Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Phosphate deposits in British Columbia

    By Z. D. Hora

    Sedimentary phosphate-bearing rocks are found over a considerable area of so utheastern British Columbia that extends from Fernie east to the Alberta-British Columbia boundary and from the Internation

    Jan 1, 1984

  • CIM
    A Solution of Fault Problems

    By G. Vibert Douglas

    It often happens that the field geologist encounters a fault in ground where there is little to guide him with regard to the throw, or vertical displacement, and the heave, or horizontal displacement.

    Jan 1, 1928

  • CIM
    Simulator Features

    Train on Different Equipment - * Immersive?s interchangeable cabin controls technology - ?clip on & off? * Change Simulator from one machine to another in minutes * No technical expertise require

    May 1, 2003

  • CIM
    Nanocrystalline Cellular Materials

    By G. D. Hibbard

    New regions of material property space can be accessed by combining microstructural design at the nm-scale with architectural design at the µm- or mm-scale. In the first case, large strength increases

    Jan 1, 2010

  • CIM
    Recent Studies in the Porcupine Area

    By M. E. Hurst

    SINCE 1934 there has been a marked revival of interest in the Porcupine district, especially in the eastern portion of the area, where exploration on the property of Pamour Gold Mines has indicated th

    Jan 1, 1936

  • CIM
    Paymaster Mine

    By T. A. Lazier, C. S. Longley

    "Paymaster Consolidated Mines, Limited, owns several groups of claims in various parts of the Porcupine district. The area in which mining has been carried on includes parts of lots 5, 6, and 7, con.

    Jan 1, 1954

  • CIM
    The clay products industries of Ontario (5957d9bc-4126-437f-966b-b9a7c64fbbca)

    By G. R. Guillet

    "Bricks made from local Paleozoic shales, and floor and wall tiles made from imported clays, both established record production volumes in 1985 and are the strongest segments of Ontario 's clay p

    Jan 1, 1988

  • CIM
    Automatic Particle Size and Rod Mill Tonnage Control at Craigmont Mines Ltd.

    By C. B. Webber, L. S. Diaz

    "The paper presents the approach taken by Craigmont Mines to grinding circuit control. A detailed description is given of a fully automatic control system which bases its control actions on the contin

    Jan 1, 1973

  • CIM
    The Implementation of Machine Guidance Technology at Highland Valley Copper

    By D. Mark Richards

    Highland Valley Copper is a large open pit copper mine in the southern interior of British Columbia. Machine guidance technology using the Global Positioning System (GPS), was first implemented at the

    May 1, 2001

  • CIM
    Waste Land to Biofuel Source

    By Alan S. Lock

    Large scale feasibility studies for the establishment of oil-seed and cellulose producing crops on mine tailings have been successfully conducted over 1 growing season with the purpose of these crops

    May 1, 2009

  • CIM
    The Behaviour of Copper during the Dissolution of Metallic Nickel in Cuso4 Solutions

    By L. V. Volkov

    The equilibrium of the CuO-Cu20-Cu+-Cu2+ system with various chloride ion concentrations in solution in the presence or absence of an oxidant was investigated. It is shown, that, regardless of the pre

    Jan 1, 2007

  • CIM
    Pumping of Phosphate Slurries

    By Floyd B. Bowen

    Pumping methods are used, almost exclusively, to transport materials in the mining, beneficiation and chemical processing of phosphate rock in the Florida phosphate pebble field. Matrix pumping system

    Jan 1, 1963

  • CIM
    Performance of Reserve Estimation Techniques in the Presence of Extremely High-grade Samples, Jasper Gold Mine, Saskatchewan (4c486184-e69a-4889-9aef-ca3d719f6647)

    By Chris M. Healey

    "The Jasper Gold mine in northern Saskatchewan produced a total mill feed of 140 127 tonnes at an average grade of 19.0 g/t Au. Both diamond drilling and chip samples from underground workings returne

    Jan 1, 1993

  • CIM
    Evaluating Decision-Focused Stakeholder Consultation at EKATI Diamond Mine

    By Andrew Thrift

    Overview ? Problem ? Research question ? Literature review ? Methodology ? Results ? Discussion and recommendations ? New developments Problem ? Increasingly higher expectations ? Inadequate

    May 1, 2006

  • CIM
    Pervasive Sensor Network for Real Time Environmental Monitoring in Construction Sites

    By A. Carbonari

    In order to gain competitiveness and compete at a global level, construction companies should improve their efficiency. The problem is even more relevant in the construction field, whose work processe

    Aug 1, 2013

  • CIM
    A new initiating system and its testing instruments

    By Liu Liching, Yan Hongjiu

    "In China, the electromagnetic induction initiating system f or blasting engineering has been greatly developed in recent years. With this system, the total number of detonators that may be blasted in

    Jan 1, 1988

  • CIM
    Integrating Work Index into Mine Planning at Large Scale Mining Operations

    By Jose A. Caceres

    Mine planning and mineral processing optimization are usually treated as two unconnected problems, especially at open pit and panel caving mines where the cut-off grade is practically the only variab

    May 1, 2004

  • CIM
    La Route Vers L'objectif Zéro E.A.

    By J. Petit, P. Girard, A-M. Gilbert, D. Faucher

    L'annee 2000 a été une année stratégique et significative pour l' Aluminerie de Bécancour dans la réduction des gaz a effets de serre. L' équipe s' etait donne comme defi un jour d

    Jan 1, 2006

  • CIM
    Oil Recovery by Mine Drainage

    By John L. Rich

    A New Field for the Mining Industry A new field for the mining industry is in prospect. This is the recovery of the petroleum which has been left in the ground in the older oil fields whose yield

    Jan 1, 1927

  • CIM
    Infrastructure Development in Highly Jointed Ground at the New Afton Block Cave Mine

    By Ferrin Prince

    New Gold?s New Afton mine is an 11,000 tonne per day block caving mine, located 8 km west of the city of Kamloops, British Columbia. The reserve is estimated at 52.5Mt with grades of 0.65 g/t Au and 0

    Aug 1, 2013