduces the ground displacement through the removal of in-situ soil equivalent to the amount

    Jan 1, 2015

  • DFI
    Field Testing Of Energy Piles At Virginia Tech

    By Olgun

    Energy piles are a new innovative renewable energy technology to access and exploit the relative constant temperature of the ground for efficient heating and cooling of buildings. Examples of energy

  • DFI
    Field Testing of Energy Piles at Virginia Tech (eec8519c-b3f5-4281-8615-91be67ef6c77)

    By C. Guney Olgun, Charles Elks, Sherif L. Abdelaziz, James R. Martin, Christopher Fox, Pier Luigi Iovino, Fatih Catalbas, Pierre Gouvin

    "Energy piles are a new innovative renewable energy technology to access and exploit the relative constant temperature of the ground for efficient heating and cooling of buildings. Examples of energy

    Jan 1, 2017

  • DFI
    St. Anthony Falls, I-35w Bridge Drilled Shaft Load Test Program

    By Jeffrey A. Gebhard

    As part of the design and construction of the new St. Anthony Falls I-35W Bridge, a full-scale load test was conducted on a 6 1/2-foot diameter drilled shaft in the St. Peter Sandstone. This load tes

    Jan 1, 2009

  • DFI
    Non-Destructive Testing Methods for Drilled Shaft and ACIP Piles (34748882-cb96-4081-9967-58c48901bc15)

    By George Piscsalko

    "Quality control of drilled shafts and ACIP piles is greatly dependent upon the practices of the site personnel. In many applications it is difficult to properly inspect the shaft prior to concreting,

    Jan 1, 2017

  • DFI
    Deep Mixing Field Trials for Land Remediation: Some 3-Year Results from the SMiRT Project

    By Ziyad Abunada, David O’Connor, Fei Jin, Abir Al-Tabbaa

    "In-situ remediation of contaminated land with deep mixing can enable a multi-technique remedial strategy on the same site combining low permeability barriers, permeable reactive barriers, stabilisati

    Jan 1, 2015

  • DFI
    Secant Pile Top-Down Construction for a Drainage Channel in Puerto Rico: An OPA Finalist

    By Bill Shea, Gordon King

    "For a drainage channel built in San Juan, Puerto Rico, a value engineering (VE) proposal incorporating a secant pile top-down approach saved time and facilitated construction work on the larger flood

    Jan 1, 2012

  • DFI
    Excavation Techniques For Underground Drinking Water Pipe Line With Micro Piles As A Special Application

    By Andhra Pradesh, Nagarajkumar B. V

    As a part of Mumbai City Mega Drinking Water Project at Amar Mahal Tunnel-1 Ghatkopar East Mumbai, drinking water tunnels were proposed by MCGM from Amar Mahal to Trombay reservoirs, Amar Mahal to Wad

    Sep 1, 2022

  • DFI
    Ultimate Lateral Load of a Pile in Cohesive Soil under Static Loading

    By Dileej M. Dewaikar, Poonam A. Patil

    "In this paper, the ultimate lateral resistance of a long, flexible, unrestrained vertical pile in a cohesive soil is computed under static loading condition using py curves. A simple and improved met

    Jan 1, 2005

  • DFI
    The Power of Committee Research: The DFI Rock Socket Project

    By Anne Lemnitzer

    Experimental data are the cornerstone of scientific research, providing empirical evidence to validate hypotheses, test theories, inform decision-making and help develop innovative design and analysis

    Nov 1, 2023