Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Rock Fall Protection Barrier at Mill Area of PT Freeport Indonesia - ABSTRACT ONLY

    The mill area of PT Freeport Indonesia is located in a valley surrounded by steep natural slope, characterised by extreme topography with mountains rising to above 4500 m within 100 km from the seasho

    Nov 25, 2010

  • AUSIMM
    Atomic Force Microscopy ù A New Characterisation Tool for Flotation Research

    By B M. Moudgil

    Atomic force microscopy (AFM) has become an important tool for understanding the nano- to molecular scale mechanisms predominant in multiphase systems. In flotation research, the use of AFM holds pro

    Jan 1, 2005

  • AUSIMM
    Contour banks in spoil rehabilitation – a matter of timing

    By J L. Merritt

    Contour banks and waterways are standard soil conservation measures to assist farmers reduce the impact of gully erosion on sloping cropping land by reducing the slope length to the interval between t

    Jul 25, 2018

  • AUSIMM
    Autogenous Grinding in the Warrego Concentrator of Peko Mines N.L.

    By Stevenson C. H, Lynch A. J

    The reasons for choosing autogenous grinding for the new Warrego concentrator of Peko Mines N.L. are discussed and the ores to be treated in the concentrator are described. The mill was designed on t

    Jan 1, 1974

  • AUSIMM
    A Methodology for Rock Mass Characterisation to Control Blast-induced Vibrations

    By A Karrech, E Hamdi

    The uncertainty of geomaterials properties is commonly encountered in resource engineering applications, especially in mining engineering where the rock mass texture, joints, fractures and damage zone

    Aug 24, 2015

  • AUSIMM
    Geology, Metallurgy and Mining Engineering - Why We Must Strengthen the Links

    Recent well-publicised problems with the start-up of new mining projects have continued to feed the perception that the mining business in general and Ore Reserves in particular are a poor risk. New m

    Jan 1, 2002

  • AUSIMM
    Ice-drilling and ground characterisation on the moon for space mining

    By H S. Shin, H Jin, B H. Ryu, J Lee

    Prospecting ice on the Moon necessitates drilling systems to obtain subsurface samples and measure the composition of ice deposits. Landers and rovers equipped with drilling equipment are essential fo

    Sep 1, 2024

  • AUSIMM
    Optimisation of Hydraulic Filling for Underground Disposal of Tailings in Peru

    By D M R Stone

    Failings di,posal presents many challenges at metal mines in Peru where the extreme relief yields very little useable land area. These challenges are amplified by other hazards such as the high seis

    Jan 1, 1998

  • AUSIMM
    Visualising risk – proactive is better than reactive

    By S Withell, K Sheehan

    Whitehaven Coal (WHC) is undergoing a transformative journey, deeply committed to the principles of a High Reliability Organisation (HRO) and the establishment of a mature, interdependent culture foun

    Apr 16, 2024

  • AUSIMM
    Development of a Near Field Damage Model for Cemented Hydraulic Fill

    By G P. F Chitombo

    The dilution of blasted ore with cemented backfill materials has been recognised as a significant factor influencing the economics of some underground metalliferous mining operations. Several mechanis

    Jan 1, 1998

  • AUSIMM
    Trucking, Rail or Conveyor?

    By R B. Venugopal, P Staples

    The selection of the mode of transport for moving bulk materials is never a simple task as there are various concerns/considerations applied to the selection of the most practical and cost-effective m

    Jan 1, 2005

  • AUSIMM
    Estimation of rock brittleness for jointed specimens under cyclic triaxial loading

    By P Khalkho, M Singh

    Rock masses when subjected to uniaxial or triaxial cyclic loading (eg in hydraulic running tunnels, during retrieval and injection of oil and gas from storage underground caverns and haulage roads), t

    Nov 29, 2022

  • AUSIMM
    BHP Port Hedland wind fence – innovations in dust control

    By R Peiffer, L van Wyk

    The Port of Port Hedland is the largest bulk export terminal in the world and is one of Australia’s most important pieces of economic infrastructure. BHP is the largest Port user to support the export

    Sep 18, 2023

  • AUSIMM
    When Does Further Processing at the Mine Site Make Sense?

    By G Lane, S La Brooy

    A century ago, new mines were often accompanied by smelters. In Australia, smelters were built at the Daydream mine near Broken Hill, at Kuridala and Mount Elliott near Mount Isa, Broken Hill, Mount L

    Jan 1, 2008

  • AUSIMM
    Increasing Mine Profitability ù Technical Partnership to Reduce Coal Loss

    By D Hope, D Mitchell, B Metcalfe

    In recent years there has been a major change among mining companies in their mining methods. This has been driven by the need to increase shareholder value and optimising the value from an operation.

    Jan 1, 2001

  • AUSIMM
    Water Systems for Distributing Cooling in Deep South African Gold Mines

    By De Carvalho J

    The average installed refrigeration capacity on South African gold mines has increased by about eighteen per cent annually for the past 15 years; both the number of installations and their duties h

    Jan 1, 1988

  • AUSIMM
    Are our closure planning and regulatory processes adequate to identify, quantify and appropriately transfer residual risks after successful mine rehabilitation?

    By P B. Swart, P D. Erskine

    Despite an increasing focus by media, communities and activists driving an elevated regulatory focus in Australia and indeed some other mining jurisdictions, the mining industry globally has had limit

    Jul 25, 2018

  • AUSIMM
    Planning, Investigation and Preliminary Design for the Eastern Distributor Tunnels - Sydney

    By Chappel R. A, Fishburn B. R

    The Eastern Distributor Tunnels - the first major road tunnel project in Australia - are the preferred solution to traffic congestion problems, when compared with alternatives, in this inner urban

    Jan 1, 1987

  • AUSIMM
    The Use of the Vanyukov Process for Processing Nickel Containing Charge

    By Sorokin M, Komkov A, Fyodorov A

    The Vanyukov Process is a high-intensity smelting system that has been proven over the last 20 years for various metallurgical operations including the smelting of copper, nickel, copper-zinc, antim

    Jan 1, 1996

  • AUSIMM
    The Oscillating Disc Cutter - The Breakthrough Tool for Continuous Rock Excavation

    By X Li, H Alehossein

    The oscillating disc cutter (ODC) is an innovative technology for the continuous excavation of hard rock. This paper will discuss:the reasons for its development;its method of operation;current experi

    Jan 1, 1999