Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Reflections on 150 years of coal geology investigations by the Geological Survey of Canada in the Atlantic Provinces

    By Peter A. Hacquebard

    "The early history of the Geological Survey of Canada is closely connected with coal geology investigations in the Atlantic Provinces. In 1843, Sir William Logan, the first director of the Geological

    Jan 1, 1992

  • CIM
    Generation of sulphur dioxide in blasting at Fox Mine

    By E. N. Durussel

    "The Fox Mine has been producing copper/ zinc ore since 1970 at a rate of approximately one million tons per year, and until 1978all production was derived from longhole open stopes. In June 1978, a t

    Jan 1, 1981

  • CIM
    Factors Influencing the Residence Time Distribution in Continuously-Fed Batch-Tapped Furnaces

    By Q. G. Reynolds, R. T. Jones

    "Residence time distributions are well defined for batch and continuously stirred reactors. However, there exist many smelting furnaces that do not fit either of these classifications. A mathematical

    Jan 1, 2012

  • CIM
    Conflict Impact Assessment Between Objects in a BIM System

    By Yi-Chun Lin

    Mechanical/Electrical/Piping (MEP) systems, due to their complexity and diversity, are the most intricate part of building construction. This being the case, Combined Services Drawings (CSD) and Struc

    Aug 1, 2013

  • CIM
    Inhibiting acid mine drainage throughout the mine life cycle

    By David A. Orava, Richard C. Swider

    "The technical knowledge and practical experience accumulated by industry and others in abating acid mine drainage (AMD) is being proactively applied at every phase of the mine life cycle. This paper

    Jan 1, 1996

  • CIM
    An Improved Elasto-Plastic Model for Underground Explosions

    By M. Jiang, X. Fan, W. X. Chen, Z. K. Guo, H. H. Zou

    "Some improvements are carried out for elasto-plastic model by taking the shear dilation effects and relaxation effects of deep rocks into accounted. The high pressure equations of states with Mie-Grü

    Jan 1, 2015

  • CIM
    FRP Challenges and Applications in Metals Processing

    By Rafic Moubarac

    FRP (Fiberglass Reinforced Polyester) equipment has been used in different and several applications during metals processing and extraction, and the hydrometallurgical process. Case histories of such

    Jan 1, 2015

  • CIM
    Copper in the Eastern Townships

    By John A. Dresser

    Seventy years ago a period of prospecting and mining activity began in the Eastern Townships of Quebec that seems to have been quite equal to that of recent years in the Rouyn field. In the following

    Jan 1, 1928

  • CIM
    Inclined slicing of a thick coal seam in ascending order — A case study

    By D. Sharma, A. K. Singh, R. Singh, P. K. Mandal, M. Sarkar

    "This paper deals with the stability investigations carried out at the XIVth seam of Jitpur colliery. The study was conducted to investigate the possible causes of roof cavity formation and face spall

    Jan 1, 2002

  • CIM
    The Nature and Distribution of Tantalum-bearing Minerals in Newly Discovered, Rare-Element Pegmatites at the Musselwhite Mine, Northwestern Ontario

    By Richard P. Taylor, Rod Henham

    Abstract - Newly discovered pegmatites distributed throughout the sub-surface environs of the Musselwhite Archean gold deposit occur as narrow dikes that intrude most of the major lithological units.

    Jan 1, 2001

  • CIM
    Nor-Acme Mine (38a3a98c-c47b-464f-b6c8-c0ff6e104948)

    By J. M. Harrison

    "The Nor-Acme gold mine is near the shore of Snow lake, northern Manitoba, about 75 miles east of Flin Flon. The claims that form the nucleus of the present property were staked in 1927 by C. R. Parre

    Jan 1, 1954

  • CIM
    Mixed Integer Programming Models for Intermediate Open Pit Scheduling with Variable Slopes

    By Hooman Askari-Nasab

    Open pit mine plans define the complex strategy of displacement of ore and waste over the mine life. The objective of the mine plan is to maximize the future cash flows within the technical and physic

    Oct 1, 2009

  • CIM
    Estimation of Hydraulic Conductivity of Underground Rock Cavern: A Case Study

    By Zhiye Zhao, Jianping Sun, Zhipeng Xu

    "The subsea rock cavern project is an underground storage facility. For cost-effective and safe excavation, the risk caused by the groundwater seepage into the rock cavern must be addressed. As one of

    Jan 1, 2015

  • CIM
    Geology of the Grand Lake Coalfield

    By W. J. Wright

    Summary Statement The following notes on the geology of the Grand Lake coalfield are intended to be introductory to a second paper being read at this meeting, which paper will describe the earlier an

    Jan 1, 1935

  • CIM
    Economic effects of ore losses and rock dilution

    By J. Elbrond

    "This paper describes qualitatively the progressive are losses and rock dilution in a mining project from the geological modelling to and including the concentration. A simple theoretical model of the

    Jan 1, 1994

  • CIM
    Design of liner plate culverts for underground mining environment

    By Roy EI. Durr, Glen R. Davidge

    "This paper presents the results of structural analyses and full-scale destructive tests conducted on liner plate culverts. The purpose of this work was to establish a design method and evaluate the s

    Jan 1, 1995

  • CIM
    Innovative CRF batch plant design at the Leeville Mine, Nevada

    By A. E. Reschke

    Optimized mine planning of the Leeville Gold Mine, Nevada, necessitated the requirement for an average of 2540 tpd of high quality cemented rockfill (CRF) in primary stoping blocks and underhand cut a

    May 1, 2007

  • CIM
    A Management System for Mine Reconciliation

    By Cesar Carrasco

    Mine reconciliation is the art and science of comparing predictions and real-world outcomes with the intent of revealing the true quality of performance of models, planning, mining, and mineral proces

    Oct 1, 2024

  • CIM
    A Numerical Validation of the Gnirk and Johnson Theoretical Solution for Petroleum Salt Wells

    By F. Mackay, S. A. B. da Fontoura

    "The theoretical solution for a viscoelastic well was presented by Gnirk and Johnson in 1964. From this an exercise was executed to validate the numerical simulation of a cemented salt well. The exerc

    Jan 1, 2015

  • CIM
    Renewable Power at Remote Mining Sites

    By Michel Carreau

    Presentation topic Introduction to Renewable Power in Remote Mining Industry Trend What are the Challenges and How to address them Acceptability (Management Buy-in) ? RP not core business to mi

    May 1, 2013