Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Standard TCP/IP Networks for Mine and Equipment AutomationBy Christoph Mueller
Broad band mine communication today is characterized mainly by individual solutions, which have in common their long development phases and their high cost for development, operation and service. The
May 1, 2002
-
Valuation of Mineral Exploration Properties Using the Cost Approach (78edf0e1-150b-42aa-9fed-be830237414c)By William E. Roscoe
"Mineral exploration properties are those on which an economically viable mineral deposit has not yet been discovered. Such properties are bought, sold, optioned and joint ventured on the basis of the
Jan 1, 2003
-
Application of biotechnology for treatment of nitrogen compounds in gold mill effluentsBy W. D. Gould, A. Kapoor, K. Morin, P. Bédard
This paper presents the results of a research study that is being conducted by the Mine Effluents Program, Mining and Mineral Science Laboratory (MMSL), Natural Resources Canada aimed at evaluating bi
Jan 1, 2004
-
Development and Implementation of an Operating Concept and Training Program for the Start-Up of the Stanleigh MillBy H. Ewaschuk
"INTRODUCTIONRio Algom's Stanleigh Mill in Elliot Lake began production in June of 1983. The highly instrumented mill treats uranium ore at an average rate of 3900 metric tons per day. To help ensure
Jan 1, 1985
-
Techniques for Coarse-Particle Beneficiation of Some Gold Ores and Methods of Determining Potential for Sorting Any Gold Ore Deposit."By Steve Wilkinson
"""Techniques for coarse-particle beneficiation of some gold ores and methods for determining potential for sorting any gold ore deposit.""With the advent of high speed computers, laser technology end
Jan 1, 1985
-
Metallurgy of the Mt. Milligan Porphyry Gold/Copper DepositBy A. B. Cron, R. MacPhail, L. Melis, K. Armstong
"Mt. Milligan is a porphyry gold/copper deposit in north-central British Columbia. Diluted and mineable drill-indicated reserves total 449 million tons at an average grade of 0.013 oz gold/ton and 0.1
Jan 1, 1991
-
Recent Advances and Applications of Radiometric and Photometric SortingBy J. R. Goode
"Coarse ore sorting is here defined as the physical separation of a mixture of coarse (+3/8 inch) ore particles into two or more separate groups of total value greater than that of the unsorted ore. A
Jan 1, 1975
-
Creating sustainability at AntaminaBy S. D. Botts, F. Cantuarias
"The Antamina project, owned by BHP Billiton Plc, Mitsubishi Corporation, Noranda Inc., and Teck Cominco Ltd., is a $2.3 billion copper/ zinc project, located in the Ancash Department of Peru. The pro
Jan 1, 2003
-
Experiences from an IREDES prototype project — Production drilling with Atlas Copco’s Simba L6C drill rig at LKAB Kiruna mineBy U. Olsson, M. Ramström
"The IREDES1 Special Interest Group (SIG) for drill rigs has been active since its launch during MineExpo 2000 in Las Vegas, Nevada, United States. SIG for drill rigs is responsible for the developmen
Jan 1, 2005
-
The Changing Role of HydrometallurgyBy B. Meddings, O. J. I. Evans
"This paper is mainly concerned with the present and probable future role of hydrometallurgy in the production of base metals.The economic and technological bases of the hydro-metallurgical plants bui
Jan 1, 1971
-
Flotation Copper Recovery from Converter Slag of the Sarcheshmeh Khatoonabad SmelterBy A. Eslami
When producing high grade mattes in smelter plants, copper losses in the slag are inevitable. Hence, the recovery of copper from slag has been the focus of many research projects, copper flotation bei
Jan 1, 2007
-
Mocca: A Grinding Circuit Control ApplicationBy C. Larsen, D. Fragomeni, A. Vien, D. G. Fisher
"MOCCA is a Multivariable Optimal Constrained Control Algorithm developed specifically for non-square industrial control applications with practical difficulties such as interactions, time delays, con
Jan 1, 1991
-
Diamond exploration targets, Michipicoten greenstone beltBy A. C. Wilson
"In 1991, local prospector C. “Mickey” Clement recovered at least three alluvial diamonds from the Michipicoten River. Two of these stones were sent to the Department of Mineralogy, Royal Ontario Muse
Jan 1, 2004
-
Follow-up of Production Equipment Availability and its Contributing Factors in Selected Canadian Underground MinesBy Edith Lafontaine
Modern underground mines operate fleets of mobile production equipment including drill jumbos, long-hole drills, load-haul-dump machines, trucks and bolters. Their availability has a substantial impac
May 1, 2007
-
Towards AG/SAG/ball mill on-line performance monitoringBy S. Caron, P. Radziszewski
Industrial practice in mineral processing shows that an important problem in understanding and monitoring in-mill parameters is due to the lack of fundamental knowledge and appropriate sensors. Howeve
Jan 1, 2004
-
Gold "Preg-Robbing" by Pyrite: Natural and Process InducedBy Stephen L. Chryssoulis
"""Preg-robbing"" of gold by carbonaceous matter during the cyanidation of certain types of carbonaceous gold ores is well documented. Recent studies established that ""preg-robbing"" of gold is not l
Jan 1, 1997
-
Participative Management at the Golden Giant Mill, A Co-Ordinators PerspectiveBy K. Barr, F. Grenier, J. Hettinger
"To reach the Hemlo Gold Inc. objective of becoming the lowest cost, safest Canadian gold producer while causing no environmental damage, management embarked from its inception on a strategy to build
Jan 1, 1988
-
Evaluation of the Tower Mill as Regrind MachineBy J. M. Menacho, J. M. Reyes
"Batch and continuous regrind tests were conducted in 3 kW and 15 kW tower mill units, respectively. Single particle size classes of a chilean copper sulphide concentrate were employed in the batch te
Jan 1, 1989
-
Integrating Geometallurgical Parameters into Mining Grade Control at Operating MinesBy William Shaw
Conditional simulation is now an accepted tool for managing ore block design at a number of operating mines. It provides a way to consider the quality of data, local continuity and economic risk in de
Oct 1, 2009
-
Capturing unrealized capacityBy M. W. Lewis
A mine's inherent capacity is dictated by factors such as equipment, design, people, processes, and environment. Actual production may approach, but never surpass, the inherent capacity limit. Th
Jan 1, 2004