Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Geochemical and Mineralogical Characterisation of Two Contrasting Waste Rock Dumps ùThe INAP Waste Rock Dump Characterisation Project

    By P Fines, D J. Williams, G W, S Miller

    This paper presents the results and findings of geochemical and mineralogical testwork conducted on samples collected from waste rock dumps at two mine sites, located in South Carolina, USA (Site 1) a

    Jan 1, 2003

  • AUSIMM
    The Preparation, Storage, and Placing of Hydraulic Fill, C.S.A. Mine, Cobar

    To provide suitable backfill material for the cut and fill mining method being used to extract ore from the C.S.A. mine, flotation tailings are deslimed in single stage cyclones. The sand fraction is

    Jan 1, 1969

  • AUSIMM
    The Rosebery Mine Underground Refrigeration Project

    By G Newling

    Zinifex Rosebery Mine is a lead-zinc underground mining operation located at the base of Mount Black, on the West Coast of Tasmania. Mining activities at the Rosebery Mine have been undertaken for ove

    Jan 1, 2008

  • AUSIMM
    Potential Impact of Alternative Rock Excavation Technologies on Mine Performance

    By Hood M

    Rock cutting excavation technologies and particularly continuous excavation technologies, can offer benefits in the areas of reduced costs, higher revenue and increased safety in a variety of mining

    Jan 1, 1995

  • AUSIMM
    Evaluation of Heavy Medium Cyclone Performance at the Hamersley Iron Mount Tom Price Concentrator

    By Gomm SA

    The Mount Tom Price Concentrator, which contains a heavy medium cyclone plant for beneficiation of the -6+0.5mm fraction of low grade iron ore, is described. Testwork was carried out on an opportun

    Jan 1, 1987

  • AUSIMM
    Mining Over 100 Stopes Per Year? ù The Perilya Broken Hill Approach to Mine Planning

    By C Mroczek, B Mitchell

    Perilya Broken Hill, from its inception, has budgeted for more than 2.0 million tonnes per year from the Southern Operations. This tonnage was planned to come from in excess of 100 stopes per year in

    Jan 1, 2005

  • AUSIMM
    High-Grade Supergene Enriched and Exotic Copper Deposits in the Sepon Mineral District, Lao PDR

    By S Smith

    Several styles of copper (Cu) mineralisation are present at Sepon. Large tonnage, low grade skarn and carbonate replacement massive sulfide mineralisation occur within the metamorphic aureole of Permi

    Jan 1, 2008

  • AUSIMM
    Caving Technology Development and its Application by Newcrest Mining Limited

    By A Logan, B Cuthbert

    Brown and Chitombo (2007) indicated that during the last two decades, the international mining industry has been using mainly mass mining methods to extract safely and economically some of the importa

    Jan 1, 2008

  • AUSIMM
    Field Characterisation of Two Full-Scale Waste Rock Piles

    By D J. Williams, G W. Wilson, S, A B. Tran

    A comprehensive field program was implemented to evaluate the internal structure and hydrology of two full-scale waste rock piles. The excavation of waste rock dumps for in-pit disposal at the two min

    Jan 1, 2003

  • AUSIMM
    Estimating the Remaining Fatigue Life of Stockyard Machines

    By S Rice, A Midlin

    Many of the stacking and reclaiming machines employed in the mining industry today are operating in ways that were never envisaged in the days before they were commissioned, with greater throughput, i

    Jan 1, 2007

  • AUSIMM
    Evolution of Mining and Current Practices in the Prince Lyell Orebody, Mount Lyell Mining and Railway Company Limited

    By Kennewell G. J

    This paper aims to present the evolution of the mining method in the Prince Lyell orebody. Initial strategy and practical experience are detailed as are the reasons for and benefits of changes to the

    Jan 1, 1992

  • AUSIMM
    Bendigo Mine Grade Control

    Bendigo is AustraliaÆs second-most productive goldfield, having produced some 22 million ounces of gold between 1851 and 1954. Bendigo Mining Limited (BML), the sole lease-holder of the Bendigo Goldfi

    Jan 1, 2006

  • AUSIMM
    Dioxin Emissions from Metallurgical Processes and Their Reduction

    The Japanese Government promulgated the æLaw Concerning Special Measures Against DioxinsÆ on 16 July 1999 and it was enforced on 15 January 2000. This is a unique law specialised to protect the enviro

    Jan 1, 2002

  • AUSIMM
    Decision Analysis in the Mining Industry

    By Bond W. F, Sharry P. V, Onley P. G

    The use of Decision Analysis is becoming more widespread in industry as a whole, and there is considerable scope for its application in the mining industry. Wherever decisions have to be made, whene

    Jan 1, 1996

  • AUSIMM
    Status of Canadian In-Mine Diesel Particulate Filter Field Trials

    By Enga B. E

    Following considerable laboratory studies concerning diesel particulate control systems for underground use, a Canadian program was initiated to implement practical, real-life systems. This progra

    Jan 1, 1988

  • AUSIMM
    Coal Sizing Equipment - Expression and Presentation of Result of Performance Tests

    By Partridge AC

    In order to provide a'valid description of the performance of size classifying equipment it is necessary that a standard procedure be established for testing and for the subsequent expression

    Jan 1, 1984

  • AUSIMM
    Reclaimed Lignite Mining Areas A73 in Lusatia - Development of Soil Physical Parameters of an Agricultural Site within the First Years after Site Reconstruction

    By J Krnmmelbein, T Raab

    In Lusatia, lignite mining causes major disturbances on the landscape scale. Reclamation procedures are applied to recover the reconstructed landscape for different land use options. In this study we

    Jul 10, 2012

  • AUSIMM
    Filtration Efficiency, Secondary Emissions and Reliability of Particle Filter Systems in Underground Workplaces

    By J Czerwinski, M Kasper, M Wyser, N Heeb

    The VERT project 1993 - 1998 laid the technical foundation for curtailing the emission of fine particles from diesel engines at Swiss underground workplaces. The targeted maximum was 100 ¦g/m3 EC. Ext

    Jan 1, 2005

  • AUSIMM
    Integrating North American Shaft Sinking Practices into Australian Operations ù Telfer Hoist Shaft Development

    By P Bonniwell

    As a part of the Newcrest, Telfer Expansion Project, a consortium of Australian, Canadian and South African Mining Contractors in joint venture have been contracted to develop the hoisting shaft. The

    Jan 1, 2005

  • AUSIMM
    The Weipa Kaolin Project

    Comalco Limited has recently completed construction of a $50 million kaolin plant at the site of its bauxite mining and industrial minerals operation at Weipa. The plant will produce 100,000 tonne

    Jan 1, 1986