Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Taming the dragon – the art of transitioning from reactive to proactive tailings management through strategic operator engagement

    By C N. Hatton, K Ward

    Tailings operations are inherently reactive as operations personnel continuously contend with a concentrator reject feed (tailings) transient in physical and engineering properties, which places a con

    Jul 1, 2021

  • AUSIMM
    Dynamic influences of optimisation on emissions

    By P J. Bangerter, J Pan

    Optimising for Net Present Value (NPV) with a strategic optimiser such as COMET, Prober-E, Blaser or Minemax has hitherto lacked a dynamic method for analysing the so-called third-order outcomes (such

    Aug 2, 2023

  • AUSIMM
    Zircon Trace Elements and Sr-Nd-Pb-Hf Isotope Systematic of the Halasu Porphyry Cu Belt, North-east Xinjiang, China

    By C Wu, H Chen

    "An EXTENDED ABSTRACT is available for download. A full-length paper was not prepared for this presentation.The Halasu porphyry copper belt, located in the East Junggar basin bounded by Chinese Altay

    Mar 18, 2015

  • AUSIMM
    Obstacles to Embedding Geometallurgy Decision-Making into Operations and how to Increase Maturity of this Critical Capability

    By G McCullough, B Mutsaers, J Jessop

    "*This is an abstract only* Geometallurgical initiatives have demonstrated considerable value to operations that have trialled them. However, it is extremely difficult for these initiatives to become

    Sep 29, 2013

  • AUSIMM
    Risk Assessment of Consumables Supplies Management in Mines

    By M J. Pejovic, S BoÜevski, I Miljanovic, M Hudej, A Milutinovic, A Petrovski

    The paper deals with the problem of managing the supplies of consumables (energy resources, lubricants, explosives, explosive supplies, tires, spare parts, etc) in mines. After the introductory remark

    Sep 26, 2011

  • AUSIMM
    From ‘closing a mine’ to ‘transitioning a community’ – evolving from specific post-mining land-uses to a holistic post-mining vision

    By A Maier, M Goldner, C Gimber

    Given the ongoing global crises of climate change and nature loss, with the World Economic Forum (WEF) identifying them as the top risks to global economies in terms of both likelihood and impact in t

    Aug 2, 2023

  • AUSIMM
    Measuring the influence of a sublevel cave on open stoping at Telfer

    By J Maxlow, M J. Woods, M P. Sandy

    The Newcrest Mining Limited Telfer operation comprises both open pit and underground operations producing gold and copper. The underground operation is made up of three production areas, the sublevel

    Nov 29, 2022

  • AUSIMM
    Performance Enhancing Blends – Concentrator Feed Blending at Iron Magnet

    By M Darvall

    Magnetite ore blending has yielded signifi cant performance improvements in OneSteel’s magnetite concentrator. The magnetite concentrator beneficiates magnetite ore from the Iron Magnet Deposit and pr

    Jul 11, 2011

  • AUSIMM
    Landscape-scale Assessment of Watercourses in Remote Arid South Australia to Inform Mine Planning to Mine Closure

    By K White, C Ferguson, M Harding

    Understanding watercourses and river processes at a landscape scale is vital for managing risk to mining infrastructure and operations as well as minimising future environmental impacts beyond the lif

    Jun 28, 2016

  • AUSIMM
    Interactive Modelling and Visualisation of Large Deposits Using Linear Octrees

    Large deposits present computational challenges to todayÆs commercial orebody modelling systems that are based on conventional block models. We describe a system that is specifically engineered to mod

    Sep 26, 2011

  • AUSIMM
    The Backfilling Philosophy for Massive Mining at Depth in the South Deep Section, Western Areas Gold Mine

    By A J. MacDonald, M P. Raffield

    The South Deep massive orebody consists of 20 to 30 m of payable conglomerates ranging in dip from 11¦ to 20¦ and at depths of between 2400 m and 3400 m. The mine design process selected a mining meth

    Jan 1, 1998

  • AUSIMM
    Coal Mine Modernisation and Production Reliability in China

    By Jiang G

    The Chinese Central Government attaches great importance to the development of its coal industry. Besides carrying out the policy of simultaneous development of large, medium and small coalmines,the m

    Jan 1, 1991

  • AUSIMM
    Chlorination of Titaniferous Feedstocks

    By H Aral, L Malishev

    The carbothermic chlorination of titaniferous materials such as rutile, synthetic rutile (SR), upgraded slag and ilmenite in a fluidised bed is an established commercial process. In this work, ilmenit

    Jan 1, 2000

  • AUSIMM
    Draw Control at Premier Mine

    By K Nesbitt

    Draw control at Premier Mine is considered important to avoid conditions of isolated draw, which results in early waste ingress, compaction of the kimberlite ore and loss of ore reserves. The Premier

    Jan 1, 2000

  • AUSIMM
    A Fractal Approach for Mineral Breakage

    By J A. M Luz, A T. Bernardes

    HukkiÆs law is an empirical law, which does not take into account several events of energy loss during the fragmentation processes. Since experimental results are very difficult to obtain, for a large

    Sep 26, 2011

  • AUSIMM
    Exploration and Mining – The Need for Innovation

    By J F. H Thompson

    "An EXTENDED ABSTRACT is available for download. A full-length paper was not prepared for this presentation. Mineral exploration and mining are challenging businesses. Remote and at times harsh condit

    Mar 18, 2015

  • AUSIMM
    Preparing for Progressive Mine Rehabilitation Sign-off in Queensland

    By P Swart, A Fletcher, P D. Erskine

    Glencore Coal Assets Australia (GCAA) operates five coalmines in Queensland and has rehabilitated thousands of hectares of mined land across these sites. Accordingly, GCAA seeks to continually improve

    Jun 28, 2016

  • AUSIMM
    A Resume of the Results of Iron Ore Exploration in Western Australia

    The results of iron ore exploration in Western Australia between '1961 and 1964 are outlined, with particular.reference to the Hamersley Iron Province. Exploration during: these three years has

    Jan 1, 1964

  • AUSIMM
    Improved recoveries and environmental outcomes from complex ores utilising EcoTechnology

    By M Noakes

    EcoTechnology refers to a series of potential metallurgical processes for complex ores, concentrates, tailings and slags that are all based on an initial chlorination step at low to moderate temperatu

    Nov 21, 2018

  • AUSIMM
    Construction of A Sewer Pipeline of 1 200 MM Internal Diameter by A Pipe Jacking Method Using A Small Tunnel Boring Machine

    This is a brief introduction of a sewer pipeline constructed with a pipe jacking method in combination with a 1 200 mm finished inner diameter tunnel boring machine developed for the first time in

    Jan 1, 1987