    25 Years of Process Development in Tar Sands Processing

    By R. Tipman

    "In 25 years, processing of tar sand progressed from two small pilot plants to two major commercial operations owned by Syncrude and Suncor. These plants mine tar sand and extract the bitumen which is

    Jan 1, 1987

  • CIM
    Utilizing a MARC to start-up Muskeg River Mine

    By Chris Yellowega

    The construction and startup of a new mine is a daunting task. To successfully locate, design, build and startup an immense human endeavour like a new mine, takes perseverance, planning, dedication an

    May 1, 2003

  • CIM
    Fully 3D Hydraulic Fracture Growth within Multi-Stage Horizontal Wells

    By Randy Settgast, Daniel Moos, Hyunil Jo, Ghazal Izadi, Christine Baba

    "Analyses of production logs of multiply fractured horizontal wells in unconventional plays show that only a small percent (~30%) of perforation clusters contribute to production. We present in this p

    Jan 1, 2015

  • CIM
    The Gap Nickel Mine, Lancaster County, Pennsylvania and the American Nickel Works, Camden, New Jersey -- 1860 - 1890

    By D. Chadwick, J. W. Matousek

    Between 1860 and 1890 -- from the time of the American Civil War to the last decade of the 19th Century -- nickel production in North America was dominated (even monopolized) by the output of the indu

    Jan 1, 2005

  • CIM
    Metallurgical Optimisation after the Replacement of two BOF Vessels at Dillinger Hütte/Germany

    By V. Fiedler, H. Lachmund, R. Bruckhaus

    "After producing some 50 million tonnes of crude steel the two BOF vessels at Dillinger Hüitte steel plant had to be replaced in 2000/01 due to large deformations. The new vessel design was optimised

    Jan 1, 2004

  • CIM
    Investigation into Laboratory Scale Tests for the Sizing of High Pressure Grinding Rolls (36201383-38b6-40ff-a8ef-b5e69088dfb5)

    By J. Drozdiak

    In this paper we present the results of preliminary investigations into the applicability of new laboratory scale tests for the prediction of operating gap and specific throughput in high pressure gri

    Jan 1, 2012

  • CIM
    The Transformation of Two-Line Ferrihydrite into Crystalline Products: Influence of the Media (Sulfate vs. Nitrate)

    By Yongfeng Jia, Shaofeng Wang, Danni Zhang

    Ferrihydrite is ubiquitous in soils, groundwater and aquatic sediments and is usually classified as "2-line" or "6-line" according to the number of diffuse XRD peaks. It has high surface area and reac

    Jan 1, 2016

  • CIM
    Dust Reaction Model in Waste Heat Boiler of Copper Smelting

    By So-Yeong Lee, Moosang Lee, Seung Hwan Ahn, Ho-Sang Sohn, Jongshin Chang

    It is necessary to understand the characteristics, phase changes and chemical reactions of flue dusts introduced from a furnace to an off-gas line in order to achieve the stable operation and the impr

    Jan 1, 2019

  • CIM
    Value Added Aluminum Smelter System Integration: Alouette Phase II Experience

    By A. Noël, R. Lapierre, M. Provencher

    "Modem aluminum smelters are facing significant operating cost pressure. Key methods used by smelters to manage this pressure are automation and production-information systems to optimize processes, m

    Jan 1, 2006

  • CIM
    The new H-W orebody-cutoff grades and mine economics

    By Bruce K. McKnight

    "The new H-W orebody was evaluated by considering its production at three technically feasible rates. Capital and operating costs were estimated f or each rate and production sequences were establishe

    Jan 1, 1987

  • CIM
    Current Exploratory Techniques In the Athabasca Bituminous Sands Area

    By W. B. Gallup

    "The Athabasca Bituminous Sands have been subject to sporadic investigations since the beginning of the century. It is probable, however, that much of what has been learned and achieved concerning the

    Jan 1, 1960

  • CIM
    New Approaches for Treatment the Blister Copper at the Codelco Norte Smelter

    By J. Font

    New approaches for the fire refining process of blister copper have been carried out at the Codelco Norte Smelter. These have been mainly focused on modification and improvement of the process configu

    Jan 1, 2007

  • CIM
    Patch Distress Detection in Asphalt Pavement Images

    By S. C. Radopoulou

    Pavement condition assessment is an indispensable constituent in maintaining roadway infrastructure. Current practices for pavement condition assessment are labor intensive which introduce subjectivit

    Aug 1, 2013

  • CIM
    Don’t Give Up on the Greenfield Projects: The First 20 Years of Nickel Extraction from Cuban Laterites

    By Larry M. Southwick

    There have recently been executives at major metals companies who have recommended that Greenfield Projects not be pursued. Greenfield includes not only new geographical locations, but also new techno

    Jan 1, 2014

  • CIM
    Techniques for Measuring Rockmass Bulking Around Tunnels in Highly Stressed Brittle Rocks

    By C. Groccia

    As the search for new ore bodies drives mines to be developed at greater depths, the associated high stress environments present challenges for rock support design. Excavations in highly stressed brit

    Aug 1, 2013

  • CIM
    Hydraulic Fracturing of Large Igneous Rock Samples under Triaxial Compression

    By M. Feinendegen, Ph. Siebert, C. Clauser, K. Willbrand, M. Ziegler

    "Three institutes of RWTH Aachen University collaborate on laboratory tests and numerical simulations of hydraulically driven fractures in igneous rocks. The project´s target is to enhance the underst

    Jan 1, 2015

  • CIM
    Determination of Refractory and Castable Quality in Operating Industrial Furnaces, Using a Stress Wave Reflection Technique

    The quality of refractory bricks and castables could be determined by direct measurements of their material properties such as elastic properties, porosity, density, etc. using conventional static or

    Jan 1, 2005

  • CIM
    Vanadium Electrolyte Cost and Purity Considerations for Vanadium Redox Flow Battery Applications

    By Maria Skyllas-Kazacos

    The All-Vanadium Redox Flow Battery that was pioneered and has been developed at the University of New South Wales (UNSW) in Sydney since the mid-1980s is currently regarded as one of the most attract

    Jan 1, 2014

  • CIM
    Using Directional Long Hole Drilling Underground to Maximize Ore Definition and Minimize Surface Exporation Drilling of Inconsistent Uranium Deposits

    By Kenneth L. Graham

    Horizontal directional drilling from existing underground workings will greatly reduce, if not replace, surface exploration drilling. Diminishing ore reserves along with increasing difficulty in acqui

    Aug 1, 2010

  • CIM
    Development of the Drumbo Mine: A new gypsum mine in Ontario

    By R. C. Hartviksen

    "The Drumbo Mine is a new gypsum mine located at exit No. 32 of Highway 401 between Woodstock and Kitchener, Ontario. The flat-lying 6-foot (1.8-metre) bed of gypsum is near the base of the Silurian S

    Jan 1, 1983