Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Resin Encapsulated Rock Bolt Practices at Mount Isa MinesBy I Thin, I Sheppard
Resin encapsulated rock bolting practices have been adopted by Mount Isa Mines since the early-1980s. Fully encapsulated rock bolt systems meet designated requirements for long-term ground support in
Jan 1, 2002
-
Sumps Aids The Broken Hill Proprietary Company Limited In Saxonvale Feasibility Study (4f6b06bb-7b16-41b9-9052-ce170d293140)By Kukla G. T
A Seam deposit User oriented Mine Planning System (SUMPS) was developed by The Broken Hill Proprietary Company Limited (BHP) at its head office in Melbourne. It is one of the computer mine plannin
Jan 1, 1980
-
Fundamental Study on Fracturing Grouting for Shaft Lining Reinforcement at Deep Alluvium Seam in Eastern ChinaMany problems result when coal mine shafts are built in complicated geological conditions and serious shaft lining ruptures have often occurred in the eastern part of China since 1987. Grouting is app
Dec 6, 2010
-
Optimizing A Bore Core Evaluation Test ProgrammeThe drilling and evaluation of bore cores provides the best available statistical basis for characterizing a coal prospect. Important, long-term decisions by management frequently must be based on
Jan 1, 1977
-
Computer Animation of Hot Spot Development in Bulk Coal as an Aid for Training Coal MinersBy B B. Beamish, M S. Kizil
The processes that take place during the development of a heating are difficult to visualise. Bulk coal self-heating tests at The University of Queensland (UQ) using a two-metre column are providing g
Jan 1, 2005
-
Development of the All-Flotation Process at the Zinc Corporation Limited, Broken Hill (Reprint)The ore mined from the Lead Lode of The Zinc Corporation leases consists of a fairly granular mixture of galena, marmatite, chalcopyrite, tetrahedrite, pyrrhotite, pyrite, and lollingite with a gangue
Jan 1, 1994
-
Water ù The New Precious Resource: Planning, Management and Allocation Queensland-StyleBy G Milligan
This paper describes how water is being planned, managed and used in Queensland as both a precious natural resource, vital for healthy ecosystems, and as a valuable tradeable commodity, necessary to s
Jan 1, 2003
-
A Model-Based Methodology for Steady State and Dynamic Optimisation of Autogenous and Semiautogenous Grinding MillsBy Lo YC, Pate WT
In recent years there has been a great deal of interest in ways to optimise the performance of mineral processing plants. This paper describes a methodology developed for optimisation of autogenous
Jan 1, 1993
-
Muddy Waters à the Song Not the Singer ù A Legislative Setting for Water in MiningWater is important commodity in the mining industry. Water is used in the many stages of mining from the exploration stages and drilling, to mine development and operation and finally throughout mine
Jan 1, 2003
-
On the Application of the Method of Exhaustion in Seeking a Proper Formula for Discharge EstimationIn order to do the discharge estimation better, it is valuable to find out appropriate formulas for estimating discharge in various pits, based on accumulating data, summarizing discharge patterns
Jan 1, 1988
-
Construction and Commissioning of the Lebong Tandai Gold Mine and Treatment PlantBy West RF, Pooley RH
An underground mine, a treatment plant and supporting facilities have been constructed at Lebong Tandai in Sumatra, Indonesia by PT Lusang Mining. Throughput is initially 50,000 tonnes per annum
Jan 1, 1986
-
Awak Mas Gold ProjectBy Tuite M. J, Woolcock L. J
The Awak Mas gold project is located in the Province of South Sulawesi, Republic of Indonesia. It is situated 300 km by road north of the provincial capital of Ujung Pandang. The capital is readily
Jan 1, 1996
-
Qualitative Simulation of Continuous-Flow Technology and Working Face Complexes for Underground Mining of Hard OresBy G A. Streltsova
In the paper the main concept of qualitative simulation is determined when computer-aided designing and forecasting of designs of robotised continuous-flow working face complexes for underground minin
Jan 1, 2003
-
Sampling for Anything - The Roles of Particulate and Time-Wise Material Heterogeneity in Sampling System DesignIn the last 100 years, statistical sampling theory for particulate materials has developed to a stage where sampling systems can be confidently designed to provide assay results of known and controlle
Jan 1, 2002
-
Resource Estimation Approaches for Several Precious Metal Deposits Developed by Placer Group on the Pacific RimThe process of resource estimation of large precious metal deposits is illustrated by reference to major deposits now being mined or developed by Placer.The estimation procedure commences with buildin
Jan 1, 1990
-
Sublevel Open and Fill Stoping Method used in the Hedong Gold MineBy Yushan Ma, Jiqing Wang, Hanyi Jia
The Hedong Gold Mine is located in the Yantai area, Shandong province, China. It is an underground mine with an annual gold output of some 700 000 grams. The orebody is located on the edge of the Wang
Jan 1, 1998
-
Potential Benefits of Underground Processing for the Gold Sector û Conceptual Process Design and Cost BenefitsBy G Cormack
By designing comminution circuits for mineral liberation rather than the final recovery process and by using high mass pull gravity recovery, the concept of underground processing has become a reality
Jan 1, 2008
-
The results of supplementary sampling to evaluate suitability of the instrumentation for monitoring of DPM concentrationBy S Sabanov
Supplementary sampling of particulate mass concentration, the number concentration and the average particle diameter of nanoparticles using a TSI Dust-Trak DRX Aerosol Monitor, Naneos Partector 2 has
Oct 12, 2022
-
Feasibility Study Estimation of In-Situ Resources and Recoverable Ore Reserves for the Boddington Gold MineBy El-Ansary M
Estimation of in-situ resources and recoverable ore reserves for the Boddington Gold Mine feasibility study was done by applying an essentially "classical" ore reserve method. This relied completely
Jan 1, 1987
-
The Development of a Continuous Copper Drossing Process for Lead Bullion (e832ca00-fad1-4d25-a701-ac8072a9e7d1)The first stage in the refining of lead blast furnace bullion is the removal of copper and is normally done as a batch process in open kettles.A number of attempts have been made to establish continuo
Jan 1, 1963