Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    In support of frontline leaders

    By A Kite

    Frontline leaders play a critical role in the safe and productive operations of Australia’s mining, resources and heavy industries. These leaders set the workplace culture, especially during night shi

    May 5, 2022

  • AUSIMM
    The Shrinking Coal Market in the US – Sample More or Sample Less?

    By S A. Campbell

    There has been a reduction of coal production in the United States due to environmental pressure and the increased use of natural gas. This reduction will require coal producers and consumers to make

    Jul 29, 2014

  • AUSIMM
    Heap Leaching

    The preferred alternatives in heap design and their motivation are identified as- -normal heap leaching, to be generally applied wherever possible, - flooded vat leaching, to be appliedwhere wetted or

    Jan 1, 1984

  • AUSIMM
    Technical Developments from 100 Years of Lead Smelting at Port Pirie

    This paper presents a summary of the technical achievements of the Port Pirie Smelter in 100 years of lead smelting and refining. It also aims to give where possible the reasons or circumstances th

    Jan 1, 1989

  • AUSIMM
    Waste Rock Pile Construction to Lower Closure and Relinquishment Costs

    By J R. Taylor, J A. Muchan, S M. Pape, B S. Davis

    Acid and metalliferous drainage (AMD) is routinely derived from waste rock, tailings, pit wall rock, underground mine voids, heap leach pads, ore stockpiles, concentrate stockpiles and even slag piles

    Jun 28, 2016

  • AUSIMM
    Planning and Investigation of the Airport Link Tunnel and Northern Busway, Brisbane

    By T Peglas, A de Aboitiz

    The Queensland Government, via the special purpose company vehicle û City North Infrastructure Pty Ltd û is currently developing BrisbaneÆs Airport Link underground toll road and Northern Busway (Wind

    Jan 1, 2008

  • AUSIMM
    Real-time Through-belt Moisture Analysis for Iron Ore

    By A Harris, L Balzan

    Accurate measurements of the moisture content of iron ore have increasing importance in modern mining operations. Knowledge of the moisture content allows process control actions to be carried out to

    Jul 13, 2015

  • AUSIMM
    Proactive Strata Control Management at Anglo American Metallurgical Coal Australian Open Cut Operations

    Anglo American Metallurgical Coal (AAMC) manages five open cut coal mines in Queensland and New South Wales, producing approximately 30 million tonnes per annum. The size and complexity of these mines

    Nov 25, 2010

  • AUSIMM
    Commissioning and Process Development of Pipeline and Port Operations at Pasminco Century

    By D Hodder, M Hoskins, A Rofe

    Pasminco Century MineÆs slurry pipeline was commissioned in November 1999. It currently transports zinc and lead concentrate slurries in batch form to the Port facility, 304 km away in the Gulf of Car

    Jan 1, 2003

  • AUSIMM
    Development of Trials for Rehabilitation of a Bucket Wheel Excavator Spoil Dump

    By Walton S, Wheeler D. J, Sargent D. M, Ting L. Y

    Goonyella-Riverside mine is an open cut coal mine in Central Queensland. One component of the mining operations at this site is an uncompacted spoil dump some 50 m above the natural ground surface and

    Jan 1, 1992

  • AUSIMM
    Empowering tailings operators through education

    By D Brett

    The Paper presents the authors thoughts on how the mining industry should be improving the education of site personnel so they can provide a greater level of effective control of tailings dam safety i

    Jul 1, 2021

  • AUSIMM
    Do You Understand Your Legal Obligations in the Industry?

    Most new engineers in the mining industry do not realise the importance of legal obligations. During investigations the first question you are asked is: Do you have any proof or evidence? The smallest

    Jan 1, 2007

  • AUSIMM
    Mining Reconciliation in Long Hole Open Stopes at George Fisher Mine

    By J J. Grobler

    The George Fisher Underground Mine at Mount Isa applies the long hole open stoping methodology. During the reconciliation process of transverse stopes in the George Fisher North mine it was identified

    Mar 21, 2011

  • AUSIMM
    Gold Process Mineralogy and its Significance in Gold Metallurgy

    By Y Gu

    Based on the mode of occurrence, gold is classified into three categories: microscopic gold, submicroscopic gold and surface-bound gold. Microscopic gold, or visible gold, refers to gold minerals in w

    Jan 1, 2008

  • AUSIMM
    Underground Mine Fire Prevention at the South Mine, Broken Hill

    SINCE 1900, five underground fires of consequence have beenrecorded in the Broken Hill mines. These occurred at the Junction(1906), Proprietary (1906 and 1916), Block 14 (1906), and Centralmines (1923

    Jan 1, 1929

  • AUSIMM
    Introduction of Autonomous Loaders to Olympic Dam Operations, Australia

    WMC Resources Ltd has been involved the development and trialling of an automated load haul dump vehicle system since 1997. This paper describes the introduction of the system into the Olympic Dam Ope

    Jan 1, 2005

  • AUSIMM
    Application of Infrared Spectral Data for Predictive Modelling of Alteration-Mineralisation Systems

    By S Pontual

    The use of spectral data has traditionally been for obtaining mineral information and for mapping out alteration systems. The output from these data is typically in the form of mineral assemblages and

    Aug 22, 2011

  • AUSIMM
    The Seismic Monitoring Decision at Mt Charlotte Gold Mine

    By Poplawski R. F

    A 32-channel PSS seismic monitoring system was commissioned at Mt Charlotte mine in 1994, and at the time it was the first such system in Australian mines. The system continuously observes the occur

    Jan 1, 1995

  • AUSIMM
    The role of liberation in physical separation techniques

    By A Gray

    Physical separation features in almost every mineral processing circuit. The category encompasses a broad range of techniques and technologies including hydrocyclones, gravity concentration methods (i

    Sep 11, 2017

  • AUSIMM
    Ventilation Design for Xstrata Copper's Ernest Henry Underground Project Prefeasibility Study

    The Ernest Henry Mine is an open pit copper-gold mining operation located in north-west Queensland, Australia. It is owned and operated by Xstrata Copper with a current concentrator throughput of appr

    Jan 1, 2008