Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    X-Ray-Transmission Sorting at the Kensington Gold Mine

    By A. Takala, H. Cline, D. Girard

    "This article describes the project development and successful implementation of a particle sorter at the Kensington mine. The Kensington underground gold mine and associated milling facilities are lo

    Jan 1, 2017

  • CIM
    Slag Fuming Process Intensification at Trail Operations

    By K. J. Heale, G. G. Richards, D. J. Rioux, R. L. Stephens

    Slag fuming has remained a key process for the recovery of Zn, Pb, and minor elements in the integrated flow sheet at Teck Cominco's Trail Operations for more than 75 years. Since the start-up of

    Jan 1, 2008

  • CIM
    Criticality-Based Model for Rehabilitating Subway Stations

    By M. Abouhamad

    According to the Canadian Urban Transit Association (CUTA), 140 Billion CAD is required to maintain, rehabilitate, and replace subway infrastructure between 2010 and 2014. The current practice adopted

    Aug 1, 2013

  • CIM
    The 1/9th rule—An assessment of the valuation and structure of Canadian exploration agreements 1988-1992 (51b0e26e-59d3-4b46-a72c-e2318102b450)

    By L. Kilburn

    "A survey of 281 mineral exploration agreements examines the ratios among three ways that may be used to purchase an interest in a mineral property, viz: pay cash, pay shares and make future expenditu

    Jan 1, 2005

  • CIM
    The Fluosolid Roaster at Campbell Red Lake Mines, Limited

    By J. B. McKay

    It is the purpose of this paper to present an initial report on the construction and operation of the Fluo-Solid roaster at the property of Campbell Red Lake Mines, Ltd., Balmertown, Ontario. The roa

    Jan 1, 1951

  • CIM
    Coal mining practices at Kaiser Resources Ltd.

    By G. K. Livingstone

    "This paper describes mining conditions in the Kaiser surface and underground coal mines in the Sparwood area of southeastern British Columbia. Mining methods are explained, major mining equipment is

    Jan 1, 1980

  • CIM
    A Novel AG-Crusher-HPGR Circuit for Hard, Weathered Ores Containing Clays

    By P. P. Rosario

    A research project was conducted at the University of British Columbia (UBC) resulting in the development and evaluation of a novel comminution circuit incorporating autogenous grinding and parallel t

    Jan 1, 2012

  • CIM
    Optimal Oxygen Allocation to Maximize Copper Smelter Throughput

    By Alessandro Navarra, Roberto Parra, Boyd Davis, Frank Mucciardi

    A smelter scheduling algorithm has been developed, which allocates the oxygen production between the smelting furnace and the converter aisle, so as to maximize copper throughput. The algorithm is i

    Jan 1, 2015

  • CIM
    Closing the Loop Using Actual Concentrator Performance to Determine the True Value of Ore Sources

    By Adrian Dance

    The Antamina orebody is a geologically complex, polymetallic skarn located in the Peruvian Andes. A range of copper and copper-zinc ores are campaigned separately through the concentrator producing co

    May 1, 2003

  • CIM
    The Behavior of Carbonaceous Matter in Gold Extraction

    By H. Tan

    The effect of carbonaceous matter on gold extraction was investigated in cyanide systems with pure gold as well as pre-robbing sulfide gold ores. Auger studies demonstrated that the carbonaceous matte

    Jan 1, 2005

  • CIM
    Reducing Energy Consumption by Alternative Processing Routes to Produce Ferrochromium Alloys from Chromite Ore

    By Arthur Barnes, Mika Muinonen, M. J. Lavigne

    "The carbothermic reduction of chromite ore to produce high carbon ferrochromium is among the most energy intensive metal extraction processes performed, due not only to the highly endothermic nature

    Jan 1, 2015

  • CIM
    Controlled Precipitation of Nesquehonite (MgCO3.3H2O) by the Reaction of MgCl2 With (Nh4)2CO3 At 303 K

    By Y. Wang

    In this study, homogeneous (unseeded) precipitation of nesquehonite (MgCO3.3H20) by the reaction of MgC12 with (NH4)2CO3 in supersaturated solutions at 30 °C was investigated. Factors which influence

    Jan 1, 2007

  • CIM
    On the Relationship Between Gold Mineralization and Ultramafic Volcanic Rocks In the Timmins Area, Northeastern Ontario

    By D. R. Pyke

    Many of the gold deposits in the Timmins• area show a close spatial association to ultramafic metavolcanics. Available analytical data suggest that ultramafic rocks contain significantly higher gold c

    Jan 1, 1976

  • CIM
    Metallization in the Caledonian Belt, Southern New Brunswick - A Geological and Geophysical Investigation

    By A. A. Ruitenberg, G. Ruitenberg, J. Chandra

    "The Caledonian Belt is mainly underlain by Late Precambrian and possibly Early Palaeozoic rocks, which are in part overlain by younger strata. Most of these rocks are weakly deformed, except for thos

    Jan 1, 1972

  • CIM
    Morenci Hyrometallurgical Process Improvement - Application Of Six Sigma In Process Improvement

    By R. Blosser

    Phelps Dodge introduced a process improvement model known as Quest for Zero in 2001. In 2004, the focus of Quest for Zero shifted from corporate-led initiatives to projects led by site personnel. The

    Jan 1, 2007

  • CIM
    Geological Setting and Characteristics of the Red Chris Porphyry Copper-gold Deposit, Northwestern British Columbia (ca399b4d-6ba4-48c8-871a-229dc866c010)

    By C. H. Ash

    "The Red Chris Cu-Au deposit (522.7 Mt at 0.35% Cu and 0.27 g/t Au), northwestern British Columbia, is one of several pre-accretionary porphyry systems in the Cordillera of westernCanada. It is hosted

    Jan 1, 1997

  • CIM
    New Hydraulic Fracturing Initiation Model Considering Plasticity and Penetrating Effect

    By Songgen He, Jianchun Guo

    With the development of complex, unconventional and deep reservoirs, it shows that many rocks behave plastically with the influence of clay and confining pressure. Traditional linear elastic hydraulic

    Jan 1, 2015

  • CIM
    Effects of Milling Time, Si Content and Heat Treatment on Microstructure and Magnetic Properties of Mechanically Alloyed Fe-Si Powders

    By Madaah Hosseini H. R., P. Abachi, S. Miraghaei

    In this study, the effects of milling time, chemical composition and heat treatment on microstructure and magnetic properties of nanocrystalline Fe-Si (6.5-25 at.% Si) alloys prepared by mechanical al

    Jan 1, 2006

  • CIM
    Energy Conservation for the Mining Industry

    By E. Howard Lambert

    "Operating costs of mining plants are increasing due to the increased cost of labour, materials and fuels. Labour and materials costs are factors not readily controlled. However, the use of energy fro

    Jan 1, 1973

  • CIM
    Capacity and Product Quality Optimization of the Syama Roaster

    By T. Kerr, C. Mattich, J. Wilson

    "In refractory gold concentrates, gold is occluded in sulphide minerals preventing efficient cyanide leaching. Hence, roasting is used to oxidize sulphur and organic carbon, the latter being necessary

    Jan 1, 2017