Realistic Estimation Of Water Table Depth For Design Optimization Of Bored Tunnel And Cut & Cover Tunnel Structures For Underground MetroBy Chiranjib Sarkar, Sibapriya Mukherjee, N Kumar Pichumani
With the rapid expansion of urban transportation systems, tunnels and cut & cover structures are considered as the only solution in improving the urban space congestion problem in mass rapid transit s
Nov 1, 2022
-
Unique Anchor Pile SOE SystemBy Andrew Stauble
This project included the replacement of the Long Island Railroad (LIRR) Atlantic 6 Bridge in New York City, which services rail traffic and spans the Van Wyck Expressway and frontage roads. The bridg
Aug 1, 2023
-
Multiple Foundation Types For Bridges Over The Same Coal MineBy Kenneth M. Berrry
A unique situation has developed at an abandoned coal mine in St. Clair County, Illinois. Subsidence features have been observed at the ground surface over the mine including settlement of a pair of b
Jan 1, 2001
-
New Ground Freeze Method for Groundwater Cutoff below Foundation Excavations in Permeable SoilsBy Daniel W. Mageau, Larry W. Applegate, Aaron K. McCain
"An innovative method of ground freezing was successfully tested to create a “dry” excavation condition for a new building foundation at a site in downtown, Miami, Florida. The subsurface conditions i
Jan 1, 2015
-
Design for Installation of Suction Piles in Sand Deposits for Mooring of Floating Offshore StructuresBy Chul Soo Park, Juhyung Lee, Duhyun Baek
"In this study the preliminary design of suction pile as the supporting system of the concrete floating structures was performed at the offshore pilot project area in Korea. The suction pile of the fl
Jan 1, 2017
-
Screening Tool for Impact Hammer SelectionBy Gerald Verbeek, David Tara
"When selecting an impact hammer to drive a particular pile, the decision is often based on local experience. In those cases, the contractor falls back on previous experience or draws on the experienc
Jan 1, 2017
-
Alternative Analytical Methods for Borehole Permeability Tests in Seepage Barrier WallsBy R. Lee Wooten, David R. Shields, Darren D. Clark
"Borehole permeability tests that measure flow or head changes in boreholes located within seepage barrier walls are commonly used to estimate the in situ permeabilities of those walls for quality con
Jan 1, 2016
-
Pile Foundations for the San Francisco 49ers NFL StadiumBy Scott A. Walker, Gabriel J. Alcantar, Brian Zuckerman, Ramin Golesorkhi
"The new San Francisco 49ers Levi’s Stadium is part of the next generation of sporting facilities. Constructed in Santa Clara, Calif., the new structure has 68,500 open-air bowl seats and includes a 7
Jan 1, 2014
-
Case Study: Design, Installation And Quality Assurance Testing Of High Capacity Socketed Piles In A Complex Geologic EnvironmentBy Thomas M. Caruso
Construction of a new ship dock at a major Philadelphia area refinery required geotechnical design and field consultation. The new dock, which consists of a system of mooring dolphins and platforms,
Jan 1, 2008
-
Testing Foundations for Major Minnesota BridgesBy Dan A. Brown, Rich A. Lamb, Paul J. Axtell
"Over the last 10 years, the Minnesota Department of Transportation (Mn/DOT) has had a very active program of replacing many major bridges, large structures spanning the Mississippi River. The deep fo
Jan 1, 2013
-
Foundations For Arsenal Emirates Stadium, LondonBy Jim Cook
Arsenal Football Club required the development of a new home stadium in north London, subsequently named the Emirates Stadium. The proposed development comprised a 60,000 seat stadium, with associated
Jan 1, 2008
-
Reflections on Tremie Concreting in Deep FoundationsBy Gilbert R. Tallard
"Pouring deep foundations by the tremie pipe method is nowadays such a common process that it has becomes an unspecified practice. Means and methods are almost entirely at the contactor’s discretion.
Jan 1, 2017
-
Construction of a Deep Soil Mixed Cut-Off and Retaining Wall in Richmond BCBy Keith MacKay, John Carter, David Siddle, Fernando Faminia
"The River Green Residential development, is located in the municipality of Richmond, BC adjacent to the Fraser River. Ground conditions at the site consisted of medium to fine grained alluvial sands
Jan 1, 2016
-
Risk Management For Dam Rehabilitation ProjectsBy Dave Paul
Dam rehabilitation involves a range of design, construction, and operation risks, some of which are not encountered in new dam construction. These risks can have significant impact on project schedule
-
Session 30 "Grouting for Tunnels 2"By Raymond Henn
Yes we have also used some however, again because of the nature of the maintenance window where we have that two hour (at best) window every night and due to the numerous other crews that are wanting
Feb 10, 2003
-
Critique of Specifications for Deep MixingBy George Filz, Peter R. Cali
"Unnecessarily restrictive specifications could be limiting the cost effectiveness of deep mixing (DM) applications and therefore limiting use of DM on projects where there are other options. Excessiv
Jan 1, 2015
-
Jet Grout For Soil Mass Stabilisation To Support Power Plant FoundationBy Vishal Pathak, Shailesh A. Godhuly
Ground Modification System in terms of Jet Grouting for soil strengthening and mass stabilization was engaged for a power plant project in an international power project, engineered by L&T-S&L. The si
Sep 1, 2022
-
Experiences and New Developments in Offshore Foundation (610f0063-3ba0-451b-bb8c-dc3962343edb)By Leonhard Weixler, Jean Wehbe, Gordian Ulrich, Franz-Werner Gerressen
"As alternative energy industries pick up speed internationally, and as government regulation and restriction limit the use of impact hammers due to environmental limitation from construction induced
Jan 1, 2017
-
Case History: Innovative Load Test Program Optimizes Pile Capacity In Challenging Ground ConditionsBy Emad Farouz
This paper presents a case history of a successful construction-phase pile load test program that optimized the pile design in challenging ground conditions at the Great Neck Wastewater Treatment Plan
-
Retaining Structure for Berth at KrishnapatnamBy P. V. Chandramohan
"The paper deals with the arrangement of structural members for a retaining structure used as a berth in the port of Krishnapatnam. The height of retention is 24.3m. A T-shaped diaphragm wall acts as
Jan 1, 2015