Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    World-class mine planning for a sustainable future in Kazakhstan Mining

    By C Catania

    Mining companies and operations across the globe typically target best practice financial management, along with a focus on economically driven mine plans. Not only is this inherent in running a succe

    Jul 25, 2018

  • AUSIMM
    Natural Semiconductor Minerals as Visible Light-Induced Photocatalysts Applied for Pollutant Degradation

    By A Lu, C Wang

    The natural semiconducting mineral rutile and sphalerite exhibited highly photocatalytic activities on degradation of methyl orange under visible light irradiation. The isomorphous substitutions of ho

    Jan 1, 2008

  • AUSIMM
    Goonumbla: 25 Years, Four Deposits, 52 Prospects and Still Drilling...

    The Central West of New South Wales is emerging as a significant metallogenic province. The development of Northparkes Mines (North Limited) and the Cadia Hill deposit (Newcrest) are establishing N

    Jan 1, 1997

  • AUSIMM
    A reliable solution for pumping mineral froth with challenging froth volume

    By A Roudnev, P Loderer

    Mineral froth pumping utilising centrifugal slurry pumps is a major engineering challenge for both the end users and pump manufacturers. The traditional approach has been to oversize the pump for pump

    Aug 29, 2018

  • AUSIMM
    Optimisation & Control Development For An Expanded Grinding Circuit In NHBC Concentrator

    By Marsham B, Baker D. C

    The expansion of New Broken Hill Consolidated Limited (NBHC) concentrator necessitated the installation of hydrocyclone classifiers where rake classifiers had previously been used. Commissioning o

    Jan 1, 1983

  • AUSIMM
    HydroCopper<sup>«</sup> ù A New Method for Treating Copper Concentrates

    By E Yll÷, O HyvSrinen

    Outokumpu has developed a new chloride leach process, called HydroCopper«, to treat copper concentrates. Chalcopyrite is quite refractory in leaching and in sulfate milieu an autoclave of high tempera

    Jan 1, 2005

  • AUSIMM
    Measuring ore quality using real-time on-belt elemental analysis – more than grade control

    By H Kurth

    Mining geologists utilise many technologies to map, sample, measure, model and plan before and during the mining process. Predicted ore quality rarely corresponds with feed quality determined by proce

    Sep 20, 2017

  • AUSIMM
    Computing for the Exploration and Mining Industries to the Year 2000

    By Henley S

    The year 2000 is not very far ahead - only five years. It should not be hard to forecast what will happen between now and then, because the technologies that will be in practical use then should al

    Jan 1, 1995

  • AUSIMM
    Operational Management of Underground In-Seam Drilling Sites

    By ZáWang, F Hungerford, T Ren

    Operations in an underground drill site have to co-exist within the mineÆs ventilation and operational system. The space requirements of a drilling operation have to be adapted to the limitations prov

    Jul 1, 2013

  • AUSIMM
    A risk-based approach to drainage design standard selection for mine rehabilitation and relinquishment

    By A Densten, C Gimber

    Surface water management and drainage is a key aspect of mine rehabilitation and closure planning. In the authors’ experience, drainage related problems are amongst the most common forms of failure in

    Jul 25, 2018

  • AUSIMM
    Mineralogical Face-Mapping Using Hyperspectral Scanning for Mine Mapping and Control

    By L Whitbourn, K Yang, P C, E Ramanaidou

    The potential of hyperspectral mineral mapping within a mine environment is demonstrated. Central to this capability has been the development of portable or vehicle-mounted, hyperspectral mine face-ma

    Jan 1, 2006

  • AUSIMM
    The Role of Computers in Preparing Graduates for the Mineral Industry

    A philosophy is presented that new graduates in mining and metallurgy should be equipped to use computers during their under- graduate courses, should be aware of the capabilities and costs of a wi

    Jan 1, 1977

  • AUSIMM
    Case Histories – Roller Compacted Concrete Dam Waterproofing with a Bituminous Geomembrane in Chile and a Tailings Dam in Peru Subject to an Earthquake of 8.1 Magnitude

    By R McIlwraith, B Breul

    Two case studies are presented in this paper. The first one discusses a roller compacted concrete water supply dam that was constructed in El Mauro in Chile to provide water for agriculture activities

    Jul 27, 2015

  • AUSIMM
    The hidden path to sustainable mining – an incentive for transforming scope 3 emissions across industries

    By K Sherry, N Shahbazi

    Scope 3 emissions are a set of often overlooked indirect greenhouse gas emissions within a company’s value chain and represent the majority of emissions for many sectors. These emissions arise from ac

    Sep 1, 2024

  • AUSIMM
    A Decision-making Framework for Water Supply and Flood Protection Options in Net Present Value Terms

    By H J. J Boshoff, A J. Karrasch

    Mine planners frequently face the challenge of mitigating the impact of climatic events on mining operations, such as floods and droughts. Specific water management infrastructure can be implemented t

    Jun 28, 2016

  • AUSIMM
    The Challenges of Success

    Mining in the twenty-first century brings with it a new range of challenges, some unfamiliar to our industry. Skilled staff recruitment and retention is a significant issue. Equipment supply lead time

    Jan 1, 2007

  • AUSIMM
    Reassessing Rehabilitation Objectives and Targets for Mature Mining Operations in Queensland

    By T R. Anderson, A R. Butler

    Haymont (2012) notes that in parts of Australia significant areas of mining disturbance cannot be relinquished. In Queensland it has been estimated that by 2010, just 0.3 per cent 507 ha of mining dis

    Jun 28, 2016

  • AUSIMM
    Blast Optimisation for Downstream Processes - Heavy ANFO in Small Diameter Holes

    Whilst employed by Dyno Nobel as the Technical Services Engineer û Brisbane, I was asked, as part of a contractual agreement, to look at optimising PioneerÆs blasting process to provide the most effec

    Jan 1, 1999

  • AUSIMM
    Multi-source data fusion for geological boundary modelling via Gaussian Processes

    By K L. Silversides, A Chlingaryan, A Melkumyan

    Multiple data sources can be fused to improve boundary modelling in stratified deposits such as the banded iron formation (BIF) hosted deposits in the Pilbara Region of Western Australia. Accurate bou

    Mar 22, 2022

  • AUSIMM
    Water treatment in perpetuity – or not?

    By R J. Higgins, M Edraki

    What is the meaning of the Life of a Mine (LOM) if that mine results in a requirement for water treatment in perpetuity? ‘In perpetuity’ is of course a duration with no relationship to a Life-of-Mine

    Jul 25, 2018