Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    An Economical Vertical Transport System to Hoist 3 Mt of Ore per Annum from 1640 m

    By Wendy L. Naysmith

    This paper deals with the various options considered and factors that influenced the final selection of the headframe, shaft layout and hoisting systems required at the Impala No 16 Shaft in order to

    Oct 1, 2010

  • CIM
    Performance of Large Low- and High-Aspect Ratio SAG Mills at Gold Fields’ Ghanaian and Australian Mines

    By Michael I. Brittan, Craig M. Sams

    "Economies of scale and the variable characteristics of many large ore deposits have resulted in grinding installations using very large SAG mills fitted with variable speed drives. Low-aspectratio si

    Jan 1, 2006

  • CIM
    Flotation of Different Particle Sizes as a Function of Bubble Surface Area Flux

    By K. Honkivaara, S. Junnikkala, J. Aho, K. Föhr, P. Lampinen

    "Bubble area flux has been claimed to be a major tool to dimension flotation equipment. The paper describes laboratory scale (batch and 301 continuous cell using plant feed) and small-scale (1 ,8m3) i

    Jan 1, 2000

  • CIM
    Gyratory Crusher Wear Monitoring Using Laser Technology

    By Persio P. Rosario

    Crushing has proven to be of fundamental importance in mine mill integration at Highland Valley Copper (HVC). Highland Valley Copper has achieved large throughput and good quality control through the

    May 1, 2002

  • CIM
    The Evolution of Falcon Continuous Concentrators at Tantalum Mining Corporation of Canada

    By Claude Deveau

    "With ever decreasing feed grades, finer mineralogy and increased demand for product, it became obvious that a major step in equipment performance was required to reduce operating costs and increase p

    Jan 1, 2000

  • CIM
    Pilot Scale Testing of a Lead-Zinc Ore Aljustrel Project

    By Jeffiey B. Austin, Maurice Tagami

    "The ores of the Iberian Pynte Belt are typically massive sulphide ores with very fine grained mineral textures. EuroZinc Mining Corporation is currently evaluating one of the massive sulphide deposit

    Jan 1, 2000

  • CIM
    The Development of Gold Mining in Canada

    By G. E. Cole

    "Amongst the mineral products of Canada gold holds the second place in value of yearly output. . . . . .The production of gold has increased steadily during the past six years and has somewhat more th

    Jan 1, 1927

  • CIM
    Difficult Mining Conditions in 153 Orebody at a Depth of 4550 ft at Vale Inco?s Coleman Mine

    Vale Inco?s Coleman Mine 153 Orebody is a narrow vein deposit with a dip that varies from 30 to 70 degrees. It has a strike length of 1200-feet and the current mining extends from the 4250 level to 51

    May 1, 2009

  • CIM
    New Initiatives in Swedish Mining Research and Development

    By Göran Bäckblom

    The Swedish mining companies LKAB and Boliden, the equipment supplier Atlas Copco, the general contractor NCC and the specialist company Reflex joined forces in 2005 to advance the field of rock techn

    May 1, 2006

  • CIM
    Changing Company Culture

    By Frank B. Amon

    Highland Valley Copper had to make some significant changes in the way it was working in order to counter the effects of ever-increasing costs and decreasing metal prices. A mine/mill optimization pla

    May 1, 2004

  • CIM
    Assessing the Performance and Efficiency of Fine Grinding Technologies

    By Jan E. Nesset, Colin Hardie, Peter Radziszewski, Donald P. Leroux

    "The successful introduction of new high intensity stirred milling technologies (e.g. IsaMill, SMDetritor) to the mining industry in recent years prompted Noranda-Falconbridge to initiate a study comp

    Jan 1, 2006

  • CIM
    Stuck in Traffic and Boiling Over - Why project-level thinking can?t fix portfolio-level problems

    By Stuart Elliot

    Brownfield project portfolios are notoriously hard to manage. Day to day there is a constant stream of changes and challenges within projects and across the whole program. When the budget year is over

    Nov 1, 2011

  • CIM
    Wireless Communications in Mineral Processing Applications

    By Peter Metcalfe

    "Wireless communication in the mineral processing environment is not as simple as it is in the home or office environment. The correct design of a wireless network in the mineral processing environmen

    Jan 1, 2014

  • CIM
    Geostatistical Modeling of McMurray Oil Sands Deposits

    By Oy Leuangthong

    The McMurray formation in the Athabasca oil sands deposits of Northern Alberta is part of the world?s second largest proven crude oil reserves. The formation is characterized by stratigraphic layers t

    May 1, 2004

  • CIM
    Assessing the Total Cost of Representativity in Flotation Plants

    By D. Brand

    "The risk management objective of the AMIRA Code of Practice for Metal Accounting has seldom been systematically investigated in the literature up to the authors’ knowledge. Risk is defined in the Aus

    Jan 1, 2017

  • CIM
    A Comparison of Roasting Technologies for Arsenic Removal from Copper Concentrates

    By C. H. Lee, K. Adham, D. Lemieux, J. P. Mai, A. M. S. Hussein, S. Francey

    Copper concentrates contain an increasing amount of arsenic, as the older sources of cleaner ores are depleted. At the same time, the market-determined price penalties on arsenic rich concentrates are

    Jan 1, 2019

  • CIM
    Heavy Mineral Concentration from Oil Sand Tailings

    By Francis Chachula, Niel Erasmus

    "In 2002, Titanium Corporation Inc. focused its attention on the development of a process for the recovery of valuable heavy minerals, including zircon and titanium bearing minerals from oil sands fro

    Jan 1, 2008

  • CIM
    The Use of Charcoal as an Alternate Internal Fuel Addition in the Pelletising Process

    By Keith R. Vining

    Solid fuel, usually coke or anthracite, is commonly added to ground iron ore fines in the pelletising process to reduce the amount of burner fuel required and the maximum firing temperature, while mai

    May 1, 2007

  • CIM
    Perspectives on the scientific and engineering principles underlying flow of mineral pastes

    By Michael Li, Arie Moerman

    "Paste backfill as a means of supporting underground mining is gaining popularity. Despite this trend, engineering and design of mine paste backfill systems are still largely based on empirical method

    Jan 1, 2002

  • CIM
    Meadowbank Mine Process Plant Throughput Increase

    By J. Allaire, P. N. Muteb

    The Meadowbank mine is operated by Agnico-Eagle Mines Ltd. and is located in the Kivalliq District of Nunavut in northern Canada. The process plant operates presently at a throughput of 11,500 tpd wit

    Jan 1, 2013