Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Geological and Hydrogeological Conditions for Forming Uranium Occurrences in the Froqlos-Jabal Abou Rabah Region, Palmyrides, Syria

    By R. Al-Hent, M. Aissa, J. Asfahani

    "This paper focuses on determining the favorable geological and hydrogeological conditions for forming uranium occurrences in the Froqlos-Jabal Abou Rabah region, Palmyrides, Syria. Eighty rock sample

    Jan 1, 2009

  • CIM
    Flotation Improvements in the Luzenac Penhorwood Talc Concentrator

    By Ross Byron, Ken Roberts

    "During the fall of 2001 a program was initiated to determine the feasibility of improving the metallurgy in the flotation circuit at the Penhorwood Talc Concentrator located near Timmins, Ontario. Be

    Jan 1, 2004

  • CIM
    Geology and Chemistry of the Low Ti Magnetite-bearing Heff Cu-Au Skarn and its Associated Plutonic Rocks, Heffley Lake, South-Central British Columbia

    By I. C. L. Webster, G. E. Ray

    "The magnetite-rich Heff Cu-Au skarn lies in the Quesnel Terrane of south-central British Columbia, approximately 26 km northeast of Kamloops. The skarn formed close to the northern margin of the Heff

    Jan 1, 2007

  • CIM
    Optimization of the paste backfill plant at Louvicourt Mine (930a856d-d697-4cc4-918f-5d8dfe68aeb0)

    By Jean Cayouette

    "In 1995, Louvicourt Mine started one of the first paste backfill operations in Canada. From 500,000 tonnes in 1995, the annual paste backfill tonnage produced reached 800,000 tonnes in 1999. The maxi

    Jan 1, 2002

  • CIM
    Arching Effects and Sillmat Behaviour

    By Euler De Souza

    This paper presents a study conducted to assess sillmat behaviour during undercut mining and to provide a comprehensive understanding of the effects of arching and sillmat thickness on stability. The

    May 1, 2002

  • CIM
    Agnico-Eagle Laronde Plant: Metallurgical Challenges Present and Future

    By Jean Cayouette, Paul Blatter, Paul Cousin

    "The Laronde mill was commissioned in 1988 and has been treating the Laronde Penna ore since 2000. The Laronde plant, situated in the Abitibi region of Quebec, has experienced mill expansions to accom

    Jan 1, 2011

  • CIM
    The Use of End Members for Grind – Recovery Modeling, Tonnage Prediction and Flowsheet Development at Raglan

    By L. Boyd, A. Charland, G. Potts, D. Fragomeni, N. O. Lotter

    "The Raglan orebody and concentrator has been the subject of study in Process Mineralogy at Falconbridge since 1998. (Lotter and Tuzun, 1998) The orebody is classified into three distinct textural gro

    Jan 1, 2005

  • CIM
    In-Situ Recovery in Hard Rock Applications: Idealistic Notion or Realistic Future Processing Option?

    By L. Vollert

    In-situ recovery of metals is presently experiencing a revival not seen since early applications in amenable copper oxide deposits, uranium and generally applications where neither, porosity and perme

    Jan 1, 2019

  • CIM
    Fugitive Dust Control at Porcupine Joint Venture – Dome Mine

    By John Folinsbee, Brian Danyliw, Tony Y. Chong

    "Control of fugitive dust has become increasingly important in the mining industry both from a health and safety and environmental standpoint. Mining operations in particular have required improved fu

    Jan 1, 2005

  • CIM
    Stope Sequence Optimization for Narrow Vein, Long Term Mine Planning

    By André van Wageningen

    Long term mine scheduling is one of the most difficult optimization problems. The problem is said to be NP-complete in that the best possible solution cannot be found any quicker than checking all pos

    Oct 1, 2004

  • CIM
    Industrial Validation of the Functional Performance Equation – A Breakthrough Tool for Improving Plant Grinding Performance

    By Robert E. McIvor

    The Functional Performance Equation for Ball Milling” was first presented in 1988. It now has been used successfully in more than a dozen mineral processing plants. This powerful, yet simple tool prov

    Jan 1, 2005

  • CIM
    Comminution Circuit Design Considerations (49th Annual Canadian Mineral Processors Operators Conference©, Ottawa, Ontario, January 17-19, 2017)

    By S. Rivard

    "This paper demonstrates the selection of grinding circuit technology for a number of recent projects including discussion of the key drivers and the role of energy efficiency. Decreasing head grades

    Jan 1, 2017

  • CIM
    Narrow vein mine design at the Hoyle Pond mine

    By John G. Henning

    The Hoyle Pond underground mine is located in the Porcupine Gold Camp, 18 km east of downtown Timmins. Since the initiation of production in 1985, the operation has produced in excess of 1.9 million o

    Oct 1, 2004

  • CIM
    Advanced Control for Column Flotation

    By G. A. Kosick, G. S. Dobby

    "This paper presents the principles and application of a recently developed control system for flotation columns and column circuits. The control system uses triple pressure sensors to directly sense

    Jan 1, 1990

  • CIM
    Economic Recovery and Upgrade of Metals from Middling and Tailing Streams (c573bdd5-90fc-4072-9ce3-2caa48051cb4)

    "As mine head grades decline and orebodies become more complex, traditional mineral processing techniques and flowsheets to achieve saleable concentrate become more difficult to design and construct.

    Jan 1, 2017

  • CIM
    Implementation of Stage Grinding at the Brunswick Mine Concentrator

    By J. Andrew Cornier, Mike Cooper

    "Upon successful completion of the AG/SAG Mill project (Cooper et al., 2001) the Brunswick Mine concentrator was configured with single line processing through the AG/SAG mill, followed by two paralle

    Jan 1, 2002

  • CIM
    Spiral Surface Property Investigation

    By X. Louw

    "This paper examines the change in surface properties of the Polyurea used on spirals at different operational times: unused spiral, 28 months in operation and 58 months in operation. This is being do

    Jan 1, 2017

  • CIM
    Information Strategy Planning on Nuclear Power Plant Project Management System

    By Son Hye Jin

    Abstract ? KHNP is participating in the construction of Nuclear Power Plant both in Korea and UAE. ? We want to improve our construction project management process. ? So we are now developing the

    Aug 1, 2013

  • CIM
    Implementation of mining-induced seismic hazard maps at Creighton Mine for risk assessment of rockmass damage due to mining at depth

    By Pavel Vasak

    The Laurentian University Virtual Reality Laboratory (VRL) has provided a unique platform for the development and testing of novel seismic and microseismic data processing and visualization technology

    Oct 1, 2010

  • CIM
    Bubble Load Measurement in the Pulp Zone of Industrial Flotation Machines - A New Device for Determining the Froth Recovery of Attached Particles

    By David Seaman, J-P Franzidis, Emmy Manlapig

    "A new device has been developed to directly measure the bubble loading of particle-bubble aggregates in industrial flotation machines, both mechanical flotation cells as well as flotation column cell

    Jan 1, 2004