Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Canadian and American Guidelines on Ore Reserve Reporting, and a Comparison with those Proposed for AustraliaBy McCarthy J
In both the U.S.A. and Canada regulations concerning the reporting on mineral resources and especially ore reserves have been established. The regulations are virtually identical for the two countri
Jan 1, 1987
-
Use of Alkaline Industrial Wastes and Mine Tailings to Neutralise Acid Mine DrainageBy I Doye
Acid mine drainage is a serious environmental problem caused by the oxidation of sulfide minerals responsible for highly acidic, sulfate and metals-rich drainage. Several methods of mine waste managem
Jan 1, 2003
-
Water-related Data Requirements for Improved Life Cycle Assessment of Mining, Mineral Processing and Tailings ManagementBy G Mudd, N Haque, S A. Northey
Life cycle assessment (LCA) provides an internationally standardised framework for estimating the environmental impacts associated with products or services (International Organisation for Standardisa
Jun 28, 2016
-
Elouera Colliery Mine Access - Design of a Portal and Tunnel in Soft GroundBy H Bleuler
A new portal and access drift was constructed by Concrete Constructions for BHPÆs Elouera Colliery, south of Wollongong.The portal area at the base of the Illawarra Escarpment is in soft colluvium mat
Jan 1, 1999
-
Integrating Blastholes into Exploration Data to Improve Coal Recovery and ModellingBy H Stedman
Integrating exploration and operational blastholes into one database significantly enhances geological modelling. Benefits include: improved coal predictions, stronger interpretation of structurally c
Aug 18, 2014
-
Water ù The New Precious Resource: Planning, Management and Allocation Queensland-StyleBy G Milligan
This paper describes how water is being planned, managed and used in Queensland as both a precious natural resource, vital for healthy ecosystems, and as a valuable tradeable commodity, necessary to s
Jan 1, 2003
-
Extractive Companies, Development and Environmental AgendasBy B Harvey
Achieving community and stakeholder endorsement during life-of-mine planning and implementation requires a business-connected approach, as opposed to charitable giving, disconnected offsets and enviro
Jul 16, 2014
-
The Geometry of the Heavy Sulfide Zone - A Challenge for Mine Planning and Geotech at GrasbergBy S C. Sc, J Young, N Belluz, D Nicholas
The heavy sulfide zone (HSZ) of the Grasberg deposit has the geometry of a funnel and is located at the contact of the mineralised intrusive and the relatively barren sedimentary rock types. The geome
Jan 1, 2007
-
A Computer Network for the Extended Analysis of Data from a Computer Controlled Electron Probe MicroanalyserBy Penney B. K, Baghdadi A. A
An electron probe micro-analyser, controlled by a dedicated mini-computer,has been operating at Imperial College since 1970. The data assessment capability of the computer was limited and, in order
Jan 1, 1977
-
Structure and Tectonics of the Continental Crust: Evidence from Deep Seismic Reflection Profiling by CocorpThe past decade has seen a great increase in activity in deep seismic reflection profiling of the continental crust. Some 20 countries have conducted field experiments and the total length of dee
Jan 1, 1987
-
Murrin Murrin Heap Leaching ProjectBy N Meadows, M Rodriguez
A 200 000 tpa heap leach demonstration plant was approved by the Murrin Murrin Joint Venture (MMJV) in December 2005 and engineering commenced in January 2006. The demonstration plant will utilise sto
Jan 1, 2006
-
Occupational Health and Safety as Part of Enterprise BargainingToday's emphasis on the enterprise bargaining process must be seen as an opportunity for organisations to further develop occupational health and safety standards at work. In particular, this s
Jan 1, 1995
-
Mining - The Environmentalists' ViewpointThe paper examines the difficulties encountered by objectors to mining privilege applications. It describes the various involvements of the environmental defence society in the mining controversy and
Jan 1, 1981
-
Tarong Power Station Ash Thickening PlantBy C Hertle
GHD-Black & Veatch (GHD-BV) have completed design and specification of the ash thickening plant at Tarong Power Station, including operation of a pilot plant. Construction of the plant is in progress
Jan 1, 2003
-
On the stability of CaS in liquid steel containing alumina or spinel inclusionsBy N N. Viswanathan, D Kumar, S Kumar
In secondary steelmaking, calcium treatment is practised to modify the solid alumina or spinel inclusions into liquid or partially liquid calcium aluminates. It has been seen that the dissolved calciu
Jun 19, 2024
-
A comparison of CPT based state parameter estimates in coal boiler ashBy B Wentzinger
This paper presents the results of state parameter estimates in an active coal boiler ash storage facility using the most recent methods currently in use for cone penetrometer interpretation. State pa
Jul 1, 2021
-
Design Of Longhole Open Stoping At New Broken Hill Consolidated Limited With Particular Reference To Sloped Wall MiningThe progress of longhole open stoping (LHOS) at The Zinc Corporation, Limited and New Broken Hill Consolidated Limited (ZC/NBHC) is described. The design of a novel sloped wall longhole stoping me
Jan 1, 1983
-
Study of Sinter Microstructure with Various Blend Ratios of Fortescue Metals Group FinesBy J Zhou, X Bi, Y Yan, W Peng, H Yang, D Weng, P Li
Fortescue Metals Group (FMG) fines from Western Australia is a hematite and limonite mix characterised by high crystal water content. Due to its higher supply capacity and lower prices, the Wuhan Iron
Aug 12, 2013
-
Developments in Underground Coal Mining Technology and their ImplicationsDevelopments in mining technology are outlined which point out that longwall face technology has the capacity to produce 20,000t/d on a regular basis. The optimum length of longwall faces is about
Jan 1, 1988
-
Ulan Highwall ProjectHIGHWALL MINING - DECISION TO MINEUlan had completed operations in the first Open Cut area due to high stripping ratios and the presence of geological features which destroyed a significant portion of
Jan 1, 1998