Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Two-Stage Treatment of High Arsenic Synthetic Mine Water at Cold Temperature

    By A. L. Mackie

    Arsenic is a highly toxic element and a known human carcinogen. It is often a contaminant in mine water discharges, particularly from gold mining and roasting operations, and has been found at concent

    Aug 1, 2013

  • CIM
    Reasonable Prospect of Economical Extraction: Tools for Underground Mineral Resource Classification

    By Juan Asalgado

    The JORC and NI43-101 codes impose that mineralized material has a reasonable prospect of economical extraction to be classified as Mineral Resource. For deposits close to surface and amenable to op

    Oct 1, 2009

  • CIM
    Anode materials for H2S-powered SOFC

    By V. Vorontsov

    Catalysts Mo-Ni-S were prepared by combining MoS2 and NiS in weight ratios 1:1, 1:2, 1:4 and 2:1, each of which was admixed with 5%wt Ag and 5%wt YSZ to increase three-phase boundary surface area of t

    Jan 1, 2005

  • CIM
    Chrysotile Asbestos in Munro and Beatty Townships, Ontario

    By N. W. Hendry

    ABSTRACT Exploration by geophysical methods and diamond drilling of an occurrence of chrysotile asbestos, located ten miles east of Matheson, Ontario, was commenced on March 25th, 1949, by the Canadi

    Jan 1, 1951

  • CIM
    Mining M&A 2012 and 2013 Down, but not out

    By Stephen Mullowney

    Outline ? Setting the stage ? Deal activity ? Q1 2013 update ? Key deal sectors ? Deals by geography ? Outlook for 2013 Key Observations 2012 ? Major retreat in M&A activity ? Glencore-Xstra

    May 1, 2013

  • CIM
    The Precipitation of Copper from Mine Waters at Britannia Mines, B.C.

    By F. Ebbutt

    The copper-bearing waters now treated successfully at Britannia for the recovery of their copper content are almost entirely derived from what is known as the Fairview mine; this was the first extensi

    Jan 1, 1928

  • CIM
    Triboelectric Belt Separator for Beneficiation of Fine Minerals (7c0f424f-bf39-4e9b-b33a-0b61d3ae8f89)

    By F. J. Hrach, S. A. Gasiorowski, J. D. Bittner

    "Separation Technologies, LLC (ST) has developed a processing system based on triboelectric charging and electrostatic separation that provides the mineral processing industry a means to beneficiate f

    Jan 1, 2012

  • CIM
    The State of the Art in Separating and Purifying the Heavy Rare Earths: Solvent Exchange, Ion Exchange, and Solid Phase Extraction, Which is the Optimal Process?

    By R. Hammen, J. Lifton

    "The purification of rare earth elements (REE) at mining operations is traditionally accomplished by multiple chemical phase-transfer processes including precipitation, solvent extraction, and ion exc

    Jan 1, 2012

  • CIM
    Geology of Allard Lake Ilmenite Deposits

    By Paul Hammond

    Abstract The Allard Lake ilmenite deposits, which are currently being developed on a large scale, occur as a series of dykes or lenticular, flat-lying bodies within the northeastern part of a large

    Jan 1, 1949

  • CIM
    Conversion from Open Pit to Underground Mining at the Munro Mine

    By Gordon W. Parsons, Ross E. Sampson

    "THIS PAPER will trace the work done in bringing the Munro underground ""A"" •Orebody into production to replace the open pit, which was scheduled to be completed early in 1959. Included will be an ou

    Jan 1, 1960

  • CIM
    Use of the Similarity Principle in Predicting the Optimum Performance of Iron Reduction Kilns

    According to the principle of similarity, the physical and chemical configurations of a system can be defined by ratios of magnitudes within the system and do not de-pend on the size or nature of unit

    Jan 1, 1964

  • CIM
    OPSCAP Victor Project's Transition to Operations

    By Brian Rausch

    Agenda ?? Refresher: Victor Project Execution ?? Operations Capability roadmap: ? Operations staffing starter group: design participation ? Operations staffing build up for production start-up ?

    May 1, 2009

  • CIM
    Stratigraphic and Lithogeochemical Characterization of Cycle Volcanism in the LG-3 Area

    By A. Hynes, T. Skulski, D. Francis

    The Archean volcano-sedimentary succession in the LG-3 area has undergone two phases of deformation and has been metamorphosed to upper greenschist and amphibolite facies. Marine, fine-grained sedimen

    Jan 1, 1984

  • CIM
    Concepts of Gearless Bali Mill Drives

    By P. Hale

    "The trend to drives of more than 10,000 hp on large-capacity ball and autogenous mills for increased operating efficiency has been limited by factors in the conventional drive system. A solution to t

    Jan 1, 1970

  • CIM
    Prospecting Areas of Northwest Manitoba

    By J. F. Wright

    INTRODUCTION Eighteen years ago about half a dozen experienced prospectors moved from northern Ontario to northwest Manitoba to prospect 'greenstone' areas shown on geological maps of .part

    Jan 1, 1931

  • CIM
    Open systems standards for computing in the mining industry

    By L. K. Daneshmend

    Key issues in managing information systems in the minerals industry will likely continue to be those relating to the integration and interoperability of disparate systems. This paper argues that, in o

    Jan 1, 2000

  • CIM
    The Use of •Chemicals in Mine Grouting

    By L. J. Cunningham

    I THINK it can be safely said that no mining operation, whetl1er open-pit or underground, is ever entirely free of water. It follows that every ton of ore bears a charge which represents, either direc

    Jan 1, 1962

  • CIM
    Influence of the CaO, Al2O3 and Fe3O4 Content in the Slag of the Isasmelttm Furnace at Southern Peru Ilo Smelter

    By E. Herrera, L. Mariscal

    "Ilo Copper Smelter operates since 2007 with an ISASMELTTM furnace as a single smelting unit (1,200,000 tpy) associated with two Rotary Holding Furnaces for separation of matte and slag, and which dir

    Jan 1, 2012

  • CIM
    Advanced Control Concepts for Mineral Dryers

    By J. C. Hawkins

    Determining moisture content and rate of flow of a solid product make measurement and control of dryers unusually difficult. This paper de-scribes a method of accomplishing this with readily made air-

    Jan 1, 1971

  • CIM
    A Systems Approach to Mineral Processing Based on Mathematical Programming

    By Alessandro Navarra, Amir Arash Rafiei, Kristian Waters

    Mathematical programming (MP) is fundamental to systems engineering and operations management, but has not been widely adopted by mineral processors. The current paper presents an interdisciplinary ap

    Jan 1, 2015